16 UKRAINIAN COMMUNITIES PARTICIPATING IN THE NATIONAL PAVILION "UKRAINE AND ITS COMMUNITIES" ARE PREPARING RECONSTRUCTION AND INVESTMENT PROJECTS FOR EFFECTIVE NEGOTIATIONS WITH PARTNERS
The information is updated as the projects are ready
VINNYTSIA CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE AIRPORT BUILDING OF VINNYITSIA AIRPORT, ME
The reconstruction involves compliance with all accessibility and inclusion requirements, as well as the construction of housing.
According to the project it is envisaged division the terminal into 2 sectors: international flights and domestic flights. The capacity of the international flights sector is 320 passengers per hour, and the capacity of the domestic flights sector is 80 passengers per hour. The total capacity of the terminal will be 400 passengers per hour. A car park with 151 car parking spaces is also planned.
ESTIMATED COST: 19 110 816 $
VINNYTSIA CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF AISTRIP OF THE VINNYTSIA AIRPORT, ME
The reconstruction project will provide for extension of existing artificial runway from 42 to 45 km and meeting ICAO requirements for dimensions of 2,500m x 45m and with fortified roadsides in both sides – 1,5 km. Reconstruction of the artificial runway will allow to provide unlimited service of aircrafts Boing – 737-800 and Airbus A320 and also corresponds to the II landing category of ICAO (landing in law visibility conditions).
ESTIMATED COST: 66 357 000 $
VINNYTSIA CITY TERRITORIAL COMMUNITY
CONSTRUCTION OF ADMINISTRATIVE AND TECHNICAL BUILDING WITH AN AIRFIELD CONTROL TOWER AT THE VINNYTSIA AIRPORT, ME
On 06 March 2022, a missile strike destroyed the command and control centre with an air traffic control tower.
According to the technical report on the inspection of the destroyed property, the building was declared an emergency and is subject to demolition.
The project will provide for the construction of a new airfield control tower.
ESTIMATED COST: 5 441 274 $
RUBIZHANSKA TERRITORIAL COMMUNITY
RESTORATION OF FUNCTIONING OF THE DESTROYED DOMESTIC WASTEWATER TREATMENT FACILITIES AND THE CENTRALISED SEWAGE SYSTEM
The Project implementation includes:
- construction of treatment facilities for biological treatment of domestic wastewater;
- reconstruction of the existing centralised sewage system;
- construction of a collector for discharging treated water into a natural reservoir.
ESTIMATED COST: 11 000 000 $
RUBIZHANSKA TERRITORIAL COMMUNITY
CONSTRUCTION OF A PLANT FOR RECYCLING CONSTRUCTION WASTE
The aim of the project is to reduce the environmental burden and promote sustainable community development.
The necessary material for recycling is already available in the community - it is construction waste left over from the hostilities.
Project implementation includes:
- planning and design of the plant;
- construction works;
- procurement of necessary equipment and technologies;
- organising the process of collecting and sorting construction waste; setting up mechanisms for its processing and reuse; creating a programme for monitoring and controlling the quality of waste processing and use.
ESTIMATED COST: 10 000 000 $
SEVERODONETSK CITY TERRITORIAL COMMUNITY
RESTORATION OF HEAT SUPPLY SYSTEMS
The heat supply systems (boiler equipment and heating networks) in Severodonetsk were severely damaged and worn out as a result of the hostilities.
The city's heating networks are more than 150 km long and provide district heating to more than 100,000 people.
The restoration of heat supply systems will help restore life and normal conditions for the city's residents.
ESTIMATED COST: 30 000 000 $
SEVERODONETSK CITY TERRITORIAL COMMUNITY
NEW SEWAGE TREATMENT FACILITIES FACILITIES
The construction of new 8,000 m³/day wastewater treatment plants will allow will allow to solve the issue of water supply and sewage and eliminate the need to pump wastewater for treatment to Severodonetsk Azot.
The treated wastewater must meet the requirements set by the Ukrainian Water Resources Agency and EU legislation for discharge into the Siverskyi Donets River.
ESTIMATED COST: 22 000 000 $
SEVERODONETSK CITY TERRITORIAL COMMUNITY
«NEW ENERGY» PROJECT – CONSTRUCTION OF OF A WASTE INCINERATION PLANT
Efficient utilisation of municipal solid waste (MSW), generation of heat and electricity from alternative sources, solving ecological problems of environmental pollution, creation of additional jobs and increase in tax revenues to the local budget. The construction of the incineration plant will help solve a number of problematic issues:
- solid household waste is disposed of without harming the environment;
- energy after incineration of solid waste is converted into electricity and heat, which provides the community with an energy resource
ESTIMATED COST: 90 000 000 $
POPASNA CITYTERRITORIAL COMMUNITY
IMPLEMENTATION OF PRIORITY URGENT MEASURES TO PROVIDE DRINKING WATER WITHIN THE SETTLEMENTS OF THE POPASNA CITY TERRITORIAL COMMUNITY
Goal of the project: to provide water supply services to residents by restoring the functioning of wells, drilling new wells, and constructing a water pipeline from Kalino-Popasna village to Popasna.
ESTIMATED COST: 4 150 000 $
POPASNA CITYTERRITORIAL COMMUNITY
CREATION OF A THERMAL POWER PLANT
To build a thermal power plant with a capacity of up to 1 MWh using alternative fuels in the Eastern Region Industrial Park in Popasna:
● Increasing of economic potential of the territorial community
● Creating infrastructure for business development
● Obtaining additional sources of energy using alternative fuels and complying with environmental safety standards within the industrial park
ESTIMATED COST: 2 060 000 $
POPASNA CITYTERRITORIAL COMMUNITY
INTRODUCTION OF SEPARATE HOUSEHOLD WASTE COLLECTION
● Creating a comfortable, safe and energy-efficient environment
● Ensuring energy efficiency and environmental protection
● Improving environmental safety in the community through the introduction of a separate household waste collection system
ESTIMATED COST: 1 200 000 $
OVRUCH CITY TERRITORIAL COMMUNITY
ATTRACTIVENESS
RECONSTRUCTION OF A BARRACKS INTO A RESIDENTIAL BUILDING
According to the project, the reconstruction included building of 48 apartments. In 2021, 12 apartments were completed and put into operation. Due to lack of financial resources, the project was suspended.
The implementation of the above project will provide 126 internally displaced persons with housing.
ESTIMATED COST: 3 155 000 $
KRAMATORSK CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF RESIDENTIAL BUILDING
Complete reconstruction of a house for 130 residents destroyed by rocket attacks.
The main list of reconstruction works:
● partial dismantling of destroyed constructions
● reconstruction of the roof and installation of a metal tile roof and drainage system;
● installation of solid belt;
● installation of a wooden rafter system;
● installation of a balcony slab;
● restoration of brickwork walls in placed of damage
● repairing cracks in the brickwork of load-bearing walls;
● installation of a rigid metal strapping of the building;
● construction of porches, canopies, staircases;
● installation of window and door units;
● local repair works;
● installation of a house insulation system;
● installation of paving and accessibility elements for residents;
● restoration of in-house engineering networks.
ESTIMATED COST: 1 365 174 $
KRAMATORSK CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF RESIDENTIAL BUILDING
Complete reconstruction of a house for 50 residents destroyed by rocket attacks.
The main list of reconstruction works:
● total dismantling of destroyed constructions;
● construction of external load-bearing walls, partitions, staircases and landings, and interfloor overlaps;
● installation of an insulated roof system;
● repair of ventilation duct masonry and installation of umbrellas;
● repair of brickwork of load-bearing walls
● installation of porches and canopies;
● installation of window and door units;
● local repair works;
● arranging a shelter in the basement of a residential building;
● finishing of stairwells;
● installation of a house insulation system;
● installation of paving and accessibility elements for residents;
● restoration of in-building utilities, including the gas supply system.
ESTIMATED COST: 1 914 210 $
KRAMATORSK CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF RESIDENTIAL BUILDING
Complete reconstruction of a house for 180 residents destroyed by rocket attacks.
The main list of reconstruction works:
● partial dismantling of destroyed and damaged constructions
● installation of brickwork on the walls of the technical floor;
● coating installation;
● installation of roofing layers and roof fencing;
● installation of ventilation ducts and umbrellas;
● installation of roof access structures;
● installation of fire escape hatchs at the technical floor;
● installation of a drainage system;
● installation of gas block partitions in apartments;
● installation of porches and canopies;
● installation of window and door units;
● finishing of apatments and stairwells;
● installation of a house insulation system;
● installation of paving and accessibility elements for residents.
ESTIMATED COST: 2 544 365 $
KRAMATORSK CITY TERRITORIAL COMMUNITY
COMPLEX CONSTRUCTION OF RESIDENTIAL NEIGHBOURHOOD «EUROPEISKY»
The goal of the project: Providing with housing 961 internally displaced persons
The first stage: four houses for internally displaced persons with a total living area of 30.4 thousand square metres. The total number of apartments is 557. One of the buildings is planned to have a built-in kindergarten for 60 children. The construction technology is monolithic frame with ceramic brick walls.
ESTIMATED COST: 33 173 207 $
MARIUPOL CITY TERRITORIAL COMMUNITY
MARIUPOL REBORN
Ukraine's international partners, European cities and Ukrainian business, together with the Mariupol City Council, united to rebuild the city according to the best global practices. Currently, the EBRD, the USAID Project "Economic Support of Ukraine", the municipalities of Utrecht, Vilnius, Gdańsk and Lviv, businesses of Ukrainian businessman Rinat Akhmetov, international communities of urban planners and architects have already joined in supporting Mariupol Reborn. The project is open to new partners who want to help bring the Ukrainian Mariupol back to life.
ОЦІНОЧНА ВАРТІСТЬ: 33 173 207 $
KREMINNA CITY TERRITORIAL COMMUNITY
RENEWAL OF THE SYSTEMS OF WATER SUPPLY AND DRAINAGE
The project objectives: to restore underground drinking water intakes, water pumping stations, administrative buildings, water distribution networks and supply consumers with drinking water. Construction of modern sewage treatment facilities to treat domestic wastewater and improve the environmental situation in the community. Providing consumers with high quality drinking water.
The project envisages the organisation of a modern production facility for the extraction and bottling of drinking water into PET bottles.
ESTIMATED COST: 7 414 390, 2 €
KREMINNA CITY TERRITORIAL COMMUNITY
AGRICALTURAL PROCCESED HUB
Project objective: through the introduction of grain and industrial crops processing, 12 agricultural businesses will receive added value for their products and expand their markets.
The sale of processed products solves the problem of providing food for the community and neighbouring communities, creating opportunities for sustainable rural development, which ensures the growth, diversification and efficiency of the rural economy, stabilising the population in the post-war period, and creating at least 40 new jobs.
ESTIMATED COST: 4 550 000 €
LUHANSK REGIONAL STATE ADMINISTRATION
RESTORATION AND MODERNISATION OF THE MAIN WATER SUPPLY LINE
WESTERN FILTRATION STATION 1, BILOGORIVKA - ANTHRACITE, LUHANSK REGION
Project objectives:
• Creating of conditions for giving population high quality centralized water supplying service.
• Rendering settlements of Luhansk region with stable and qualitative water supply.
• The project will create conditions for stable water supply to industrial enterprises and the population of approximately 1 million people.
ESTIMATED COST: 270 913 920 $
LUHANSK REGIONAL STATE ADMINISTRATION
BUILDING AN AGRO-LOGISTICS HUB AND AGRO-CLUSTERS CREATING
Project objectives: restoration of the agricultural sector in the project areas with the involvement of communities affected by the armed aggression of russian federation, creation of new jobs, and improvement of the investment climate in the region.
Providing services in organising the procurement, processing and storage of agricultural products from local agricultural producers, improving the efficiency of supplying agricultural producers with commodities and materials.
Promotion of local agricultural products in the domestic and foreign markets.
The project will be an effective tool to stimulate the development of the domestic regional market and rural areas.
Objects for construction: warehouses loading/unloading complex; silos; truck service station; administrative building; laboratory.
ESTIMATED COST: 20 000 000 $
LUHANSK REGIONAL STATE ADMINISTRATION
CONSTRUCTION OF A REGIONAL LABORATORY FOR TESTING AGRICULTURAL PRODUCTS AND FOODSTUFFS
Project objectives: ensuring the full functioning of the regional veterinary medicine laboratory accredited according to the international standard DSTU: ISO/IEC 17025.
Development of laboratory and diagnostic work of disease diagnostics which common to humans and animals, assessment of the quality and safety of animal and plant products (including raw materials), food products, feed and feed additives. Improvement of the epidemiological, epizootic and phytosanitary situation in Luhansk region.
Scop of work: reconstruction, overhaul and technological equipment of laboratory.
ESTIMATED COST: 12 300 000 $
LUHANSK REGIONAL STATE ADMINISTRATION
RECOVERY OF THE INFRASTRUCTURE OF IRRIGATION SYSTEMS
Project objectives: Implementation of climate-optimised agriculture in Luhansk region. Increase soil fertility and productivity.
Modernization of buildings and renovation of water supply channels at the irrigated lands will give opportunity to get in 4% more of gross harvest of agricultural crops due to the higher yields on irrigated land. Modernization of irrigation systems can provide average annual growth of gross regional product in 4-5,2% points and also to promote growth of export potential of the region.
ESTIMATED COST: 129 510 000 $
HULIAIPOLE CITY TERRITORIAL COMMUNITY
SCHOOL RECONSTRUCTION
The institution is the main one, the largest in the community (design capacity - 505 pupils), and will have branches in the future. The institution is located in the centre of Huliaipole and meets the educational needs of the community's children from both the city and rural settlements, i.e. the entire community. Three other educational institutions in the community have been fully or partially destroyed, one of which is beyond repair.
Project goal: improving the quality of educational services, creating a qualitatively new motivating, convenient and safe educational environment, ensuring comfortable conditions for students and teachers in the institution. In addition to modern designs, safe shelters have been designed.
The rapid reconstruction of the facility will facilitate the early return of residents to the community, with confidence in the provision of basic services.
ESTIMATED COST: 3 000 000 €
HULIAIPOLE CITY TERRITORIAL COMMUNITY
CONSTRUCTION OF SOVREMENNIK THE CULTURAL AND SPORTS COMPLEX WITH A SWIMMING POOL
This project is intended to rebuild the Suchasnyk Sports Complex, which was mercilessly destroyed by terrorist missiles and air strikes.
Suchasnyk was a cultural centre that met the cultural, leisure and sports needs of the population.
There were 5 municipal institutions and establishments operating on the basis of the Suchasnyk Sports Complex: a culture and leisure centre, a library, a children's art school, and a children's youth sports school. The building contained 2 concert halls, one of which was in the final stages of reconstruction for a 3-D cinema at the beginning of the full-scale invasion of russia.
Project goal: preservation of the main cultural and sports facility of the community. This complex will enable professional competitions, sports and recreational activities, and cultural and entertainment events, while the swimming pool, which is a dream of the residents, will contribute to a healthy lifestyle.
ESTIMATED COST: 50 000 €
HIRSKE CITY TERRITORIAL COMMUNITY
DESALINATION OF MINE WATER
Desalination of mine water and processing of concentrates by leaching out mineral impurities in the form of non-toxic precipitates suitable for the production of building materials.
Project provides for:
- purification stations
- reagents composition
- building of administrative and amenity complex
- laboratories
- TS 6/0,5 kW
Project goal: water supplement the population.
ESTIMATED COST: 4 000 000 €
LYSYCHANSK CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF MUNICIPAL WASTEWATER TREATMENT FACILITIES
The decisions made in the project include the introduction of a technology for treating household wastewater for 30,000 residents of the neighbourhood, and improving the ecological condition of the Bilenka and Siverskyi Donets rivers.
ESTIMATED COST: 3 800 000 $
CHERNIHIV CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE WATER PUMPING STATION
As a result of russian military operations, the water pumping station No. 2 Podusivka of the Chernihivvodokanal utility company, which provides 34% of the city's total water consumption and had a maximum capacity of 30,000 m3/day, was severely damaged.
This project involves the reconstruction of the water pumping station and the construction of a water treatment plant using modern energy-efficient technologies, the construction of a solar power plant and the use of heat pumps. In addition, the use of the latest technologies and the construction of the water treatment plant will allow for the removal of excess iron and manganese.
ESTIMATED COST: 36 600 000 €
CHERNIHIV CITY TERRITORIAL COMMUNITY
SEWAGE TREATMENT PLANT OF CHERNIHIV
Sewage treatment plant was designed and built more than 60 years ago. As a result, it uses inefficient, outdated equipment that cannot provide acceptable quality of wastewater treatment from nitrogen and phosphorus compounds, as the chemical composition of the wastewater has changed significantly since the plant was designed.
ESTIMATED COST: 35 566 000 €
CHERNIHIV CITY TERRITORIAL COMMUNITY
RECONSTRUCTION AND MODERNISATION OF THE CHERNIHIV HEAT AND POWER PLANT WITH THE CONSTRUCTION OF A WASTE PROCESSING PLANT
As a result of enemy shelling, Chernihiv CHPP suffered significant damage. To ensure heat supply in the city, it is necessary to restore and modernise the heat-generating equipment. In addition, the project envisages the construction of a waste recycling plant (approximately 100,000 tonnes of waste per year).
ESTIMATED COST: 35 566 000 €
KRYVYI RIH CITY TERRITORIAL COMMUNITY
RESILIENCE OF THE HEAT SUPPLY SYSTEM TO BLACKOUTS. INSTALLATION OF BLOCK BOILERS AT MUNICIPAL FACILITIES
To minimise the risk of blackouts, ensure reliable heat supply, reduce fuel and energy consumption, and reduce CO2 emissions, it is necessary to install block boilers at municipal facilities.
Decentralisation of the heating system for healthcare facilities where military personnel, IDPs and city residents are treated will ensure a stable treatment and rehabilitation process, as well as independence from centralised heating for hospitals and other consumers.
ESTIMATED COST: 4 525 000 €
KRYVYI RIH CITY TERRITORIAL COMMUNITY
PURCHASE OF BURNERS FOR BOILER HOUSES OF KRYVORIZHTHEPLOMEREZHA
The project will reduce dependence on russian gas supplies, reduce emissions of harmful gases (CO, CO2, NOx) into the atmosphere, improve the efficiency of the heat supply utility and increase the effectiveness of the use of budgetary resources.
ESTIMATED COST: 6 650 000 €
ENERHODAR CITY TERRITORIAL COMMUNITY
A COMPLEX FOR SORTING AND PROCESSING SOLID HOUSEHOLD WASTE, CONSTRUCTION WASTE, WOOD AND WORN-OUT TYRES
Given the rapidly growing volume of waste and environmental pollution, the issue of efficient use of resources and waste recycling is very important. Waste recycling has a significant positive impact on the ecology and the natural environment, helping to conserve resources, reduce emissions, create new jobs and raise environmental awareness.
In the city of Enerhodar it is used an old waste management system that only ensures the collection and accumulation of solid waste at the landfill, which has a negative impact on the city's environment. The project will build a new semi-automatic sorting line for separately collected solid waste with a capacity of 30,000 tonnes per year. This line will process and send for recycling 60-70% of the city's waste, including paper, glass, plastic, metal, construction materials, wood and tyres. It is planned to use a portion of the waste that cannot be recycled into RDF fuel as a source of renewable energy.
ESTIMATED COST: 58 911 974, 06 €
TROSTYANETS CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF SEWAGE TREATMENT PLANT IN TROSTYANETS
The goal of this project is a full reconstruction of the central sewage treatment plant whis was buit in the 70s of the last century and increasing their capacity to 2,000 cubic metres.
Social significance of the project: the reconstruction of the sewage treatment plant will help improve the quality of water disposal for the community. This is important to ensure the vital needs and health of citizens. The reconstruction will help improve the environment and conserve water resources. This will help reduce environmental pollution and increase resilience to climate change.
Finally, this project also has a social impact through the creation of jobs during the reconstruction and maintenance of infrastructure, which affects the development of the community.
ESTIMATED COST: 3 800 000 $
SEVERODONETSK CITY TERRITORIAL COMMUNITY
«RESUMPTION OF PASSENGER TRAFFIC» PROJECT
To preserve the concept of Severodonetsk Trolleybus Administration as an environmentally friendly mode of transport and to quickly solve the problem of passenger transportation, the company is considering the purchase of 20 electric buses with a range of 200 km and 120 kWh chargers.
It is 100% eco-friendly transport, makes it possible to organise any city route (no track and network binding), it is the best social transport for all segments of the population, and will save the budget for their maintenance.
ESTIMATED COST: 13 500 000 $
MARIUPOL CITY TERRITORIAL COMMUNITY
MARIUPOL REBORN
Ukraine's international partners, European cities and Ukrainian business, together with the Mariupol City Council, united to rebuild the city according to the best global practices. Currently, the EBRD, the USAID Project "Economic Support of Ukraine", the municipalities of Utrecht, Vilnius, Gdańsk and Lviv, businesses of Ukrainian businessman Rinat Akhmetov, international communities of urban planners and architects have already joined in supporting Mariupol Reborn. The project is open to new partners who want to help bring the Ukrainian Mariupol back to life.
ОЦІНОЧНА ВАРТІСТЬ: 13 500 000 $
KREMINNA CITY TERRITORIAL COMMUNITY
RECONSTRUCTION, REBUILDING AND RENOVATION OF THE CRITICAL TRANSPORT INFRASTRUCTURE
Project objectives: to restore the functionality of the community's critical transport infrastructure, repair damaged roads, bridges, street lighting lines, ensuring safe and efficient transport links for 21,968 residents, businesses and 1,211 small and medium-sized enterprises and visitors to the community.
The project will improve connectivity inside and outside the community, facilitating the displacement of people from nearby communities and the entire Luhansk region, which is about 500,000 people. Residents will have enhanced access to the main services, schools, healthcare facilities and job opportunities, to support social integration and economic development.
ESTIMATED COST: 58 911 974, 06 €
KREMINNA CITY TERRITORIAL COMMUNITY
A COMPLEX FOR ECOLOGICAL RECYCLING OF CONSTRUCTION WASTE AND FURTHER PRODUCTION OF BUILDING MATERIALS
Through the implementation of this project, the Kreminna community will be able to receive and purchase specialised equipment and machinery for the relevant works, and a jaw industrial crusher for crushing concrete into fractions, a sorting line for solid waste, a concrete mixing unit and a cement storage silo will be installed and tested.
The company will employ 25 people and provide services to 21,968 residents of the community. The process of dismantling the destroyed and damaged infrastructure has been organised with the involvement of representatives of the State Emergency Service and the police.
ESTIMATED COST: 2 236 346, 73 €
KREMINNA CITY TERRITORIAL COMMUNITY
RENEWAL OF THE MUNICIPAL MACHINERY FLEET
The objective of the project is to purchase municipal equipment to ensure comprehensive maintenance of the community territory and provide services to residents. The equipment will be used to eliminate the consequences of the destruction, remove debris, restore the work of the housing and communal services sector, maintain amenities, provide administrative and social services, ensure a sustainable educational process, and transport community residents.
ESTIMATED COST: 2 525 804.87 €
LUHANSK REGIONAL STATE ADMINISTRATION
REBUILDING OF THE DEMAGED MOTORWAY BRIDGES AT THE MAIN TRANSPORT INTERSECTIONS AND DIRECTIONS
Project objectives: Restored objects will provide the proper transport communication of fulfilling the top priority measures for restoring the region’s vital activity.
ESTIMATED COST: 36 000 000 €
HIRSKE CITY TERRITORIAL COMMUNITY
LOGISTICS CENTER
Logistics centre for the storage of industrial raw materials, finished products with cargo terminals and packaging workshops.
The project goal is to create a business to employ people and provide the region with a centre for the storage of raw materials with a truck parking lot and the ability to carry out vehicle maintenance. This is a huge «warehouse city» where the whole range of cargo handling operations is performed. After the de-occupation of the community, the issue of large-scale reconstruction will arise, and this means storing various building materials and timber that need to be stored in rows, stacks, rolls, containers, cages, bales, boxes, racks, pallets, stacking bases, etc. in closed and dry rooms, under a canopy or covered with moisture-proof material.
ESTIMATED COST: 90 000 000 €
LYSYCHANSK CITY TERRITORIAL COMMUNITY
NEW CONSTRUCTION OF A BRIDGE
Lysychansk community is located on the bank of the Siverskyi Donets River. There are 4 bridges between the community and neighbouring communities in Luhansk, Kharkiv and Donetsk regions. As a result of the armed aggression of russian federation, all bridges were destroyed and are not suitable for use. The construction of a bridge with the highest capacity will ensure further gradual development of the city and solve the issue of providing the community with the necessary resources as a matter of priority.
ESTIMATED COST: 10 000 000 $
CHERNIHIV CITY TERRITORIAL COMMUNITY
RESTORATION AND MODERNISATION OF THE TRANSPORT NETWORK
As a result of the hostilities in the city, about 5 km of the contact network was destroyed and a large number of public transport was damaged:
- overhaul of traction substations;
- purchase of equipment for the maintenance of trolleybuses and buses;
- replacement of worn-out trolleybus overhead line supports;
- overhaul of the building;
- reconstruction and arrangement of the washing and cleaning complex;
- implementation of an automatic fire extinguishing system and fire alarm systems;
- purchase of trolleybus rolling stock;
- purchase of emergency equipment.
ESTIMATED COST: 10 000 000 $
KRYVYI RIH CITY TERRITORIAL COMMUNITY
MODERNISATION OF TRANSPORT INFRASTRUCTURE, ROAD RECONSTRUCTION
Gagarin Avenue is one of Kryvyi Rih's main transport routes, providing traffic for city cars and electric vehicles and connecting three city districts.
The total length of the avenue is 1.75 km, the width is 20 m and the area is 35,000 m². There are 42 high-rise buildings on the avenue. A total of 8,640 people live within the avenue.
The reconstruction of Gagarin Avenue is planned due to a significant increase in the number of traffic loads, which requires strengthening of the roadway structure. The condition of the existing sidewalks, pedestrian crossings and the absence of a bicycle lane and passenger traffic do not meet the appropriate traffic safety requirements.
The reconstruction includes the complete replacement of utilities and communications in the underground part of the avenue.
ESTIMATED COST: 22 200 000 €
RUBIZHANSKA TERRITORIAL COMMUNITY
CONSTRUCTION OF NEW HOSPITAL
In the context of restoring the critical and social infrastructure of the community , it is planned to build a new hospital to replace the destroyed old one. The project is aimed at providing affordable and quality medical care to the residents of community and the surrounding communities. The new hospital will be used as a key medical facility providing a wide range of services, including emergency medical care, outpatient consultations, inpatient treatment and rehabilitation.
ESTIMATED COST: 12 093 000 €
RUBIZHANSKA TERRITORIAL COMMUNITY
CONSTRUCTION FOR ELDERLY PEOPLE
The project envisages the construction of a new facility for the elderly in the Rubizhansk community, which will replace the previous facility destroyed as a result of military aggression.
The main goal of the project is to provide the elderly population with proper living conditions, medical support and social integration.
ESTIMATED COST: 2 350 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
CONSTRUCTION OF A LINEAR ACCELERATOR AT MUNICIPAL CLINICAL HOSPITAL NO. 4
There are more than 1 million cancer patients in Ukraine, with 140,000 people falling ill every year. In Dnipro, the only radiotherapy department is at the regional clinical oncology dispensary, which serves residents of the entire region. This is extremely insufficient. Unfortunately, patients can wait 3 months or more to receive radiotherapy.
In order to provide modern and timely radiotherapy to at least 2,500 cancer patients a year at City Clinical Hospital No. 4, the project will purchase a linear accelerator and design and build a radiotherapy unit.
ESTIMATED COST: 4 500 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE SURGICAL BUILDING OF THE MUNICIPAL CLINICAL HOSPITAL NO. 6
The purpose of the reconstruction: concentration of highly qualified specialists, the most advanced medical and diagnostic equipment, and implementation of the latest treatment technologies.
Expected results: provision of inpatient care that meets modern medical care requirements, significant improvement in the quality of diagnosis and treatment, creation of conditions for comfortable stay of 150 patients and 245 medical staff, increased accessibility for people with limited mobility, implementation of European standards for modernisation of equipment and networks with due regard to energy efficiency requirements, reduction of heat consumption, and energy savings.
ESTIMATED COST: 9 310 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE BUILDINGS OF THE MUNICIPAL INSTITUTION - DNIPRO CITY CHILDREN'S CLINICAL HOSPITAL NO. 6
The project for the reconstruction of the Dnipro City Children's Clinical Hospital No. 6 buildings envisages the creation of a modern medical facility to provide patients with high-tech medical care, improve the conditions of stay for patients (Phase III - 98 beds for children and 41 beds for mothers, Phase IV - 78 beds for children and 34 beds for mothers) and the work of medical staff, increase accessibility for people with limited mobility, implement European standards for the modernisation of equipment and networks, taking into account energy efficiency requirements, reduced heat consumption, energy savings.
ESTIMATED COST: 14 030 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
IMPROVING THE REHABILITATION CENTRE FOR PEOPLE AFFECTED BY THE HOSTILITIES
Municipal Clinical Hospital No. 16 is a multidisciplinary hospital providing round-the-clock emergency and routine care.
In order to improve the rehabilitation and recovery of combat casualties, patients with disabilities and amputees, it is planned to create a modern centre on the basis of the existing rehabilitation centre, which will implement all the principles of inclusiveness for working with patients with disabilities and international protocols for physical rehabilitation of wounded, and will be equipped with modern rehabilitation equipment, devices and simulators.
ESTIMATED COST: 1 300 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
OVERHAUL OF THE OUTPATIENT CLINIC OF GENERAL PRACTICE AND FAMILY MEDICINE NO. 2 OF THE DNIPRO PRIMARY HEALTH CARE CENTRE NO. 11
The overhaul of the outpatient clinic (facades with thermal insulation, insulated basement foundations and walls, windows, roofing, landscaping, porches, and pit) is necessary to significantly improve the working conditions of medical staff, increase the level and quality of medical care for patients, and reduce heat consumption.
ESTIMATED COST: 530 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
«PEREMOHA» LIBRARY HUB – RECONSTRUCTION
The aim of the project is to create a universal multifunctional space for the whole family on the basis of the existing library, a modern transformation of the traditional library into a technological creative comfortable area with a small music hall, a music cafe and a children's interactive museum «Museum of Ukrainian Fairy Tales». Social significance of the project: fostering an internal sense of national identity; the possibility of psychological rehabilitation of people affected by military operations; increasing social capital for vulnerable groups such as young people, the elderly, the disabled, migrants and ethnic minorities; development of the intellectual and creative potential of the local community.
ESTIMATED COST: 1 300 000 €
OVRUCH CITY TERRITORIAL COMMUNITY
OVERHAUL OF THE OVRUCH CITY HOSPITAL PREMISES
Ovruch City Hospital employs 394 medical staff. One of the main tasks of the local authorities is to do everything possible to ensure that citizens receive effective treatment in comfortable conditions.
The project envisages comprehensive thermal sanitation: replacement of windows and roofs, insulation of the facade of the premises, overhaul of part of the roof of the catering unit of the hospital, and insulation of the basement. All of these measures save more than 25% of the funds spent on heating the buildings. But it is primarily about the comfort of patients.
ESTIMATED COST: 806 000 $
OVRUCH CITY TERRITORIAL COMMUNITY
ATTRACTIVENESS OVERHAUL OF THE OUTPATIENT CLINIC PREMISES
The exterior facade of the building of the Ovruch Primary Healthcare Centre does not comply with building standards for the design of healthcare facilities. Major repairs to the facade will solve the problem of increasing heating and air conditioning costs, reduce energy consumption and utility bills; avoid sudden changes in temperature, condensation on the walls or ceiling, which will prevent the appearance of mould, fungus and other pathogens. The overhaul will also help to reduce the harmful impact on the environment, which leads to a reduction in greenhouse gas emissions.
ESTIMATED COST: 114 000 $
KRAMATORSK CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE BUILDINGS OF THE MUNICIPAL PRIMARY HEALTH CARE CENTRE
Bringing into compliance with sanitary and epidemiological requirements with the aim to create comfprtable conditions for the patients.
The project envisaged: ● Overhaul, thermal modernisation of the bulidings● Restoration of broken windows
Every day hospital serves 500 patients.
ESTIMATED COST: 4 603 676 $
KRAMATORSK CITY TERRITORIAL COMMUNITY
OVERHAUL, THERMAL MODERNISATION OF THE BUILDINGS OF MUNICIPAL HOSPITAL NO. 2, WITH THE IMPROVEMENT OF THE ADJACENT TERRITORY
The project envisaged:
● Bringing into compliance with sanitary and epidemiological requirements with the aim to create comfprtable conditions for the patients;
● implementation of thermal modernisation.
Annually hospital serves 26 000 patients.
ESTIMATED COST: 18 360 360 $
MARIUPOL CITY TERRITORIAL COMMUNITY
MARIUPOL REBORN
Ukraine's international partners, European cities and Ukrainian business, together with the Mariupol City Council, united to rebuild the city according to the best global practices. Currently, the EBRD, the USAID Project "Economic Support of Ukraine", the municipalities of Utrecht, Vilnius, Gdańsk and Lviv, businesses of Ukrainian businessman Rinat Akhmetov, international communities of urban planners and architects have already joined in supporting Mariupol Reborn. The project is open to new partners who want to help bring the Ukrainian Mariupol back to life.
ОЦІНОЧНА ВАРТІСТЬ: 4 603 676 $
LYSYCHANSK CITY TERRITORIAL COMMUNITY
LYSYCHANSK CENTER FOR SOCIAL AND PSYCHOLOGICAL REHABILITATION OF CHILDREN
Reconstruction of the dormitory building No. 3 to equip the premises of the Lysychansk Centre for Social and Psychological Rehabilitation of Children and two family-type orphanages with the improvement of the surrounding area.
Project goal: Provision of social and nutritional assistance to community children in difficult living conditions, victims of hostilities, etc.
ESTIMATED COST: 450 000 $
CHERNIHIV CITY TERRITORIAL COMMUNITY
RESTORATION OF THE DAMAGED CHERNIHIV CITY HOSPITAL NO. 2
Chernihiv City Hospital No. 2 sees an average of 500,000 patients and it is the largest hospital in the city, which has been significantly affected by the hostilities. As a result of the damage, a large number of works need to be carried out, which will reduce the consumption of fuel and energy resources, ensure compliance with sanitary and hygienic conditions, minimise the anthropogenic factor and improve the thermal insulation of buildings.
ESTIMATED COST: 3 264 000 $
CHERNIHIV CITY TERRITORIAL COMMUNITY
REHABILITATION CENTRE
Due to the hostilities that have been taking place on the territory of Ukraine since 2014, there is a great need to establish rehabilitation centres for war veterans. The main focus of the projected rehabilitation centre will be physical and mental rehabilitation of both veterans of the Armed Forces of Ukraine and all citizens affected by the hostilities.
The facility is planned to be built in a green area in the city, among the forest, which will facilitate faster recovery. In addition, the location has a well-developed infrastructure and is within easy reach of the capital city of Kyiv.
ESTIMATED COST: 3 264 000 $
BILHOROD-DNISTROVSKYI CITY TERRITORIAL COMMUNITY
CREATION OF REBIRTH - AN INCLUSIVE COMPREHENSIVE REHABILITATION CENTRE
Project objectives: ensuring access to medical, rehabilitation and health services for residents of Bilhorod-Dnistrovskyi district through the construction of Rebirth - a modern comprehensive rehabilitation centre to provide effective and comprehensive rehabilitation of patients with various types of injuries and diseases, which in turn will improve the quality of life and functioning of patients' abilities.
ESTIMATED COST: 7 414 390, 2 €
ENERHODAR CITY TERRITORIAL COMMUNITY
HAPPY NATION - THE PROJECT CENTRE FOR PSYCHOLOGICAL SUPPORT AND MENTAL HEALTH
The war launched by the russian federation against Ukraine has a significant negative impact on the psychological state of children and their parents, which inherently affects the ability and desire to acquire new knowledge and participate in educational processes.
Therefore, today, children, their parents and teachers need psychological support and assistance to cope with the stress and other difficulties of the war. Not everyone recognises that they need help right away, but the full-scale invasion has already changed each of us.
To solve the above problems, the community plans to ensure the operation of the HAPPY NATION - Centre for Psychological Support and Mental Health, which will help establish close ties between participants in the educational process, provide counselling, psychological support and training in stress relief, first aid, as well as conduct remedial classes with students, their parents and teachers.
This centre will be located in the premises of the kindergarten No. 5 and will cover about 5,000 children and adults in the city.
In order to achieve these goals, it is necessary to carry out:
- ongoing repair of premises and purchase of equipment and facilities.
ESTIMATED COST: 7 414 390, 2 €
TROSTYANETS CITY TERRITORIAL COMMUNITY
TROSTYANETS CITY HOSPITAL
The hospital lacks a full-fledged rehabilitation department. The war in Ukraine, the large number of wounded and injured servicemen, the suffering and fear of the country's civilian population, the high level of injuries, including children's injuries, the growing incidence of strokes and heart attacks, and the coronavirus infection of organs and systems have dramatically increased the population's demand for rehabilitation medical services and require urgent measures to establish a rehabilitation department.
Project goal: conducting medical, psychological and social rehabilitation of military personnel and their families, as well as ordinary citizens affected by hostilities.
ESTIMATED COST: 7 414 390, 2 €
TROSTYANETS CITY TERRITORIAL COMMUNITY
TROSTYANETS PRIMARY HEALTHCARE CENTRE
The purpose of this project is to reconstruct a non-residential building to create appropriate medical conditions for the Primary Health Care Centre in the Trostyanets community.
The social significance is that the existing building of the Primary Health Care Centre does not meet modern standards and does not allow to provide quality medical care and treat patients in full. Renovation of this healthcare facility is an urgent need to ensure an adequate level of healthcare for the residents of the Trostyanets community.
ESTIMATED COST: 1 100 000 $
RUBIZHANSKA TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE SCHOOL NO.8
The project's goal is to restore the educational process and implement the reform of a new Ukrainian school for 760 students in the community.
Rubizhne Secondary School No. 8 is considered to be a hub school for the entire community due to its location in the city centre with a well-developed transport infrastructure.
ESTIMATED COST: 4 522 000 €
RUBIZHANSKA TERRITORIAL COMMUNITY
CONSTRUCTION OF THE CULTURAL SERVICES CENTER
The project stipulates the construction of a new cultural services centre to replace the destroyed old one. The aim of the project is to create a new cultural services centre in the Rubizhne community to restore and develop cultural life. The project is aimed at providing access to various cultural events for the city's residents, creating a platform for creative expression and developing local talents.
ESTIMATED COST: 9 850 000 €
RUBIZHANSKA TERRITORIAL COMMUNITY
CONSTRUCTION OF NEW SPORTS PALACE
The project to build a new sports palace in the Rubizhne community is aimed at restoring and developing the sports infrastructure that was damaged as a result of military aggression. The new sports palace will become a venue for various sports competitions, training and fitness activities, which will promote a healthy lifestyle and develop the physical capabilities of the local population.
ESTIMATED COST: 5 450 000 €
RUBIZHANSKA TERRITORIAL COMMUNITY
CONSTRUCTION OF PRESCHOOL EDUCATION INSTITUTION
The goal of the project for restoration of preschool education facilities in the Rubizhne community is to create safe, accessible and quality environment for the learning, development and care of preschool children. The project aims to provide all children with equal access to education, promote their harmonious physical, cognitive, emotional and social development, and support parents in their role as caregivers and educators.
ESTIMATED COST: 8 650 000 €
RUBIZHANSKA TERRITORIAL COMMUNITY
CONSTRUCTION OF NEW SCHOOL
The project objective is to ensure the construction of a new school that meets modern safety and quality standards. This includes construction of premises, electrical system, heating, ventilation, sanitary facilities, installation of necessary equipment and furniture, arrangement of sports grounds, and shelters with regard to energy-efficient technologies.
ESTIMATED COST: 9 044 000 €
RUBIZHANSKA TERRITORIAL COMMUNITY
CONSTRUCTION OF NEW RECREATION PARK
Project tasks include:
Project development and planning: carrying out detailed design of the park, including landscape design, infrastructure, play elements and other components.
Construction and reconstruction: implementation of construction works, including site preparation, planting, installation of play elements, creation of walking paths and other infrastructure.
ESTIMATED COST: 2 087 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
«PEREMOHA» LIBRARY HUB – RECONSTRUCTION
The aim of the project is to create a universal multifunctional space for the whole family on the basis of the existing library, a modern transformation of the traditional library into a technological creative comfortable area with a small music hall, a music cafe and a children's interactive museum «Museum of Ukrainian Fairy Tales». Social significance of the project: fostering an internal sense of national identity; the possibility of psychological rehabilitation of people affected by military operations; increasing social capital for vulnerable groups such as young people, the elderly, the disabled, migrants and ethnic minorities; development of the intellectual and creative potential of the local community.
ESTIMATED COST: 630 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE BUILDING AND PREMISES AND IMPROVEMENT OF THE TERRITORY OF THE MUNICIPAL CULTURAL INSTITUTION
Strengthening Ukrainian local identity. Preservation of the tangible and intangible heritage of national and global significance. Eradication of the imperial-Soviet narrative of the city's russian affiliation. Uniting the community and increasing the subjectivity of Dnipro residents. Creating a real tourist «magnet» Dnipro and an ultra-modern holiday destination for Dnipro residents and visitors.
ESTIMATED COST: 670 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
THE PROJECT HAS INVESTMENT ATTRACTIVENESS
CREATION OF AN OLYMPIC-LEVEL SPORTS COMPLEX
The aim of the project is to ensure the construction of a new school that meets modern safety and quality standards. This includes the construction of premises, electrical system, heating, ventilation, sanitary facilities, installation of necessary equipment and furniture, arrangement of sports grounds, and shelters with regard to energy-efficient technologies.
ESTIMATED COST: 12 000 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE INCLUSIVE RESOURCE CENTRE NO. 3
Social significance of the project: providing qualified support to children with special educational needs, persons with the status of internally displaced persons; ensuring the rights of children with special educational needs aged 2 to 18 to receive preschool and general secondary education, implementing early intervention from 0 to 3 years and creating conditions for a barrier-free future for special children; creation of an educational and rehabilitation resource and methodological educational space as a centre for training and professional development of correctional teachers; integration and socialisation of people with special educational needs.
ESTIMATED COST: 480 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE COMPLEX OF BUILDINGS AND STRUCTURES OF THE OLYMPIC TRAINING BASE OF THE MUNICIPAL ENTERPRISE «WATER SPORTS COMPLEX»
A modern Olympic-level sports space, a sports hub for the local community, an anchor facility for sports competitions of various levels, and the only sports complex in Ukraine that includes it:
- a rowing channel with a measuring distance of 2000 m.;
- a 2000 m long return channel;
- water ski stadium;
- starting system
ESTIMATED COST: 8 000 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
«RED STONE» LIBRARY HUB
Creating an ultra-modern socio-cultural space on the basis of the existing library that stimulates the development of intellectual potential, which will become a platform for the rehabilitation of people with «war syndrome», an educational centre for Ukraine's integration into the global democratic community. The main exclusive space of the library hub will be a library-space of Japanese comic book culture called Manga.
Social significance of the project:
- promotion of book reading;
- psychological rehabilitation of people affected by the hostilities;
- uniting the community around global human values;
- high inclusiveness of the space - involvement of a wide range of categories of citizens, including those requiring special attention.
ESTIMATED COST: 532 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF PREMISES AND ENGINEERING NETWORKS OF THE CHILDREN'S MUSIC SCHOOL
Create a full-fledged centre for children's music education with an integrated department for inclusive music education. Children with disabilities have equal rights to quality education and cultural leisure. An inclusive music school is a platform for developing new methods of providing education and development for such children in a modern city.
Social importance of the project:
- socialisation of children with health problems;
- ensuring equal conditions and opportunities for different children;
- development of new methods and training for teachers working with children who need an inclusive approach.
ESTIMATED COST: 664 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
MUSIC PARK
Creation of a modern park area that encourages holidaymakers, especially children, to master the art of music and join the world musical heritage. It includes a sports entertainment zone, a silence zone, and a music activity zone.
Social importance of the project:
- creation of a recreational recreation area;
- promotion of musical art;
- investing in the development of the city's intellectual potential.
ESTIMATED COST: 248 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
SPORTS COMPLEX OF THE OLYMPIC RESERVE SCHOOL
A modern Olympic-level sports space, a sports hub for the local community and a support facility for sports competitions of various levels. The complex is being created on the basis of the Olympic reserve sports school.
Social importance of the project:
- promoting a healthy lifestyle;
- rehabilitation of combatants;
- training of professional athletes;
- organising and conducting sports competitions of various levels;
- community unity and creation of a sports «magnet».
ESTIMATED COST: 4 520 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE SPORTS COMPLEX AND BUILDINGS
The aim of the project is to build a modern European-level sports complex for holding city, national and international athletics and other competitions by reconstructing the existing complex.
The reconstruction will make it possible to observe and participate in training and competitions in various sports.
After the reconstruction, the sports complex will be able to accommodate 2,100 people, including IDPs.
ESTIMATED COST: 3 020 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE SPORTS CENTRE
The purpose of the reconstruction is to create conditions in the sports complex for training and competitions in various sports. At the same time, the three-storey sports building is being reconstructed to increase its capacity from 98 to 180 people.
Currently, the facility is unfit for use and does not serve the city's residents. After the reconstruction, the facility will be able to accommodate 180 people, including IDPs. The project will improve the provision of sports services for the city's residents.
ESTIMATED COST: 2 700 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
ARTISTIC PARK
Creation of a artistic landscape space located near the library, music school, sports school and cultural and artistic institution, which will become a place of concentration of talented children and a recreation centre for a large residential area of the city.
Social importance of the project:
- creation of a recreational area;
- promoting the activities of Dnipro's municipal creative institutions;
- investing in the development of the city's intellectual potential.
ESTIMATED COST: 258 000 €
DNIPRO CITY TERRITORIAL COMMUNITY
RESTORATION OF CULTURAL HERITAGE (SCHOOL)
Providing general secondary education to children with special educational needs. Creating an innovative educational space as a centre for learning. Socialisation of children with special educational needs. Preservation of the outstanding monument of the German architectural school, built by the German architect Dietrich Thyssen. Creation of a tourist attraction in the city's urban design.
ESTIMATED COST: 310 000 €
OVRUCH CITY TERRITORIAL COMMUNITY
ATTRACTIVENESS
OVERHAUL OF THE LYCEUM PREMISES
The school is attended by 863 pupils. The Lyceum No. 1 building complex to be thermally sanitised consists of 6 independent buildings.
The project envisages thermal sanitation (insulation) of buildings in accordance with the current DBN standards.
The project will reduce heat energy consumption, cut energy bills, create comfortable conditions for the participants of the educational process in the educational institution, bring sanitary and hygienic conditions in the building into line, and increase energy efficiency.
ESTIMATED COST: 834 000 $
OVRUCH CITY TERRITORIAL COMMUNITY
OVERHAUL OF SCHOOL №3
The project envisages a complex of thermal rehabilitation works.
The school is attended by 325 students. The implementation of the project will solve the problem of reducing the level of irrational heat energy consumption, increasing the temperature regime in the institution, reducing the amount of budgetary funds spent on consumed energy carriers, annual savings of heat energy, ensuring comfortable conditions for the educational process.
ESTIMATED COST: 532 000 $
OVRUCH CITY TERRITORIAL COMMUNITY
ATTRACTIVENESS
OVERHAUL OF SCHOOL CANTEEN PREMISES
Canteen has outdated equipment, it was not change from the school foundation (1954), repair works were many years ago. 549 pupils attend Ovruch lyceum No4 of Ovruch City Council and this requires efficient use of time to prepare healthy meals.
Solution to the problem is to modernise the kitchen equipment and repair the canteen and dishwashing facilities of the school canteen, replacing the ventilation system, which allows for sanitary and hygienic conditions, high-quality cooking and safe consumption at minimal cost.
ESTIMATED COST: 53 000 $
OVRUCH CITY TERRITORIAL COMMUNITY
ATTRACTIVENESS
OVERHAUL OF THE CULTURAL CENTRE WITH REPLACEMENT OF EXTERNAL HEATING NETWORKS
The Kyrdany district includes the villages of Kyrdany, Dubovyi Hai, Korchivka with a population of 1587 people. The House of Culture is a cultural centre for local residents, hosting numerous concerts, fairs, master classes, and discussions of socially important issues.
During the rocket attack on the territory of the Ovruch community, the building of the Kyrdanivka Village House of Culture was damaged, 21 windows were damaged. The overhaul of the cultural centre will help to revive the values, traditions and ethnic culture of the Ukrainian people and will become the main place for leisure activities.
ESTIMATED COST: 106 000 $
MARIUPOL CITY TERRITORIAL COMMUNITY
MARIUPOL REBORN
Ukraine's international partners, European cities and Ukrainian business, together with the Mariupol City Council, united to rebuild the city according to the best global practices. Currently, the EBRD, the USAID Project "Economic Support of Ukraine", the municipalities of Utrecht, Vilnius, Gdańsk and Lviv, businesses of Ukrainian businessman Rinat Akhmetov, international communities of urban planners and architects have already joined in supporting Mariupol Reborn. The project is open to new partners who want to help bring the Ukrainian Mariupol back to life.
ОЦІНОЧНА ВАРТІСТЬ: 53 000 $
KREMINNA CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF MEDICAL, RECRIATIONAL AND SPORT INFRASTRUCTURE OF THE KREMINNA COMMUNITY
Competitive advantage of recreational complex is the absence of the similar facilities nearby.
It should also be noted that next to the Kreminna community, there are communities that also lack such facilities. Buildings No. 1 and No. 2 will also be used as a social hotel, which will be equipped with everything necessary, including accommodation for people with disabilities.
Recreational complex will provide the full range of medical, health-improving services and sport rehabilitation.
ESTIMATED COST: 3 630 398 €
IRPIN CITY TERRITORIAL COMMUNITY
IRPIN ART-CENTER
Project objectives: one of the priority directions of community’s development is art and culture. This object will be a kind of magnet for fostering of economic development and city tourism potential.
The idea of new art-center for Irpin was developed by the Austrian architect Gerhard Hauser. The idea is to combine ecological and economic efficient solutions through industrial loft designing from inside. All residents of Irpin will have possibility to develop their creative skills and different foreign artists can organize expositions of their works here. Cool architecture will create the body and frames for almost any kind of performance. New building of art-center will be the symbol of resistance and a strong will to live. Construction of such space will foster not only the art and culture development in Irpin.
ESTIMATED COST: 3 630 398 €
IRPIN CITY TERRITORIAL COMMUNITY
ART SCHOOL
Project objectives: the construction of such a school will make it possible to involve all interested students of Irpin schools in music and painting, which is 10,300 children as of the beginning of the academic year 2023-2024. According to the plan this institution will become the space for holding events of the culture and art sphere of international importance.
Scope of work: the building will be made with blocks: art classrooms, lobby with a green operated roof and a rounded hall. An amphitheater will be located in the educational part. In the school is proposed to create a small but unique for Ukraine children's music museum with interactive exhibits and the opportunity to interact with some important musical instruments.
ESTIMATED COST: 16 204 876 €
IRPIN CITY TERRITORIAL COMMUNITY
THE ROAD OF LIFE, CULTURAL CENTER
In March 2022 the Club was destroyed by russian invaders, it become the witness of courage, valour, despair, death, frustration, deliverance and heroism of Irpin people, who were forced to evacuate from Irpin to save their lives. Photos of the bridge during the evacuation of the townspeople, along with the former Club, went viral.
This place is of great historical and urban significance. The project envisages several compositional directions that will help create a high-quality open space for residents and visitors. It is proposed to create a multifunctional space on the ground floor, which includes a library and a conference room, a museum and exhibition space in which the corten steel wall acts as an emotional installation. A small mobile lecture theatre and a photo exhibition will be set up to commemorate the historical events in Irpin and its heroes.
ESTIMATED COST: 3 752 280 €
IRPIN CITY TERRITORIAL COMMUNITY
CONSTRUCTION OF NEW SCHOOL BUILDING
Before the war, Irpin School No. 1 had 1,200 pupils, which meant 38 classrooms. There were several shell hits to the school buildings and its territory. However, by the beginning of the 2022-2023 school year, the school's infrastructure was restored.
Today, about 85% of residents have returned to the city. Irpin has hosted more than 23,000 internally displaced people. This year, 10,300 children study in Irpin schools. However, the capacity of all the town's gymnasiums and lyceums is just over 8,000 places. To remedy this situation, the city needs to build at least two more schools or construct new buildings.
The new building construction project proposes a complete reconstruction of the old school building, with an increase in its number of storeys to 3 floors. This will make it possible to accommodate 900 more students. The building to be reconstructed will be equipped with a bomb shelter.
ESTIMATED COST: 11 380 782 €
IRPIN CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF BUILING OF THE SCHOOL WITH IN-DEPTH STUDY OF ECONOMICS AND LAW
Before the war, Irpin School No. 2 had 1720 pupils, which meant 52 classrooms. As a result of the hostilities in the community, the school suffered significant damage. However, by the beginning of the 2023-2024 school year, the school's infrastructure was restored.
Today, about 85% of residents have returned to the city. Irpin has hosted more than 23,000 internally displaced people. This year, 10,300 children study in Irpin schools. However, the capacity of all the city's gymnasiums and lyceums is just over 8,000 places. To remedy this situation, the town needs to build at least two more schools or construct new buildings.
The project for the reconstruction of a separate building and the superstructure of additional premises involves the reconstruction of a part of the dining room with the extension of two additional floors for the school's needs. This will allow the school to accommodate twice as many students. The project also provides for the creation of a bomb shelter.
ESTIMATED COST: 4 856 103 €
LYSYCHANSK CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE CULTURE CENTER
Reconstruction of the cultur center to create an educational and cultural centre for children and young people with the improvement of the surrounding area.
Project goal: To create a safe space for children and youth that will provide new opportunities for cultural and artistic self-education, creative and spiritual development.
ESTIMATED COST: 800 000 $
CHERNIHIV CITY TERRITORIAL COMMUNITY
REBUILDING THE DESTROYED LOKOMOTYV STADIUM
The Lokomotiv stadium is home to the Desna specialised children's and youth football school of the Olympic reserve, which currently has 400 pupils. As a result of the shelling, the training facility was damaged and rendered unusable. The project involves the construction of two gyms, a football pitch and a stand. The project has an important social mission: children will be able to practice various sports. This will help to solve the problems of adolescence and engage children in physical education and development.
ESTIMATED COST: 5 170 000$
CHERNIHIV CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE CENTRAL PARK OF CULTURE AND RECREATION
The Central Park of Culture and Recreation in Chernihiv is located in a green area, close to the Desna River and the stadium. The park is a favourite destination for families as it offers entertainment for all tastes. However, a lot of the equipment is outdated and needs to be updated, as it is becoming more and more dangerous to operate every year. The city park plays a big role in the city, as it is one of the places to spend weekends and an opportunity to relax in nature. The park can provide rides for children and adults, bicycle paths, pedestrian paths, zip-lines, extreme recreation and much more.
ESTIMATED COST: 5 170 000$
CHERNIHIV CITY TERRITORIAL COMMUNITY
CLEANING UP THE STRING RIVER AND DEVELOPING MODERN INFRASTRUCTURE
The Stryzhen River is one of Chernihiv's main waterways and flows through the city. Unfortunately, today it is heavily polluted and on the verge of an environmental disaster. The project aims to save the city's ecology and provide infrastructure for residents around the river.
ESTIMATED COST: 5 170 000$
CHERNIHIV CITY TERRITORIAL COMMUNITY
CONSTRUCTION OF A NEW SCHOOL TO REPLACE TWO DESTROYED ONES
As a result of the hostilities in Chernihiv, 70% of educational institutions were damaged, including 2 schools that were completely destroyed and cannot be restored. These schools were located in the same district of the city - Podusivka. With the construction of the new school, we want to replace the two previous existing ones. This will also solve the problem for children and their parents with daily transfers to other schools in other parts of the city, as there are no other schools in the area.
ESTIMATED COST: 5 170 000$
KRYVYI RIH CITY TERRITORIAL COMMUNITY
CONSTRUCTION OF HOUSING FOR CRISIS CASES. RESTORATION AND THERMAL MODERNISATION OF THE PRESERVED PART OF THE DESTROYED RESIDENTIAL BUILDINGS
Project objective
1. Provision of temporary accommodation for residents of the destroyed houses, construction of housing.
2. Ensure that the load-bearing structures of the damaged buildings are reinforced, and complete thermal modernisation of the preserved part of the buildings to ensure safe and comfortable living conditions for the residents.
ESTIMATED COST: 5 170 000$
KRYVYI RIH CITY TERRITORIAL COMMUNITY
CONSTRUCTION OF HOUSING FOR INTERNALLY DISPLACED PERSONS
Almost 80,000 internally displaced people have arrived in Kryvyi Rih since the start of the military aggression.
The shortage of affordable housing and war-related unemployment for many families creates conditions in which they cannot afford to provide a home for a long time.
Today, the issue of providing IDPs with affordable temporary housing in Kryvyi Rih is an urgent one. The aim of the project is to comprehensively restore dormitory buildings (which have not been used for more than 15 years) to residential readiness, which will provide housing for about 500 families.
ESTIMATED COST: 2 200 000 €
KRYVYI RIH CITY TERRITORIAL COMMUNITY
DAMAGED EDUCATIONAL FACILITIES. CONSTRUCTION OF MODULAR CIVIL PROTECTION STRUCTURES
Kryvyi Rih is a frontline city that suffers from missile attacks by the russian federation. The missile attacks are aimed at destroying the city's infrastructure and pose an additional threat to the lives and health of its residents. Since the beginning of hostilities, 76 educational institutions in the city have been damaged. Therefore, one of the main priorities of the authorities, especially since the beginning of the school year, is to ensure the protection of young residents who are eager to learn and acquire new knowledge.
Of the 76 damaged educational institutions, 43 that had the technical capability to do so repaired their shelters at the expense of the city budget. However, to date, this does not fully ensure a safe offline educational process. At present, at least 40 modular protective structures are needed to protect children's lives and health during school.
ESTIMATED COST: 15 000 000 €
KRYVYI RIH CITY TERRITORIAL COMMUNITY
TECHNOLOGY PARK (INNOVATIKA)
The main goal is to reduce labour migration and bring back the city's residents who have moved abroad.
The Technopark project is aimed at creating a leading centre for innovation and research in the areas of ecology, seismicity of construction facilities and rock stability, energy efficiency, mining and geological and military industries.
The Technopark will become a centre for start-ups, researchers and innovators to collaborate and develop innovative solutions in the areas of energy efficiency, mining, geological exploration and military technologies.
ESTIMATED COST: 3 900 000 $
KRYVYI RIH CITY TERRITORIAL COMMUNITY
MODERNISATION OF ENERGY CONSUMPTION SYSTEMS
The project envisages the full or partial thermal modernisation of educational and healthcare facilities, including: modernisation of the heating system with the installation of individual heat points (IHPs) with weather control of the heat carrier, insulation of building structures, attics, replacement of windows and doors with energy-efficient ones, replacement of heat supply networks and other energy-efficient measures.
This will make it possible to reduce energy consumption while ensuring sufficient comfort for students and staff of educational institutions, as well as for healthcare professionals and their patients.
As a result, educational and healthcare facilities will be able to consume almost half as much energy, saving up to 40% of the standard heat consumption and 5% of electricity.
ESTIMATED COST: 19 900 000 €
ENERHODAR CITY TERRITORIAL COMMUNITY
CHILD DEVELOPMENT CENTRE
The Child Development Centre will operate on the basis of the Sopilochka pre-school educational institution No. 16 to provide children from the city and surrounding areas with various forms of education and recreation. The total number of children to be covered is 360.
The facility will create a powerful physical culture and recreational environment. Its main facilities are a gym, a sports ground, and a swimming pool. In order to achieve these goals, it is necessary to carry out:
- overhaul of playgrounds and sports grounds;
- ongoing repair of the gym and purchase of sports equipment;
- overhaul of the swimming pool;
- maintenance of premises, purchase of modern equipment and furniture;
- overhaul of the shelter;
- overhaul of fire and burglar alarms;
- ensuring the integrity of the fence for the safety of participants in the educational process.
ESTIMATED COST: 396 156 €
ENERHODAR CITY TERRITORIAL COMMUNITY
A SCHOOL WHERE YOU WANT TO STUDY
The project will be implemented on the basis of the Enerhodar Multidisciplinary Academic Lyceum, which will cover 1,100 people. The new Ukrainian school envisages changes in key approaches to the educational process. We are moving away from the old and outdated. The newest school is ahead! To do this, we are creating a modern educational space as a necessary component of ensuring a high-quality educational process that will meet modern requirements. Digitalisation will permeate the entire institution and will become large-scale. To implement the tasks, it is necessary to carry out: - major repairs of the facade; - current repairs of premises and purchase of modern equipment; - major repairs of the protective structure of the institution; - major repairs of fire and security alarms and the integrity of the fence for the safety of participants in the educational process; - major repairs of the sports stadium.
ESTIMATED COST: 958 517 €
ENERHODAR CITY TERRITORIAL COMMUNITY
RESTORE THE ADMINISTRATIVE SERVICE CENTRE
The Administrative Service Centre (ASC) is an important institution for improving the quality of life of residents and sustainable development of the city's economy, as citizens can receive a large number of administrative services by visiting only one institution.
Prior to the occupation, the ASC provided 196 administrative services and served not only the city of Enerhodar, but also residents of neighbouring communities for almost 50,000 people.
The re-opening of the ASC is an important step in establishing sustainable life in the city after its de-occupation, allowing citizens to renew necessary documents and receive other administrative services and social benefits and subsidies. Access to basic public services is fundamental for individuals and businesses to recover from the impact of the war.To reopen the ASC, it is necessary to carry out repair and construction works and provide its staff with the equipment necessary to provide administrative services.
ESTIMATED COST: 222 545 €
ENERHODAR CITY TERRITORIAL COMMUNITY
YOUTH HUB AND COORDINATION CENTRE FOR MILITARY AND PATRIOTIC EDUCATION
The establishment of Ukrainian statehood, the building of civil society, and Ukraine's integration into the global and European community involve a focus on the human being. Therefore, it is planned to organise the work of the city's Coordination Centre for National and Patriotic Education and the Youth Hub for 3,445 pupils. To do this, it is necessary to create a centre for practical work with children, a European-style space that will be essentially a centre for practical work with students
In today's environment, with the rise of modern threats and challenges, national and patriotic education is an important security factor, as the main goal for the younger generation is to train and educate selfless citizens, conscious defenders of the Motherland.
In order to achieve these goals, it is necessary to carry out:
- ongoing repair of premises and purchase of equipment for the Youth Hub and the Coordination Centre for Military and Patriotic Education.
ESTIMATED COST: 133 882 €
TROSTYANETS CITY TERRITORIAL COMMUNITY
OVERHAUL AND THERMAL MODERNISATION OF A GENERAL EDUCATION INSTITUTION IN SOLDATSKE VILLAGE
The aim of this project is to comprehensively restore and thermally modernise the destroyed building of a general education institution in Soldatske village, as well as to carry out internal works and improve the area around the school.
The social significance of this project is extremely important, as it aims to ensure safe and comfortable learning for 80 students of the educational institution that was damaged by the Russian army's bombing. The restoration of the school building will help to resume the educational process and create comfortable conditions for children to receive education.
ESTIMATED COST: 594 000 $
TROSTYANETS CITY TERRITORIAL COMMUNITY
RECONSTRUCTION OF THE DINING ROOM-CAFE INTO AN EDUCATIONAL AND CULTURAL CENTRE
The goal of this project is to complete the construction and equipping of the premises of the educational centre, which is aimed at supporting business, attracting investment, developing the youth movement and developing the territory.
The social value is to create a platform for the development of small and medium-sized businesses, which contributes to job creation and economic growth in the region. The educational centre will also be an important resource for attracting investment and supporting new projects, which can contribute to infrastructure development and create new opportunities for the community.
ESTIMATED COST: 1 300 000 $
TROSTYANETS CITY TERRITORIAL COMMUNITY
CREATION OF A MULTIFUNCTIONAL LEISURE CENTRE THROUGH THE REVITALISATION OF THE CITY BOILER HOUSE
The goal of this project is to create a multifunctional leisure centre with a wide range of services, such as a large multipurpose hall, a coworking centre, lounge areas, meeting and Skype rooms, as well as premises for extracurricular and non-formal education.
The social impact of this project is to create an infrastructure for business and entrepreneurship development in the community by providing coworking spaces and meeting rooms. In addition, this centre will become a place for social meetings, events and entertainment for the community, contributing to their leisure and cultural development.
ESTIMATED COST: 464 900 $
DNIPRO CITY TERRITORIAL COMMUNITY
CREATION AND OPERATION OF THE INNOVATION FORPOST INDUSTRIAL PARK
Main objectives
Increasing the investment attractiveness of the city of Dnipro
Increasing the level of business activity in the city, developing small and medium-sized enterprises
creating new industrial facilities using innovative, energy-saving and environmentally friendly technologies;
Saturation of the domestic market with competitive domestically produced goods and services
Increasing the production and export potential of local enterprises;
development of the city's engineering, transport, logistics and market infrastructure;
increase tax revenues to the local and state budgets of Ukraine;
improving the living standards and well-being of city residents by creating new jobs.
ESTIMATED COST: 119 600 000 €
POPASNA CITYTERRITORIAL COMMUNITY
CONSTRUCTION OF THE EASTERN REGION INDUSTRIAL PARK
Project objectives:
● Increasing the economic capacity of the community
● Creating infrastructure for business development
● Improving business infrastructure for the development of small and medium-sized businesses and attracting investment in the region
ESTIMATED COST: 270 300 $
KREMINNA CITY TERRITORIAL COMMUNITY
RESTORATION OF THE NATIONAL PARK - «KREMINNA FORESTS»
The project objectives:
● renovation and preservation of biological and landscape diversity;
● creating of natural complexes, land and water resources, formation of the national eco-networks for preserving historical and cultural values and natural heritage;
● recovery of degraded habitats and ecosystems, 52,058 tree seedlings will be planted, and sustainable protection and conservation of rare and endangered species will be ensured, including by improving water quality of rivers and lakes;
● improvement of ecological balance after the dimining.
ESTIMATED COST: 4 213 910 €
KRYVYI RIH CITY TERRITORIAL COMMUNITY
KRYVBAS INDUSTRIAL PARK
The main goal is to reduce labour migration and return the city's residents who have gone abroad.
The creation of the Kryvbas IP will ensure the formation of mechanisms to meet the demand of investors (participants) for sites prepared for the location of innovative, industrial, logistics and related services, the development of modern production and market infrastructure, small and medium-sized businesses, and the creation of new jobs for city residents and internally displaced persons.
In order to implement the model of the industrial park, including industrial symbiosis of all participants of Kryvbas IP for its development, it is planned to perform tasks aimed at improving environmental, energy and economic indicators that ensure a positive environmental effect and have a minimal impact on the environment.
Establishment and operation of the Kryvbas IP in the city can facilitate the location and launch of relocated enterprises, employment of city residents and internally displaced persons who have moved from the territories where hostilities are taking place or there is a threat of hostilities.
ESTIMATED COST: 3 600 000 $
KRYVYI RIH CITY TERRITORIAL COMMUNITY
RESTORATION OF CRITICAL INFRASTRUCTURE FACILITIES AT KRYVBASVODOKANAL
As a result of russia's destruction of the Kakhovka hydroelectric power station, on which Kryvyi Rih and Kryvyi Rih district depended for 70% of their water supply, more than 740,000 people were at risk of complete dehydration. Since this water intake is the only one in the city and the reservoir is the only source of water intake, it is proposed to create an additional water supply complex to provide water to the city's population in the event of a missile attack on the existing critical infrastructure facility. The missile attack completely destroyed the structures of the left-bank spillway and the building of the lifting mechanisms of the Karachunivsky hydroelectric power station. About 300,000 residents of Kryvyi Rih and neighbouring communities were left without water supply.
The project aims to build a modern water treatment complex with a capacity of 320,000 m3/day at the Karachunivske reservoir, using advanced technologies and equipment, mechanisation and automation.
ESTIMATED COST: 124 743 000 €
KRYVYI RIH CITY TERRITORIAL COMMUNITY
RESILIENCE OF KRYVBASVODOKANAL TO BLACKOUTS. DECENTRALISATION OF ELECTRICITY SUPPLY, CONSTRUCTION OF A SOLAR POWER PLANT.
To minimise the risks of blackouts, which russia is threatening this year, there is a need to build a solar power plant as an additional independent source of electricity, as the shutdown of water supply systems and pumping stations, the lack of water circulation in the system at low temperatures can lead to the complete destruction of the water supply and sewage system and an environmental disaster.
ESTIMATED COST: 7 314 099 $