Illustration

KRAMATORSK CITY TERRITORIAL COMMUNITY

participant of the REBUILD UKRAINE 2023 exhibition and conference

Code of Codifier of administrative-territorial units and territories of territorial communities / CATUTTC:
1412900000

ADDRESS OF THE HEAD OF THE TERRITORIAL COMMUNITY GONCHARENKO OLEXANDR TO THE PARTICIPANTS OF REBUILD UKRAINE 2023

PROJECTS WILL BE PRESENTED AT REBUILD UKRAINE 2023

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

RECONSTRUCTION OF RESIDENTIAL BUILDING

Complete reconstruction of a house for 130 residents destroyed by rocket attacks. The main list of reconstruction works:
● partial dismantling of destroyed constructions
● reconstruction of the roof and installation of a metal tile roof and drainage system;
● installation of solid belt;
● installation of a wooden rafter system;
● installation of a balcony slab;
● restoration of brickwork walls in placed of damage
● repairing cracks in the brickwork of load-bearing walls;
● installation of a rigid metal strapping of the building;
● construction of porches, canopies, staircases;
● installation of window and door units;
● local repair works;
● installation of a house insulation system;
●  installation of paving and accessibility elements for residents;
● restoration of in-house engineering networks.

ESTIMATED COST: 1 365 174 $

  • Utility infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

RECONSTRUCTION OF RESIDENTIAL BUILDING

Complete reconstruction of a house for 50 residents destroyed by rocket attacks. The main list of reconstruction works:
● total dismantling of destroyed constructions;
● construction of external load-bearing walls, partitions, staircases and landings, and interfloor overlaps;
● installation of an insulated roof system;
● repair of ventilation duct masonry and installation of umbrellas;
● repair of brickwork of load-bearing walls
● installation of porches and canopies;
● installation of window and door units;
● local repair works;
● arranging a shelter in the basement of a residential building;
● finishing of stairwells;
● installation of a house insulation system;
● installation of paving and accessibility elements for residents;
● restoration of in-building utilities, including the gas supply system.

ESTIMATED COST: 1 914 210 $

  • Utility infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

RECONSTRUCTION OF RESIDENTIAL BUILDING

Complete reconstruction of a house for 180 residents destroyed by rocket attacks. The main list of reconstruction works:
● partial dismantling of destroyed and damaged constructions
● installation of brickwork on the walls of the technical floor;
● coating installation;
● installation of roofing layers and roof fencing;
● installation of ventilation ducts and umbrellas;
● installation of roof access structures;
● installation of fire escape hatchs at the technical floor;
● installation of a drainage system;
● installation of gas block partitions in apartments;
● installation of porches and canopies;
● installation of window and door units;
● finishing of apatments and stairwells;
● installation of a house insulation system;
● installation of paving and accessibility elements for residents.

ESTIMATED COST: 2 544 365 $

  • Utility infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

OVERHAUL, THERMAL MODERNISATION OF THE BUILDINGS OF MUNICIPAL HOSPITAL No. 2, WITH THE IMPROVEMENT OF THE ADJACENT TERRITORY

The project envisaged:● Bringing into compliance with sanitary and epidemiological requirements with the aim to create comfprtable conditions for the patients;● implementation of thermal modernisation.
Annually hospital serves 26 000 patients.

ESTIMATED COST: 18 360 360 $

  • Utility infrastructure facilities

Illustration
    THE PROJECT HAS INVESTMENT ATTRACTIVENESS

COMPLEX CONSTRUCTION OF RESIDENTIAL NEIGHBOURHOOD «EUROPEISKY»

The goal of the project: Providing with housing 961 internally displaced persons

The first stage: four houses for internally displaced persons with a total living area of 30.4 thousand square metres. The total number of apartments is 557. One of the buildings is planned to have a built-in kindergarten for 60 children. The construction technology is monolithic frame with ceramic brick walls.

ESTIMATED COST: 33 173 207 $

  • Utility infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

RECONSTRUCTION OF THE BUILDINGS OF THE MUNICIPAL PRIMARY HEALTH CARE CENTRE

Bringing into compliance with sanitary and epidemiological requirements with the aim to create comfprtable conditions for the patients.
The project envisaged: ● Overhaul, thermal modernisation of the bulidings● Restoration of broken windows
Every day hospital serves 500 patients.

ESTIMATED COST: 4 603 676 $

  • Utility infrastructure facilities

INTERNATIONAL COOPERATION PRIORITIES

Illustration
    Construction of new housing for internally displaced persons and restoration of residential buildings that were destroyed due to the military aggression of the russian federation.
    Education system sphere
    Healthcare sphere
    City security sphere
    Improving the energy efficiency of the community

GEOGRAPHICAL FEATURES

Illustration
  • TOTAL AREA – 40 497.4 HADONETSK REGION

    Territorial community structure:Kramatorsk city (administrative center)Urban-type settlements: Bilenke, Krasnotorka, Komyshuvakha, Malotaranivka, Shabelkivka, Olexandrivka, Sofiivka, Yasna Polyana, Yasnogirka
    Villages and hamlets: Ashurkove, Semenivka, Vasylivska Pustosh, Pryvilliya, Dmytrivka.

Developed service infrastructure for business:● H20 – it is the motorway of national importance
● T0510, T0514 – motorways of territorial importance in Donetsk region
● M03 – international motorway
● Internal regular and irregular transport system (bus station, subdivisions of transport companies)
● Kramatorsk railway station: intercity, suburban passenger and freight traffic

LANDS AND RESOURCES OF TERRITORIAL COMMUNITY

  • Illustration

    MINERALS - SAND, CLAY MINERAL PIGMENTS, CLAY, CHALK, MUDSTONES

  • Illustration

    RESERVES OF DRINKING AND INDUSTRIAL WATER

  • Illustration

    SHALE GAS DEPOSITS

LIST OF LAND RESOURCES, HA

Illustration

220 000 COMMUNITY RESIDENTS

AS OF 24.02.2022

COMMUNITY DEVELIOPMENT PROGRAMME

    Programme of economic and social development of the city for 2023
    Plan for sustainable energy sector development of Kramatorsk for 2015-2030

COMMUNITY DEVELOPMENT PRIORITIES IN 2023

  • ECONOMIC DEVELOPMENT OF COMMUNITY

    ● development of international relations
    ● improving the efficiency of utility companies and the use of land and municipal property
    ● implementation of a targeted urban planning policy

  • QUALITY OF LIFE AND HUMAN DEVELOPMENT

    ● ensuring decent living conditions
    ● preserving and protecting the health of citizens, access to quality education, improving the quality of public services

  • EFFECTIVE MANAGEMENT AND SECURITY IN THE FACE OF EXTERNAL AND INTERNAL CHALLENGES

    ● addressing social and humanitarian issues
    ● supporting critical infrastructure, preventing and responding to emergencies
    ● development of information space of security system
    ● restoration of the affected residential and non-residential infrastructure

  • ENVIRONMENTAL SAFETY AND SUSTAINABLE USE OF NATURAL RESOURCES

    ● implementation of environmental protection and energy efficiency measures

NUMBER OF SOCIAL INFRASTRUCTURE FACILITIES IN THE TERRITORIAL COMMUNITY

EDUCATION65

CULTURE6

SPORT9

MEDICINE17

IMPLEMENTATION OF STRATEGIC PROJECTS

Illustration

RECONSTRUCTION OF THE ROOF OF THE BUILDING OF THE KRAMATORSK UKRAINIAN GYMNASIUM

Development partner: Government of the Kingdom of Norway through the Norwegian Ministry of Foreign Affairs; Nordic Environment Finance Corporation (NEFCO) as the Manager of the Norwegian-Ukrainian Energy Efficiency Initiative Fund
The project cost was 447 871.35 €
2020

Illustration

RECONSTRUCTION OF THE DORMITORY

The project of opening a dormitory for IDPs was implemented with financial assistance from the European Union.
One two-room and 14 one-room apartments were equipped. The total cost of the works was 268 thousand €.

2018

Illustration

MODERNIZATON OF TRACTION SUBSTATION

Modernization of traction substation which provides work of city’s electrical transport.
The project was implemented with the financial support of the European Union.

The project cost was 1 million 146 thousand 610 €, 80% of this amount was financed by the EU and 20% from the city budget.
2018

Illustration

RECONSTRUCTION OF PUMPING STATION

The project of the United Nations Development Programme (UNDP) in Ukraine «Economic and Social Recovery of Donbas», which included «Reconstruction of the 2nd lift pumping station with the introduction of electrolysis plants for the production of sodium hypochlorite», the project cost was 4,078,987.85 thousand UAH.
2015 - 2016.

Illustration

REPAIR OF THE WATER SUPPLY SYSTEM

Repair of the water supply system at Municipal Non-Commercial Enterprise «City Hospital No. 1». More than 2,000 metres of internal and external water supply and sewerage networks were repaired at the hospital, a new water storage tank was installed and the building where it is located was renovated. The facade of the surgical department building was also insulated.
The repairs were carried out by the United Nations Development Programme with financial support from the Government of Japan, with the total cost of the works amounting to 141,000 USD.
2017

Illustration

OVERHAUL OF THE BUILDING OF THE INFECTIOUS DISEASES DEPARTMENT

Ukrainian Red Cross Society with the support of the Luxembourg Red Cross.
Grant project «Overhaul of the building of the infectious diseases department of the City Hospital No. 1», types of work: replacement of windows with plastic ones, framing of slopes, installation (replacement) of doors and framing of slopes.
The project cost was 1 million 197.2 thousand UAH.
2017

Illustration

INSTALLATION OF VIDEO SURVEILLANCE CAMERAS

«Safe City (Improving the safety conditions for students of Kramatorsk schools No. 4, 5, 11, 17, 25, 35 and kindergarten No. 53 by installing video surveillance cameras)» within the framework of the UNDP Recovery and Peacebuilding Programme for the amount of 562,740.80 UAH.
2018

DIRECTIONS OF LOCAL ECONOMIC DEVELOPMENT

The main specialisations of the administrative centre's enterprises and institutions are machine and instrument engineering, metallurgy, construction materials production, and food industry.
Agriculture and processing are developed in rural areas.

KEY SECTORS OF COMMUNITY'S ECONOMY:

    machine and equipment manufacturing
    electro energy distribution
    supply of steam, hot water and air conditioning
    production of cast iron, steel and ferroalloys
    distribution of gaseous fuels through local pipelines
    trade and intermediation
Illustration
Illustration

«NOVOKRAMATORSK INGINEERING PLANT» PJSC

Europe's largest customised heavy engineering company. Its products are sold to 79 countries. The company manufactures rolling, metallurgical, forging and pressing, mining and lifting and handling equipment.

Illustration

«ENERGOMASHSPETSSTAL» PJSC

The largest Ukrainian manufacturer of special cast and forged products for individual and small-scale production for metallurgy, shipbuilding, energy (wind, steam, hydro, nuclear) and general engineering

Illustration

«KRAMATORSK FERROALLOY PLANT», LTD

One of the largest Ukrainian producers of high-carbon blast furnace ferromanganese. The company sells its products to more than 40 countries. The main product range includes ferroalloys and blast furnace ferromanganese.

Illustration

«FURLENDER WINDTECHNOLOGY» LTD

It manufactures multi-megawatt wind power plants. Specialisation: production, installation, commissioning and maintenance of wind power plants with a capacity of 2.05 MW to 4.5 MW

DISTRUCTIONS

DESTROYED :

    Multi-storey buildings - 442
    Private houses - 1218
    Educational institutions - 47
    Healthcare facilities - 10
    Sports and cultural institutions - 7
    The others (hotels, railway stations) - 12
Illustration

KRAMATORSK COMMUNITY NEEDS YOUR HELP AND SUPPORT IN RECOVERY

GONCHARENKO OLEXANDR

The Head of Kramatorsk City Military Administration

Address: 2, Ploshcha Mury, Kramatorsk, Donetsk region, 84300
Documentation and Records Management Department: +380 (626) 48-55-02
E-mail: au.vog.mrk%40dtohsbo