ADDRESS OF THE HEAD OF THE COMMUNITY – ANDRYI YURCHENKO – TO THE PARTICIPANTS OF REBUILD UKRAINE 2023

PROJECTS THAT WILL BE PRESENTED AT REBUILD UKRAINE 2023

Illustration
    Remote work

RECONSTRUCTION OF THE SCHOOL No.8

The project's goal is to restore the educational process and implement the reform of a new Ukrainian school for 760 students in the community. Rubizhne Secondary School No. 8 is considered to be a hub school for the entire community due to its location in the city centre with a well-developed transport infrastructure.

ESTIMATED COST: 4 522 000 €

  • Social infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

RESTORATION OF FUNCTIONING OF THE DESTROYED DOMESTIC WASTEWATER TREATMENT FACILITIES AND THE CENTRALISED SEWAGE SYSTEM

The Project implementation includes:
- construction of treatment facilities for biological treatment of domestic wastewater;
- reconstruction of the existing centralised sewage system;
- construction of a collector for discharging treated water into a natural reservoir.

ESTIMATED COST: 11 000 000 €

  • Communal infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CONSTRUCTION OF A PLANT FOR RECYCLING CONSTRUCTION WASTE

The aim of the project is to reduce the environmental burden and promote sustainable community development. The necessary material for recycling is already available in the community - it is construction waste left over from the hostilities. Project implementation includes:- planning and design of the plant;- construction works;- procurement of necessary equipment and technologies;- organising the process of collecting and sorting construction waste; setting up mechanisms for its processing and reuse; creating a programme for monitoring and controlling the quality of waste processing and use.

ESTIMATED COST: 10 000 000 €

  • Communal infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CONSTRUCTION OF NEW HOSPITAL

In the context of restoring the critical and social infrastructure of the community , it is planned to build a new hospital to replace the destroyed old one. The project is aimed at providing affordable and quality medical care to the residents of community and the surrounding communities. The new hospital will be used as a key medical facility providing a wide range of services, including emergency medical care, outpatient consultations, inpatient treatment and rehabilitation.

ESTIMATED COST: 12 093 000 €

  • Social infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

Будівництво закладу для літних людей

Проект передбачає будівництво нового закладу для літніх людей в Рубіжанській громаді, що замінить попередній заклад, зруйнований внаслідок військової агресії. Головна мета проекту - забезпечити літньому населенню належні умови проживання, медичну підтримку та соціальну інтеграцію.

Оціночна вартість: 2 350 000 €

  • Social infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CONSTRUCTION OF THE CULTURAL SERVICES CENTER

The project stipulates the construction of a new cultural services centre to replace the destroyed old one. The aim of the project is to create a new cultural services centre in the Rubizhne community to restore and develop cultural life. The project is aimed at providing access to various cultural events for the city's residents, creating a platform for creative expression and developing local talents.

ESTIMATED COST: 9 850 000 €

  • Social infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CONSTRUCTION OF PRESCHOOL EDUCATION INSTITUTION

The goal of the project for restoration of preschool education facilities in the Rubizhne community is to create safe, accessible and quality environment for the learning, development and care of preschool children. The project aims to provide all children with equal access to education, promote their harmonious physical, cognitive, emotional and social development, and support parents in their role as caregivers and educators.

ESTIMATED COST: 8 650 000 €

  • Social infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CONSTRUCTION OF NEW SCHOOL

The project objective is to ensure the construction of a new school that meets modern safety and quality standards. This includes construction of premises, electrical system, heating, ventilation, sanitary facilities, installation of necessary equipment and furniture, arrangement of sports grounds, and shelters with regard to energy-efficient technologies.

ESTIMATED COST: 9 044 000 €

  • Social infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CONSTRUCTION OF NEW RECREATION PARK

Project tasks include:
Project development and planning: carrying out detailed design of the park, including landscape design, infrastructure, play elements and other components.
Construction and reconstruction: implementation of construction works, including site preparation, planting, installation of play elements, creation of walking paths and other infrastructure.

ESTIMATED COST: 2 087 000 €

  • Social infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CONSTRUCTION OF NEW SPORTS PALACE

The project to build a new sports palace in the Rubizhne community is aimed at restoring and developing the sports infrastructure that was damaged as a result of military aggression. The new sports palace will become a venue for various sports competitions, training and fitness activities, which will promote a healthy lifestyle and develop the physical capabilities of the local population.

ESTIMATED COST: 5 450 000 €

  • Social infrastructure facilities

GEOGRAPHICAL FEATURES

Illustration
  • TOTAL AREA – 40 326, 9 HALuhansk region



    Community structure:Rubizhne cityHamlets: Bulgakivka, Varvarivka,Golubivka, Zatyshne, Klymivka, Krutenke, Kudryashivka, Mykhailivka, Pivneve, Skargivka, Prystyne, Progres, Schevchenko

    is located at the crossroads of road and railway lines connecting Luhansk region with other regions of Ukraine
    Located on the left bank of the Siverskyi Donets River

NATURAL RESOURSES 

Noun_100px

CONSTRUCTION MATERIALS

Common construction materials include: limestone, chalk and sandstone.In addition, there are 2 other types of soil: meadow and marsh soil of the Siverskyi Donets River floodplain and sod-podzolic sandy soil. A deposit of construction materials (concrete sands) has been discovered within the city limits.

GREEN SPACES AND WATER

Green spaces are mostly of artificial origin. The city is surrounded by conifer forests. 34 water bodies (lakes and ponds).

VARVARIVKA OIL AND GAS STRUCTURE

A promising oil and gas-bearing structure in Varvarivka was discovered. However, the possibility of its exploitation requires further scientific and geological research.

LIST OF COMMUNAL LAND RESOURCES

Illustration

MECHANISMS OF THE RATIONAL MANAGEMENT OF COMMUNITY LAND RESOURSES AND ATTRACTUON OF THE IVESTMENTS:

    Elaboration of the development programme for land relations at the territory of community
    Organisation and implementation of land management
    Conducting land inventory, regulatory and monetary valuation
    Establishment of land tax rates and land tax exemptions
  • THERE IS A POSSIBILITY OF INVESTMENT IN THE CONSTRUCTION OF BUILDING MATERIALS PRODUCTION IN THE COMMUNITY: AN INDUSTRIAL SITE IS ALLOCATED, THERE IS A POSSIBILITY OF COMMUNICATIONS CONNECTING

56785 COMMUNITY RESIDENTS

As of 01.01.2022

COMMUNITY DEVELOPMENT PROGRAMME

The agreed programmes need to be revised due to changes caused by the full-scale invasion of Ukraine by russia.

    city construction documentation
    programme of social and economic development
    development of the programme for complex reconstruction of the territory of community
    elaboration of spatial development of territories
    renovation of city building documentation

NUMBER OF SOCIAL INFRASTRUCTURE FACILITIES IN THE COMMUNITY

As of 01.01.2022

Education28

Culture19

Sports education4

Medicine2

Administrative buildings34

INDUSTRY AND INVESTMENTS

The largest industrial output in the city is produced by the processing industry. The city has developed warehousing facilities that provide storage of products and services to the material production sectors, the largest of them are:

Illustration

Zorya, LTD SPE

Illustration

Rubizhne Cardboard and Packaging Plant

Illustration

Rubizhne Pipe Plant

Illustration

Triumph, Jewellery Factory

DESTRUCTIONS

Information on the characteristics of damage and the technical condition of social infrastructure ficilities, housing and communal services, housing stock, etc. is currently unavailable and will be created based on the results of inspections of damaged facilities after the de-occupation of the settlements that are part of the Rubizhne City Territorial Community.

ACCORDING TO THE STATE REGISTER OF PROPERTY DAMAGED AND DESTROYED AS A RESULT OF HOSTILITIES:

  • 57

    EDUCATION AND SPORT FACILITIES

  • 5

    MUSEUMS AND LIBRARIES

  • 2

    CHURCHES

  • 4

    ADMINISTRATIVE BUILDINGS

  • 2

    BUS STATION AND RAILWAY STATION

  • 320

    APARTMENT BUILDINGS

Illustration

RUBIZHNE COMMUNITY NEEDS YOUR HELP AND SUPPORT IN RECOVERY