Catalog of projects of Ukrainian communities

17 Ukrainian communities participating in the NATIONAL PAVILION “UKRAINE AND ITS COMMUNITIES” are preparing projects on reconstruction and investment attraction for effective negotiations with partners

Information is updated as projects are ready

  • Illustration

    Lviv city territorial community

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

Modernization of sewage treatment facilities in the city of Lviv

Sewage treatment facilities of Lviv receive 350,000 m3 of sewage per day. In the human equivalent, pollution is 2 million and consumes about 80 MW*hours of electricity per day.
The project envisages the modernization of sewage treatment facilities by installing new sandblasters, replacing blowers and repairing some of the outdated equipment and structures. This will make it possible to urgently reduce the amount of nutrients in the discharge by 50%, as well as reduce electricity consumption by 30%.

ESTIMATED COST: €30 million

    Project cost estimate documentation: Already available.
    Nature of restoration: Modernization of nodes and parts
    Ownership form of the project: Municipal
  • Illustration

    Vasylkiv CITY TERRITORIAL COMMUNITY

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

Construction of the pressure collector of the "water pipeline" on Kyshtanova Street - Soborna II part

● Project Goal: Improvement of the water supply system within the Vasylkiv community, ensuring stable quality and reliability of centralized water supply services, reducing emergencies, water losses, and optimizing energy costs.
Description and Relevance: As part of post-war reconstruction and infrastructure development, the Vasylkiv community proposes the implementation of the second phase of constructing a pressure collector for water supply along Kаштánova Street and Soborna Street. This project is critically important for the community as it aims to address long-standing issues with the emergency situations in water supply networks, as well as to reduce water losses, which will help lower operational costs and reduce the burden on the community's budget.
Expected Results:● Improvement of water supply services: stable water pressure in the network and reduced likelihood of interruptions in water supply.● Reduction of emergencies and water losses: the use of modern equipment and materials will ensure the durability and reliability of the pipeline.● Energy resource savings: optimization of the water supply process will significantly reduce energy consumption required for the system's operation.
Impact on the Community: Through the implementation of the project, residents will receive more stable and high-quality water supply, reduced costs for emergency repairs, and economic benefits from decreased use of energy resources.

ESTIMATED COST: 3 million $

    Project cost estimate documentation: Already available.
    Nature of restoration: Full (rebuild from 0)
    Ownership form of the project: Municipal
  • Illustration

    CHERNIHIV CITY TERRITORIAL COMMUNITY

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CHERNIHIV WASTEWATER TREATMENT PLANT

The wastewater treatment plant was designed and built more than 60 years ago. As a result, it uses inefficient, outdated equipment that cannot provide acceptable quality of wastewater treatment from nitrogen and phosphorus compounds, as the chemical composition of the wastewater has changed significantly since the plant was designed.

ESTIMATED COST: €35 566 000

    Design and estimate documentation of the project: None
    Nature of the reconstruction: Partial
    Type of project ownership: Municipal