17 Ukrainian communities participating in the NATIONAL PAVILION “UKRAINE AND ITS COMMUNITIES” are preparing projects on reconstruction and investment attraction for effective negotiations with partners
Information is updated as projects are ready
Modernization of sewage treatment facilities in the city of Lviv
Sewage treatment facilities of Lviv receive 350,000 m3 of sewage per day. In the human equivalent, pollution is 2 million and consumes about 80 MW*hours of electricity per day.
The project envisages the modernization of sewage treatment facilities by installing new sandblasters, replacing blowers and repairing some of the outdated equipment and structures. This will make it possible to urgently reduce the amount of nutrients in the discharge by 50%, as well as reduce electricity consumption by 30%.
Construction of the pressure collector of the "water pipeline" on Kyshtanova Street - Soborna II part
● Project Goal: Improvement of the water supply system within the Vasylkiv community, ensuring stable quality and reliability of centralized water supply services, reducing emergencies, water losses, and optimizing energy costs.
Description and Relevance: As part of post-war reconstruction and infrastructure development, the Vasylkiv community proposes the implementation of the second phase of constructing a pressure collector for water supply along Kаштánova Street and Soborna Street. This project is critically important for the community as it aims to address long-standing issues with the emergency situations in water supply networks, as well as to reduce water losses, which will help lower operational costs and reduce the burden on the community's budget.
Expected Results:● Improvement of water supply services: stable water pressure in the network and reduced likelihood of interruptions in water supply.● Reduction of emergencies and water losses: the use of modern equipment and materials will ensure the durability and reliability of the pipeline.● Energy resource savings: optimization of the water supply process will significantly reduce energy consumption required for the system's operation.
Impact on the Community: Through the implementation of the project, residents will receive more stable and high-quality water supply, reduced costs for emergency repairs, and economic benefits from decreased use of energy resources.
CHERNIHIV WASTEWATER TREATMENT PLANT
The wastewater treatment plant was designed and built more than 60 years ago. As a result, it uses inefficient, outdated equipment that cannot provide acceptable quality of wastewater treatment from nitrogen and phosphorus compounds, as the chemical composition of the wastewater has changed significantly since the plant was designed.
CONSTRUCTION OF A SOLAR POWER PLANT ON THE ROOFS OF BUILDINGS ON THE TERRITORY OF THE MUNICIPAL ENTERPRISE CHERNIHIVVODOKANAL
This project envisages the construction of 88.29 kW of rooftop autonomous solar power plants (SPP) using photovoltaic modules.
This SPP is designed to supply electricity for the Chernihivvodokanal's own needs to ensure uninterrupted power supply at the critical infrastructure facility during power outages.
Reconstruction of the Podusivka water pumping station at Chernihivvodokanal
The water pumping station No. 2 ‘Podusivka’ was heavily damaged as a result of the Russian military actions. Prior to the full-scale invasion, WPS No. 2 supplied 34% of the total water consumption in Chernihiv, with a maximum capacity of 30,000 m3 per day.
This project involves two phases: the first will see the reconstruction of the water pumping station, and the second will see the construction of a water treatment plant. The reconstruction of WTP No. 2 will use modern energy-efficient technologies, including the construction of a solar power plant and the use of heat pumps. In addition, the use of the latest technologies and the construction of a water treatment plant will allow for the removal of excess iron and manganese.
RECONSTRUCTION OF THE CHEMICAL WATER TREATMENT PLANT OF THE TEPLOCOMUNENERGO MUNICIPAL ENTERPRISE OF THE CHERNIHIV CITY COUNCIL
- provide combined heat and power plant with high-quality desalinated and softened water in accordance with the rules of technical operation;
- increase the capacity of the water softening plant from 130t/h to 200t/h;
- save reagent consumption;
- automate processes at the water treatment plant.
The reconstruction of the chemical water treatment plant at Chernihivska CHPP will improve the automation of the water treatment process and allow to move away from the use of large volumes of chemically hazardous substances and reduce the cost of treated water while improving its quality.
Modernisation of the water supply system and water supply networks
Objective: Providing the population of the Apostolove community with quality drinking water through the reconstruction and modernisation of the community's water supply system.
After the Kakhovka hydroelectric power plant dam was blown up, the community was left without drinking water supply, and the condition of the water supply networks and pump and filter stations deteriorated significantly.
The project to upgrade the water supply system and replace pipelines will primarily meet the need of residents for high-quality drinking water, which will be supplied centrally, without time limits and every day.
Water to the village
The purpose of this project is to replace the existing steel water supply system with a new one made of polyethylene pipes on the section from Zaporizhzhia to the site of the pumping station in Lukashevo village. The technical measures to be implemented under the project will stabilise the operation of the water supply system in this area.
The stable operation of the water supply system should ensure a steady supply of water to the community. Meeting the basic needs of the residents today means improving the quality of life, and a stable water supply in the community means developing the economic environment and the agricultural sector, which prevails in our region.
Improving the quality of water supply means developing the competitiveness and sustainability of our community in today's conditions.
Modernisation and reconstruction of the wastewater system
The project aims to modernise the municipal wastewater treatment facilities in Sumy to improve the quality of wastewater treatment to meet international standards. This will reduce pollution of the Psel River and restore its ecosystem, which will have a significant positive impact on the environmental situation in the region.
The social significance of the project is to improve the quality of wastewater collection and treatment services for 267.4 thousand residents of the Sumy community, as well as to connect new subscribers from neighbouring communities, which will improve the standard of living in the region. In addition, by reducing electricity consumption and maintenance costs, the project will be cost-effective and contribute to the sustainable development of the community.
Installation of solar power plants at the treatment facilities of Miskvodokanal - Municipal Enterprise of the City Council
As of today, the total number of consumers of the Municipal Enterprise Miskvodokanal is 279,900, including 27,000 internally displaced persons.
This project aims to improve the energy independence of Sumy by installing solar power plants at the wastewater treatment plant, which will reduce electricity costs and increase the stability of water supply and sewage. In the event of a complete power outage, the SPPs will provide the minimum necessary power to the treatment facilities.
Installation of solar power plants at water intakes of the Miskvodokanal- Municipal enterprise of the Sumy City Council
Miskvodokanal provides centralised water supply services to 256,000 residents of the community and centralised sewerage services to 218,000 residents. The installation of alternative power sources with storage systems at the company's water intakes will allow it to supply the community's residents under any conditions. The goal of this project is to provide the water pumping stations of the city's drinking water supply system with electricity, at least in the minimum required amount, during the period of complete absence of grid electricity.
Reconstruction of a part of the pumping station building for a drinking water bottling area at the Prishybsky water intake
Providing the residents of the Sumy community with safe drinking water in case of emergency in the war by purifying and packaging drinking water.
Packaging machines are required in case of water supply system failures, secondary contamination of water, natural disasters or other emergencies, as they guarantee a continuous supply of bacteriologically safe water. This possibility of safe water supply minimises the risk of poisoning people.
This technology will help save on transport costs, as the packages can be delivered by passenger cars rather than by special, fuel-consuming vehicles that are usually used to transport process water.
Development of a centralised water supply system
Provision of drinking water to consumers in the Kursk district of Sumy, Pishchanskyi and Stetskivskyi starosta districts.
Sustainable development of the city's centralised water supply system.
Currently, Verkhne Pishchane village residents are supplied with water through 2 operating wells and a water tower. For technical reasons, further operation of these wells is impossible due to the inconsistency of water quality with the current sanitary standards.
The project includes the construction of a separate water intake in Verkhne Pishchane village with the construction of new water pipelines.
Reconstruction of a section of the main sewer on Khimikov Avenue
Stable and continuous provision of quality centralised wastewater services, reducing the risk of environmental pollution.
The project envisages the rehabilitation of 800 mm diameter reinforced concrete pipelines that have reached the end of their service life with pipelines made of the latest corrosion-resistant materials. The total length of the collector is 784.4 metres.
81 thousand residents of the city will receive quality centralised wastewater services.
Reconstruction of a section of the main sewerage collector on Gogol Street
Improving the quality of centralised wastewater services and reducing the risk of environmental pollution
The project envisages the rehabilitation of 800 mm diameter reinforced concrete pipelines that have reached the end of their service life with pipelines made of the latest corrosion-resistant materials. The total length of the collector is 1108.7 metres.
189 thousand residents of the city will receive high-quality centralised sewerage services.
New water intake for the city of Mykolaiv. Mykolaivvodokanal
An alternative source of raw water. Security of the city's water supply system.
This project will not only improve the reliability of water supply but also strengthen the security of water resources, ensuring their resilience to possible environmental challenges. Thanks to the new water intake, the residents of Mykolaiv will be able to receive high-quality water without interruptions, which is critical for their health and quality of life.
The social significance of this project goes beyond just providing water. It is an investment in the future of the city, which will be able to develop without worrying about water resources. It will create new jobs, boost the local economy, and help improve the environmental situation in the region.
Restoration of the Zhovtnevyi reservoir. Mykolaivvodokanal
The Zhovtnevske water reservoir, restored and modernised by Mykolaivvodokanal, will not only store but also manage water resources efficiently.
Thanks to the additional treatment of raw water, the city's residents will have access to a higher quality resource, which will have a positive impact on the health of the community.
This project will also help create new jobs, which is of great social importance in the current economic situation. It unites the community around a common goal of improving the environment and quality of life in Mykolaiv.
New water treatment plant. Mykolaivvodokanal
Restoration of the drinking water supply system. Sustainable supply of drinking water. Reduction of water losses. Improving the quality of drinking water.The project of the new water treatment plant at Mykolaivvodokanal has a significant social impact on the residents of Mykolaiv. Its implementation will not only improve water quality, but also change the life of the community on many levels.
● Improved health● Economic stability● Job creation● Improved quality of life
Access to quality water will improve the overall quality of life for residents. A sense of security and reliability in the water supply will create favourable conditions for business development, particularly in the food and trade sectors, where clean water is critical.
Reconstruction of a water treatment plant and reconstruction of water pumping stations
Comprehensive reconstruction of the water treatment plant and reconstruction of water pumping stations in Vinnytsia, which will involve the use of modern drinking water treatment technologies and alternative energy sources.
There are two sets of treatment facilities on the territory of the Pyatnychany water supply station. The complex of facilities at station No. 2, with a capacity of 100 thousand m3/day, was put into operation in 1969 and 1979. Plant No. 3, with a capacity of 107,000 m3/day, was commissioned in 1990. The total design capacity of the water supply system treatment facilities is 207 thousand m3/day.
The buildings are worn out, and the equipment has exceeded its useful life.
Social significance of the project:
● 400,000 residents of the Vinnytsia City Territorial Community will be provided with quality drinking water that meets modern requirements
● 3.7 million m3/year - reduction of pollution of the Pivdennyi Buh river
Reconstruction of a sewage pumping station
Comprehensive reconstruction of the sewage pumping station on Knyaziv Koriatovychiv Street in Vinnytsia, which will include the modernisation of mechanical wastewater treatment, installation of energy-efficient equipment and introduction of alternative energy sources.
The corresponding SPS pumps wastewater from the entire central part of the city to the WTP. Currently, the equipment, valves and pipelines are physically worn out. The SPS needs a complete reconstruction with an increase in capacity.
Social significance:
● 30 thousand residents - living in residential buildings, working at enterprises, visiting social facilities in the central part of Vinnytsia - are covered by centralised sewerage services
● 15 thousand m3/day - uninterrupted and trouble-free pumping of wastewater by the sewage plant to the sewage treatment plant
● Improving the reliability of energy supply through the use of renewable energy sources, which will save money and reduce the load on the city's energy system.
Reconstruction of sewage pumping station 1A
● Objective: Comprehensive reconstruction of the sewage pumping station on Yevhen Konovaltsia Street in Vinnytsia, which will include modernisation of wastewater treatment, installation of energy efficient equipment and introduction of alternative energy sources.
The sewage pumping station1A is the hub and the busiest station. It collects half of the city's wastewater from 20 sewage pumping stations and serves 5149 houses and transports it to the sewage treatment facilities. The sewage pumping station covers 1/3 of the city. The pumping station needs a complete reconstruction with a 1.5-2-fold increase in capacity.An emergency shutdown of any unit will lead to massive pollution and untreated wastewater entering the Pivdennyi Buh river.
Social significance:● 100 thousand residents - living in residential buildings, working at enterprises, visiting social institutions in the central part of Vinnytsia● 60 thousand m3/day - uninterrupted and trouble-free wastewater pumping by the sewage plant● Increased reliability of energy supply
Increase in water supply from the Karachunivka water supply complex with parallel network laying
Ensuring uninterrupted and high-quality water supply to the residents of Kryvyi Rih and adjacent areas, which is in line with Goal 6 ‘Ensure the availability and sustainable use of water resources’, adopted by the UN General Assembly on 25.09.2015. Laying of a parallel pipeline (approximately 13.0 km) to increase water supply from the existing water supply system.
Reconstruction of the water supply and drainage system of Baryshivka village
The goal of the project: Improvement of water supply and drainage infrastructure in the village of Baryshivka by modernizing outdated systems, ensuring reliable access to high-quality drinking water and efficient drainage for all residents of the community.
Social significance: The project will contribute to raising the standard of living of the population of Baryshivka by ensuring a stable and safe water supply. This will reduce the risks of diseases associated with poor-quality water and improve sanitary and hygienic conditions in the community. Reconstruction of water drainage will also help preserve the environment by preventing soil and water pollution.
Unification of the trolleybus network in the central part of the city. Lviv
Lviv has one of the best electric transport networks in Ukraine, and about half of all movements of the city's residents are carried out by it (including trips by private cars).
The project envisages the unification of three separate city trolleybus lines (on Universitetska St., Svoboda Ave. and Ye. Petrushevicha Square) through the construction of a trolleybus network in the central part of the city of Lviv.
The project will improve the efficiency of trolleybus transport and reduce the number of buses passing through the city centre. This, in turn, will improve air quality, because electric transport will replace diesel buses. Expected savings on public transport alone – 2 million euros per year.
ESTIMATED COST: €2 MILLION
Construction of an underground parking lot in the central part of Lviv
The goal of the project is to create new parking spaces in the central part of Lviv (E. Petrushevich Square) to solve the city's extremely acute parking problem.
The project will be implemented within the city square and involves its reconstruction. The project provides for the construction of a parking lot in one underground level, with a capacity of 100 parking spaces, of which up to 20 parking spaces will be equipped with charging stations for electric vehicles. The parking lot will additionally function as an underground shelter (bomb shelter).
A public-private partnership, namely a concession (DBFOM), is proposed as the project implementation model. The investor builds and manages an underground parking lot, and returns the investment by providing parking and charging services for electric vehicles. The term of the concession is 30 years.
Project status: preparation for the concession tender.
ESTIMATED COST: €4.6 MILLION
Construction of a tram track to the Unbroken Rehabilitation Center
The project involves improving transport accessibility to the Unbroken National Rehabilitation Center through the reconstruction of the street. Mykolaychuk. The reconstruction involves the construction of a tram line, lanes for public transport and emergency services, bicycle infrastructure.
Mikolajchuk Street is one of the central thoroughfares of the northern district of Lviv, which on the one hand connects it with the city center, and on the other - is an exit to the network of external highways of state importance.
The project is a component of the rehabilitation ecosystem Unbroken, and is aimed at improving the transport connection of the ecosystem with the city center.
Estimated value: €64.1 million
Reconstruction of the trolleybus line (energy-saving measures) with the installation of a backup power source
Creating an effective public transport system focused on meeting consumer needs is one of the priority areas of work for the authorities of the city of Poltava. The aim of the project is to ensure the sustainable operation and further development of urban electric transport, specifically:
Creating appropriate conditions for providing the population with high-quality and safe trolleybus transportation services.
Ensuring the accessibility of transport services for all segments of the population.
Increasing the share of electric transport in urban passenger transportation.
Saving budget funds through the implementation of modern, energy-efficient equipment.
Meeting environmental standards for the equipment of traction substations.
Improving the technical equipment of the enterprise and the efficiency of its operations.
Estimated value: 4 310 620 €
Restoration of the architectural monument of local significance "Bridge over the Vorskla River"
Restoration of the local architectural monument "Bridge over the Vorskla River" on Myru Street in PoltavaThe bridge was built in 1957 and has significant infrastructural importance for the sustainable functioning and life of the city and the community as a whole, connecting the eastern part and outskirts of the city (Southern Railway Station, Klymivka, Dublyanshchyna, Vakulentsi, Lisok) with the center.The Southern Bridge provides public transport (trolleybus service) connections for these areas with the city, as well as engineering communications and the diversion of railway tracks.According to the expert technical conclusion (2018), the condition of the load-bearing structures is currently emergency.The bridge features a reinforced concrete solid continuous beam-consol system.The project aims to improve the operational condition of the bridge and load-bearing structures, to equip a new pedestrian section, to update the asphalt surface of the roadway, and to renovate and improve the adjacent territory.
Estimated value: 2 100 000 €
RESTORATION AND MODERNISATION OF THE TRANSPORT NETWORK
Implementation of new technologies and waste collection and processing systems in the city aimed at creating industrial complexes related to the collection, sorting, processing, and disposal of waste, in accordance with European environmental standards.
In addition to the environmental aspect, the project's implementation will diversify the city's energy supply system and contribute to the creation of new jobs, which will have a positive impact on the socio-economic development of both the Cherkasy City community and the surrounding communities.
Estimated value: 25 000 000 €
Construction of Kvitkova Street, Cherkasy
Kvitkova Street is a major street of district significance in the city of Cherkasy. The construction of this street will connect two neighborhoods: "South-Western" and "Vokzalnyi."
This will provide opportunities for the development of a new neighborhood in the city, including job creation, taxes, and more. New roads change the face of the city and serve as a powerful impetus for the economic development of Cherkasy and the Cherkasy region. The construction of the street is part of the implementation of the General Plan for the city of Cherkasy.
The street will ensure transportation connectivity between large residential areas of the city, as well as residential and industrial zones, and public centers leading to major streets.
Kvitkova Street is planned to accommodate public transport, passenger vehicles, access for service vehicles, and the passage of utility vehicles.
Estimated value: 4 000 000 €
RESTORATION AND MODERNISATION OF THE TRANSPORT NETWORK
The hostilities in the city destroyed about 5 km of the city's overhead power lines, which need to be rebuilt. A large amount of public transport was also damaged, including trolleybuses, which are the most popular in the city.
This project is expected to:
- overhaul of traction substations and buildings;
- purchase of maintenance equipment;
- replacement of worn-out trolleybus overhead line supports;
- reconstruction and arrangement of the washing and cleaning complex;
- implementation of an automatic fire extinguishing system and fire alarm systems;
- purchase of trolleybus rolling stock and emergency equipment.
ОЦІНОЧНА ВАРТІСТЬ: 10 000 000 $
Organization of road traffic for drivers, cyclists, and pedestrians
The reconstruction of the road surface complies with state building standards and accessibility requirements.
The reconstruction of this section of the road surface provides the shortest transport connection to the regional center, ensuring safe and organized movement for pedestrians and cyclists.
The convenient placement and integration of the bicycle and pedestrian path with the roadway allow for a reduction in traffic flow and create a safe environment for riding and walking.
Estimated value: 3 579 718 $
Reconstruction of the Luchka overpass in Sumy
Creation of conditions for the implementation of plans and programmes for the strategic development of the city, introduction of the latest engineering, transport and social service systems, preservation of the environment for the safety of citizens travelling through this transport facility.
Estimated value: €3,532,009
The Unbroken Rehabilitation Ecosystem
Unbroken is a unique ecosystem of humanity that unites dozens of projects implemented with the support of partners and investors, and aimed at the treatment and rehabilitation of Ukrainians affected by the consequences of the war.
The project includes treatment, prosthetics, physical and psychological rehabilitation, housing and reintegration of Ukrainians. Prostheses are manufactured and installed here.
Since February 24, 2022, Unbroken has saved more than 15,000 victims, including 2,000 children.
The center of the UNBROKEN ecosystem is the National Rehabilitation Center, where servicemen and civilians receive comprehensive medical care. The center operates on the basis of the First Medical Association of Lviv - the largest medical institution of Ukraine, which includes two adult hospitals and one children's hospital.
The mission of the project is to rescue, prosthetics and rehabilitate Ukrainians in Ukraine
ESTIMATED COST: €20 MILLION
Building a surgical facility in the Unbroken rehabilitation ecosystem
The project involves the construction of a new surgical building to meet the growing demand for emergency surgery related to war injuries.
Over 15,000 patients were rehabilitated at the Unbroken Rehab Center during the full-scale invasion. First of all, these are surgical operations associated with mine-explosive and burn injuries, as well as extremely complex organ transplant operations. The Unbroken medical ecosystem is rapidly developing and needs new medical facilities with beds. Today, more than 3,500 patients are receiving inpatient treatment, and if necessary, more than 1,000 more. The solution to this problem is the construction of a new surgical building with 230 beds and an area of more than 20,000 square meters.
ESTIMATED COST: €20 MILLION
Building a Center for Seniors in the Unbroken Rehabilitation Ecosystem
The project envisages the construction of a Center for the elderly in connection with the growing demand for such facilities, including due to the large number of IDPs in Lviv.
On the territory of Lviv, there is only one institution of this type, in which 292 people of retirement age live, 45 of them are IDPs. The queue exceeds 20 people per seat. In this regard, it was decided to build a modern Center for the elderly in the northern part of the city, applying the experience of the Cannes (France) project. 350 beds will be created in the first phase of the Center. The total area of the center will exceed 20,000 square meters.
ESTIMATED COST: €22 MILLION
Family Medical Center
The main goal of the project is to create a modern, innovative and comfortable medical facility to meet the needs of the population of the VMTGH in quality medical and rehabilitation services.
The object will serve the following categories of visitors:
• pregnant women and women with impaired functions of the reproductive system;
• children (from 0 to 18 years old);
• children with impaired vision;
• patients who need medical rehabilitation.
To realize the goal, it is necessary to achieve the following goals:
- Achievement of energy efficiency class "A" by the building;
- Bringing the building to full or partial energy autonomy, which will help to effectively use the saved funds for other needs of the institution;
- Replacement of all emergency structural elements of the building;
- Ensuring the safety of patients and staff in accordance with the requirements of current legislation, including the construction of an anti-radiation shelter with connection to the local autonomous system of centralized notification and all related conditions.
ESTIMATED VALUE: $ 7,3 million
NEW BUILDING OF THE CHILDREN'S DIAGNOSTIC CENTER WITH A BOMB STORAGE AND THE TRANSITION TO THE STATIONARY BUILDING
The construction project of a children's diagnostic center with a bomb shelter will provide comprehensive outpatient care and safe conditions for patients and staff.
Child safety: The bomb shelter ensures that children are protected during emergencies, giving parents confidence in their safety.
High-quality medical care: The center will provide access to modern technologies, which will allow timely detection and treatment of diseases.
Comprehensive approach: Will offer diagnosis, treatment and prevention, which will reduce morbidity among children.
Psychological support: Comfortable treatment conditions will reduce children's stress and anxiety.
Attracting specialists: The center will become the basis for attracting highly qualified medical professionals, increasing the level of services in the region.
ESTIMATED VALUE: € 10,4 million
NEW BUILDING OF THE TREATMENT AND DIAGNOSTIC COMPLEX (CLUSTER HOSPITAL) IN MYKOLAEV
The project envisages the creation of a powerful medical and diagnostic complex that will combine all medical services for the adult population in one place, greatly facilitating access to treatment.
Centralization of services: All medical services will be available under one roof, which will simplify treatment and save patients' time.
The latest technologies: The use of modern technologies will ensure the safety and comfort of patients, minimizing the risks of spreading infections.
Back-up capacity: Creating back-up capacity will allow the hospital to effectively respond to emergencies, ensuring uninterrupted medical care.
Improved accessibility: The new facility will make health services more accessible to all segments of the population, improving the overall health of the community.
Comprehensive medical and preventive services: The construction of the complex will allow providing preventive services, increasing the population's awareness of a healthy lifestyle.
ESTIMATED VALUE: € 128,6 million
NEW BUILDING OF THE REHABILITATION CENTER OF THE AQUATIC RECREATION COMPLEX WITH A SUMMER GROUND NEAR CITY HOSPITAL #4
IMPLEMENTATION OF COMPREHENSIVE MEDICAL AND PSYCHOLOGICAL REHABILITATION OF PATIENTS
The construction of the rehabilitation center of the water and recreation complex with a summer playground at City Hospital No. 4 in Mykolaiv is a landmark project that will have a significant social impact on the community. This initiative will not only improve the conditions for treatment and rehabilitation of patients, but will also be an important step towards ensuring comprehensive medical and psychological rehabilitation of patients.
1. Improving the quality of medical services
The main goal of the project is the implementation of modern rehabilitation methods that combine medical, psychological and social aspects. This will allow patients to receive not only physical, but also psychological support, which is critical for full recovery. The creation of such a complex will become the basis for high-quality medical care in the region.
2. Social support and integration
The rehabilitation center will create conditions for the social integration of patients. It will provide patients with the opportunity not only to resume physical activity, but also to establish social contacts. This is important for improving their psychological resilience and sense of belonging to society.
3. Access to the latest rehabilitation technologies
The water recreation complex will provide access to innovative methods of treatment and rehabilitation, which will increase the efficiency of the recovery process. This may include aquatic rehabilitation, physical therapy, and other therapeutic programs to help patients regain physical function and improve overall well-being.
4. Improvement of psycho-emotional state
The summer playground and recreational areas will contribute to the improvement of the psycho-emotional state of patients. Interaction with nature, active recreation and social activities will help reduce stress and anxiety, which are important elements in the rehabilitation process.
ESTIMATED VALUE: € 8 million
CREATION OF THE II LEVEL MEDICAL CARE PERINATAL CENTER WITH A CONCENTRATION OF OBSTETRICAL-GYNECOLOGICAL AND NEONATOLOGY CARE ON THE BASE OF MATERNITY HOME No. 3
The project envisages the opening of a II-level perinatal center on the basis of maternity hospital No. 3, which will provide comprehensive obstetric-gynecological and neonatological care.
Innovative approach: The center implements modern technologies, offering high-quality medical services.
Improving health: Ensuring a safe birth process through skilled care and resources.
Qualified specialists: Involvement of experienced obstetricians and neonatologists will increase the quality of medical services.
Social responsibility: Supporting mothers and families in a friendly environment will reduce stress during pregnancy.
Improving medical standards: The center will serve as an example for other institutions, contributing to the overall improvement of medical services in the region.
ESTIMATED VALUE: € 1,6 million
Rehabilitation and sports complex in Poltava
The project is aimed at the reconstruction of the premises of a multidisciplinary hospital, the purpose of which is to eliminate emergency and outdated sections of the infrastructure, introduce modern and inclusive standards in the medical field, ensure high-quality rehabilitation of patients after their condition is stabilized. The project also includes improving the sterilization conditions of medical devices, which is an important aspect to ensure the safety of patients and workers.
Reconstruction of the premises will allow to create proper conditions for the rehabilitation of patients and increase the overall efficiency of the medical institution.
The rehabilitation department, which is planned to be opened as part of the reconstruction, will have a significant positive impact on the population, providing a wide range of services to help people recover from various illnesses or injuries.
ESTIMATED VALUE: € 5 million
Reconstruction and modernization of medical premises for the rehabilitation of patients, which meets modern health care standards
The project is aimed at the reconstruction of the premises of a multidisciplinary hospital, the purpose of which is to eliminate emergency and outdated sections of the infrastructure, introduce modern and inclusive standards in the medical field, ensure high-quality rehabilitation of patients after their condition is stabilized. The project also includes improving the sterilization conditions of medical devices, which is an important aspect to ensure the safety of patients and workers.
Reconstruction of the premises will allow to create proper conditions for the rehabilitation of patients and increase the overall efficiency of the medical institution.
The rehabilitation department, which is planned to be opened as part of the reconstruction, will have a significant positive impact on the population, providing a wide range of services to help people recover from various illnesses or injuries.
ESTIMATED VALUE: $421,597
Emergency medical care hospital
The goal of the project is to reduce disability by increasing the quality and availability of specialized rehabilitation assistance to residents of the region. The increase in patients at the expense of internally displaced persons and veterans in need of rehabilitation care at an appropriate level has led to the need to expand the department of rehabilitation care and improve the conditions for providing medical services. The total area of the rehabilitation department after major renovation will be 1,597.9 m².
ESTIMATED VALUE: $1,500 000
First Cherkasy City Hospital
The project envisages the implementation of energy-efficient measures in the building of a communal facility with the aim of reducing the consumption of energy carriers. The saved funds are planned to be directed to the development of the Cherkasy urban territorial community, improving the provision of medical services to the population.
The project provides for major repairs: replacement of the covering and insulation of the roof, insulation of facades, replacement of windows, exterior doors, replacement of electrical networks, interior equipment.
ESTIMATED VALUE: $1 322,554
Cherkasy City Maternity Hospital "Mother and Child Center" - installation of a backup power source
The purpose of the project The main purpose and task of the Project is to ensure the implementation and implementation of measures to connect the electrical distribution equipment of the maternity hospital to independent sources of emergency power supply.
Within the framework of the State policy on the energy efficiency of buildings, with the aim of reducing the consumption of energy resources and bringing the buildings of the maternity hospital to a normal aesthetic appearance, in accordance with the proposals of infrastructure projects for the restoration, renewal and modernization of health care facilities, the necessary level of amenities/comfort is created for users and operational personnel, including requirements for the climate regime in the premises (air exchange, temperature, humidity, lighting level, etc.), as well as availability for inspections and repairs, the possibility of replacing and modernizing individual elements, etc.
ESTIMATED VALUE: $54,802
Cherkasy City Maternity Hospital "Mother and Child Center" - insulation of the facade of the gynecological building
The main goal and task of the Project is to ensure energy-saving measures, reduce costs for heating the premises of the maternity hospital, bring facades, entrance groups, porches to the requirements of current legislation on energy efficiency and accessibility for less mobile population groups. As well as the fulfillment of the requirements of the order of the Ministry of Health of Ukraine dated January 26, 2022 No. 170 "On the approval of the Unified clinical protocol of primary, secondary (specialized), tertiary (highly specialized) medical care "Physiological childbirth" and the Protocol of medical care for a healthy newborn child, approved by the order of April 4 No. 152 of 2005 (with amendments).
Within the framework of the State policy on the energy efficiency of buildings, with the aim of reducing the consumption of energy resources and bringing the buildings of the maternity hospital to an aesthetic appearance, in accordance with the proposals of infrastructure projects for the restoration, renewal and modernization of health care facilities, the necessary level of amenities/comfort for users and operating personnel is created , including requirements for the climatic regime in the premises (air exchange, temperature, humidity, lighting level, etc.).
ESTIMATED VALUE: $909,806
Cherkasy city maternity hospital "Mother and Child Center" - insulation of the facade of the obstetric building
The main goal and task of the Project is to ensure energy-saving measures, reduce costs for heating the premises of the maternity hospital, bring facades, entrance groups, porches in accordance with the requirements of current legislation on energy efficiency and accessibility of buildings for people with reduced mobility. As well as the fulfillment of the requirements of the order of the Ministry of Health of Ukraine dated January 26, 2022 No. 170 "On the approval of the Unified clinical protocol of primary, secondary (specialized), tertiary (highly specialized) medical care "Physiological childbirth" and the Protocol of medical care for a healthy newborn child, approved by the order of April 4 No. 152 of 2005 (with amendments).
Within the framework of the State policy on the energy efficiency of buildings, with the aim of reducing the consumption of energy resources and bringing the buildings of the maternity hospital to a normal aesthetic appearance, in accordance with the proposals of infrastructure projects for the restoration, renewal and modernization of health care facilities, the necessary level of amenities/comfort is created for users and operational personnel, including requirements for the climate regime in the premises (air exchange, temperature, humidity, lighting level, etc.), as well as availability for inspections and repairs, the possibility of replacing and modernizing individual elements, etc.
ESTIMATED VALUE: $1,092,603
REHABILITATION CENTER
The main areas of the projected rehabilitation centre will be physical and mental rehabilitation of both veterans of the Armed Forces of Ukraine and all citizens affected by russian aggression. The facility is planned to be built in the city in a green area, among the forest, which will facilitate faster recovery. In addition, there is a well-developed city infrastructure and a short distance to the capital, Kyiv.
ОЦІНОЧНА ВАРТІСТЬ: 450 000 $
RENOVATION OF MUNICIPAL HOSPITAL NO. 2 USING ENERGY-SAVING TECHNOLOGIES
Chernihiv City Hospital No. 2 sees an average of 500,000 patients and is the largest hospital in the city, which has been significantly affected by the hostilities. Modernisation will reduce the consumption of fuel and energy resources, ensure compliance with sanitary and hygienic conditions, minimise the anthropogenic factor and improve the thermal insulation of buildings.
RECONSTRUCTION OF THE SURGERY BUILDING OF THE “FAMILY DOCTOR” CLINIC MUNICIPAL NON-PROFIT ENTERPRISE
Improving the quality of medical services and accessibility of secondary healthcare for residents of the frontline community and evacuated internally displaced persons of the Shyrokе community by reconstructing the surgery building of the “Family Doctor” Clinic in accordance with modern European requirements for medical facilities and inclusiveness for people with limited mobility.
In particular, thanks to the implementation of this project, community residents will have access to modern medical services under NHSU packages with a focus on infrastructure accessibility. One lift for people with limited mobility will be installed, the level of thermal insulation of the building will be increased, and the road surface on the territory of the Clinic will be renovated. In general, the conditions of patients' stay in the medical facility will be brought in line with the current legislation and the number of days for postoperative recovery and rehabilitation will be reduced.
Overhaul (thermal modernisation) of the building of the municipal non-commercial enterprise Central City Clinical Hospital
Central City Clinical Hospital - Municipal non-commercial enterprise of Sumy City Council provides a wide range of medical services to the population of the Sumy City Territorial Community.
This project aims to improve the conditions for staff and patients by providing a comfortable indoor climate regardless of the season. The introduction of energy-efficient technologies will significantly reduce the hospital's operating costs, which will allow it to redirect funds to improve medical services.
Take care of the house
The project envisages the restoration of residential buildings that were damaged as a result of the massive rocket attack on the city of Lviv on September 4, 2024. As a result of this shelling, 7 people were killed, and more than 60 were injured. Also, 189 buildings were damaged, 19 of them architectural monuments. 20 buildings suffered significant damage, and unfortunately, some of them cannot be restored.
In order to restore the 20 most destroyed buildings, the Lviv City Council launched the initiative "Take a house under guardianship". As part of the initiative, benefactors can take care and restore one of the houses or partially finance one of the types of work. More than 30 Ukrainian and international companies will already participate in the initiative, however, due to significant destruction, some buildings still require significant funds for restoration.
Comprehensive reconstruction of the Petropolis Lyceum with thermal modernization and equipment of the building with alternative energy sources
The Petropolis Lyceum is the largest institution that provides educational services for the children of the community in a mixed format. The Lyceum has an equipped and safe shelter for conducting classes during power outages and missile threats. Also, the lyceum serves as a rallying point for the residents of the community and an educational center for public, youth initiatives, on the basis of the institution there are multimedia spaces in which various events take place, as well as a security class in which civil safety is taught.
The goal of the project is to improve the comfortable and high-quality educational process for children by increasing the energy efficiency of the institution. The project includes: thermal modernization of the building and installation of solar panels on the roof. Improving the conditions for obtaining education in the community will make it possible to increase the number of students and their attendance.
Overhaul of the simplest shelter of the Lukashiv Grammar School "Mriya"
This project envisages carrying out repair work of the simplest shelter for the further restoration of the educational process in another educational institution of the community.
Currently, high-quality and safe education is the No. 1 need among children and parents in the Zaporizhzhia region. The restoration of offline learning in the community requires the creation of safe conditions for children to stay in educational institutions.
Today, 2 out of 6 possible educational institutions with shelters are functioning in the community. Restoring the work of other educational institutions means improving children's access to education and leisure services in their own or the nearest settlement.
The reconstruction of this shelter includes the creation of an inclusive space for comfortable learning under threat conditions. The universal shelter is designed for 50 people and is equipped with electrical and ventilation systems.
CAPITAL REPAIR OF THE BUILDING OF THE MYKOLAIVSK SECONDARY SCHOOL #51
Overhaul of Mykolaiv Secondary School No. 51. This initiative not only restores the physical space of the educational institution, but also opens up new opportunities for future generations.
School is a place where the future is formed. Capital renovation will allow to create comfortable, modern and safe conditions for students to study. New classrooms equipped with modern technologies will help teachers to implement innovative teaching methods, and students to develop their talents and abilities.
Rebuilding a school is not only an investment in infrastructure, but also in the future of the community. In the renovated walls, not only lessons will take place, but also numerous activities that will unite children, parents and teachers.
This project is a step towards ensuring that every child feels comfortable and safe in the learning environment, so that the knowledge and skills acquired at school become a reliable foundation for their successful future. The restoration of school No. 51 is a joint victory of all those who believe in the power of education and development of our city.
New construction of a preschool educational institution on Promeneva Street in the "Northern" microdistrict of Mykolaiv
The project for the construction of a kindergarten for 270 places in the "North" neighborhood of the city of Mykolaiv is designed to create a safe and comfortable environment for preschoolers. The facility will include 14 groups, including for children with special needs, and modern educational play areas, a gym, an assembly hall, a greenhouse and a petting zoo.
The main advantages of the project:
Improving the community's quality of life: reducing queues in kindergartens and providing every child with the opportunity to receive quality education.
Social development: creation of new jobs and community formation.
Environmental responsibility: use of energy-saving solutions and a nature-friendly environment.
The project will be an important step for community cohesion and development of the city's youngest residents.
Comprehensive reconstruction of the Petropolis Lyceum with thermal modernization and equipment of the building with alternative energy sources
The Petropolis Lyceum is the largest institution that provides educational services for the children of the community in a mixed format. The Lyceum has an equipped and safe shelter for conducting classes during power outages and missile threats. Also, the lyceum serves as a rallying point for the residents of the community and an educational center for public, youth initiatives, on the basis of the institution there are multimedia spaces in which various events take place, as well as a security class in which civil safety is taught.
The goal of the project is to improve the comfortable and high-quality educational process for children by increasing the energy efficiency of the institution.
The project includes: thermal modernization of the building and installation of solar panels on the roof. Improving the conditions for obtaining education in the community will make it possible to increase the number of students and their attendance.
Restoration of a children's music school
The building is listed in the State Register of Immovable Monuments of Ukraine under the category of local significance: objects of cultural heritage in the city of Cherkasy.
As an object of cultural and architectural heritage, Cherkasy Children's Music School No. 1 named after M.V. Lysenko is an important asset, an invaluable historical source that helps the development of science, education and culture, promotes the formation of a sense of patriotism and aesthetic education.
Cherkasy Children's Music School No. 1 named after M.V. Lysenka is one of the largest art schools in Ukraine, located in the center of Cherkasy, and has a high rating among educational institutions.
Veterans Rehabilitation and Adaptation Center
A rehabilitation center has been established on the basis of the Dnipro MSK KP, where war veterans are engaged in various adaptive sports.
The repair and restoration of the pool will provide a comprehensive approach to the rehabilitation of war veterans and people with disabilities, which will improve their physical and emotional condition.
In addition, the restoration of the swimming pool is an important step for the development of children's and youth sports, as it will provide an opportunity to train Cherkasy swimmers and prepare them for championships of various levels.
In addition, residents of the city of Cherkasy will be able to continue swimming lessons to restore health.
Accommodation Center for Internally Displaced Persons (IDPs)
After the renovation is completed, a shelter will be created in the building for the temporary accommodation of internally displaced persons who, due to unemployment, disability, caring for young children, old age, are unable to rent housing on their own, as well as a center for work with internally displaced persons (evacuees). children
30 residential units will be created in the building, which include a vestibule, an entrance hall, a room, a kitchen, a combined bathroom, designed for the simultaneous stay of 145 people. In addition, for the center for work with internally displaced (evacuee) children, two educational blocks will be equipped, combined with a changing room, administration, classrooms and bathrooms.
The economic effectiveness of the project implementation is as follows: the buildings of the city communal property, which were abandoned, can be restored for the needs of the territorial community, in particular, internally displaced (evacuees).
"Reconstruction of the Central Park of Culture and Recreation"
The Lokomotiv stadium is home to the Desna specialised children's and youth football school of the Olympic reserve, which currently has 400 pupils aged 7 to 18. As a result of shelling and bombardment, Chernihiv's training facilities were damaged and rendered unusable for educational purposes.
The project envisages the construction of two gyms, a football field and a stand for 1500 spectators. The project has an important social mission, as it will enable children to play various sports, such as football, basketball, tennis, volleyball, athletics, dancing, gymnastics and many others. This will help solve the problems of adolescence and engage children in physical education and development.
REBUILDING THE DESTROYED LOKOMOTIV STADIUM
The Lokomotiv stadium is home to the Desna specialised children's and youth football school of the Olympic reserve, which currently has 400 pupils aged 7 to 18. As a result of shelling and bombardment, Chernihiv's training facilities were damaged and rendered unusable for educational purposes.
The project envisages the construction of two gyms, a football field and a stand for 1500 spectators. The project has an important social mission, as it will enable children to play various sports, such as football, basketball, tennis, volleyball, athletics, dancing, gymnastics and many others. This will help solve the problems of adolescence and engage children in physical education and development.
CONSTRUCTION OF A NEW SCHOOL FOR 1080 PUPILS
As a result of the hostilities in Chernihiv, 70% of educational institutions were damaged, including 2 schools that were completely destroyed and cannot be restored. These schools were located in the same district of the city - Podusivka. With the construction of the new school, we want to replace the two previous existing ones. This will also solve the problem for children and their parents with daily transfers to other schools in other parts of the city, as there are no other schools in the area.
ОЦІНОЧНА ВАРТІСТЬ: 5 170 000$
Overhaul of the Suchasnyk House of Culture
The project will create safe and comfortable conditions for creative growth, development of children and youth, cultural recreation of community residents, expansion of the institution’s network of sectional and club activities, promotion of healthy lifestyles and sports, preservation and enhancement of cultural heritage.
Building up barrier-free access to the facility for people with limited mobility and people with disabilities will allow them to spend their leisure time on equal terms and rights with other community members.
Reconstruction of a lyceum with a pre-school group
The project will ensure the creation of a modern, safe and comfortable learning space for all age groups of children in Kamianka village, and get appropriate conditions for their upbringing and education at school. The project also provides for measures to improve the conditions for children's active recreation and various sports on the territory of the lyceum.
After the reconstruction, energy costs will be reduced, which will further improve the material and technical support of the educational institution.
Reconstruction of the building of municipal institution of the specialised school of I-III degrees No. 17 with the implementation of comprehensive thermal modernisation measures
The project aims to significantly improve the energy efficiency of the building by implementing measures including insulation of the building envelope, replacement of old windows and doors with energy-saving ones, and modernisation of engineering systems.
This will reduce heat loss, cut energy costs and improve the overall comfort of the school premises.
These changes are expected to result in significant energy savings for the school, reducing maintenance costs and providing a healthy learning environment for students and staff. With a capacity of 1800 students and 200 staff, the secondary school is one of the largest in the community.
Reconstruction and thermal modernisation of the building of the Pishchane House of Culture
Improving the energy efficiency of the building, creating comfortable conditions for visitors and staff to stay in the premises of the institution, bringing the building to the energy efficiency standards.
The social significance of the project is to create conditions for the cultural development of community residents, provide employment and youth after school hours, develop and reveal their talents and abilities, preserve and promote national and local traditions and customs.
Overhaul of the building of Sumy sanatorium preschool educational institution
This project aims to create an energy-efficient, comfortable place for the development and upbringing of children.
Improving the energy efficiency of the facility will ensure a stable temperature regime and a comfortable indoor climate regardless of weather conditions, which is important for the health of children and staff. In addition, the thermal modernisation measures will reduce the building's energy consumption and energy costs, which is economically beneficial.
This project will improve the quality of life and well-being of the community, ensuring the long-term preservation of the building and reducing future operating costs.
Improving energy efficiency through thermal modernisation of educational buildings in Kryvyi Rih (41 facilities)
Reducing heat energy consumption - reducing CO2 emissions - creating comfortable conditions for children in educational institutions - extending the service life of buildings
Steel Dream
Bakhmut-Baryshivka
The goal is to create Ukraine's first resilient, comfortable, and innovative district for internally displaced persons (IDPs), which will become a symbol of revival and hope for the people of Bakhmut, while harmoniously fitting into the landscape of Baryshivka.
Partners: Metinvest LLC, Baryshivka Village Council
Construction of a multifunctional sports complex
The creation of a sports complex in the city of Uman is of significant social importance, as it affects various aspects of community life:
- Improving the health and physical activity of the population
- Social integration and youth involvement
- Improving the quality of life and cultural level of the community
- Economic benefits
- Integration with educational institutions and involvement of international partners
- Inclusiveness and rehabilitation
- International standards
Our goal is to make the sports complex completely energy independent.
Translated with DeepL.com (free version)
Construction of a crematorium in Lviv
The project envisages the construction of a crematorium to solve the problem of a constant shortage of free land in the city of Lviv for burials.
This will be not only the first crematorium in the city of Lviv, but also in the west of Ukraine. The nearest crematoria are in Kyiv and Odesa.
The project includes the construction of a crematorium and columbarium, arrangement of a recreation area and parking lot, engineering support of the territory.
For the implementation of the project, a land plot has been formed, design and estimate documentation has been developed, and building permit documents have been obtained.
Leisure center for residents of the village of Soniachne
The administrative building is a multifunctional space that provides for the needs of citizens. On the first floor there are premises for the development of intellectual and physical areas, on the second - an administrative part. The building will serve as a center for recreation and unification of the residents of the village and for receiving important administrative and social services, access to psychological, artistic and cultural activities.
The project envisages the construction of a new administrative building, a parking lot for visitors and a children's playground. Around the building, it is planned to build a parking lot for visitors with 66 spaces, a landscaped area with pedestrian and bicycle paths, landscaping for leisure activities for children and adults. The territory and the building provide for the arrangement of convenient conditions for visiting persons with disabilities.
New construction of a local automated system for centralised alerting and informing residents of Shyrokе community
The project envisages the implementation of an effective system of alerting and informing residents in the settlements of the Shyrokе community.
The main goal is to ensure the effective transmission of alarms and informing residents during emergencies. The creation of an information system by broadcasting voice messages or sound signals in open spaces with a loudspeaker will ensure a quick response of rescue and security services to emergencies in the community. This is especially relevant for communities located in high-risk areas, such as our community, where the population has grown significantly since the beginning of the war due to the increase in the number of internally displaced persons.
Centre for Citizen Security
A safety centre is a community infrastructure facility that houses several services that ensure the safety of the population (fire and rescue, medical care, and police units of the community).
The main purpose of establishing a safety centre is to ensure the availability of public services provided to the community, primarily to protect the population and territory from fires and emergencies, as well as to ensure public safety.
The Safety Centre is aimed at meeting the needs of the community in comprehensive security, both in the field of civil protection and public order.
Construction of a combined steam and gas plant with a capacity of 100 MW
The project envisages the installation of a combined steam-gas plant with a capacity of 100 MW at the city's thermal power plant with maximum use of waste heat, which will satisfy up to half of the current demand for electricity in the city of Lviv and receive up to 70% of heat from cogeneration.
Construction of 20 MW of solar generation within the Lviv Energy Hub
The project envisages the creation of a sustainable power and heat generation center to provide critical infrastructure for the use of renewable energy sources.
The construction of a 20 MW gas-piston cogeneration plant for the production of electricity and heat, based on four Norwegian cogeneration plants, is in progress. This technology provides for the possibility of combining cogeneration plants with solar, wind and hydropower plants.
Within the framework of this project, the implementation of the second component is envisaged: the construction of SPP capacities with an inverter and electric energy storage. The capacity of the SES installation is 20 MW.
Installation of a heat pump with a capacity of 15 MW at the discharge of sewage treatment facilities
The project envisages the installation of a heat pump with a capacity of 15 MW of heat at the discharge of sewage treatment facilities, to include the received heat in the centralized heating system.
The development of centralized heat supply is a priority of the city of Lviv. The use of heat pumps is one of the most relevant areas of development of heat generation in the context of decarbonization, electrification and the development of RES.
Sewage always has heat, which is now completely lost.
The heat pump at the sewage treatment facilities of Lviv will allow generating heat energy from the sewage to heat the homes of more than 50,000 residents of the northern part of the city. The efficiency for this type of pump reaches 3.5.
NEW BUILDING OF A 12 MW WIND POWER STATION OF OKP "MYKOLAIVOBLTEPLOENERGO"
THE MAIN GOAL OF THE PROJECT IS TO PROVIDE A STABLE AND ENVIRONMENTALLY CLEAN ELECTRICITY SUPPLY TO MYKOLAIVOBLTEPLOENERGO. THE PROJECT IS AIMED AT REDUCING DEPENDENCE ON FOSSIL ENERGY SOURCES, REDUCING GREENHOUSE GAS EMISSIONS AND PROMOTING SUSTAINABLE DEVELOPMENT OF THE REGION.
The construction of a new wind power plant with a capacity of 12 MW of OKP "Mykolaivoblteploenergo" is not only a technical project, but a significant social contribution to the future of our city and region. This initiative has a profound social impact, contributing to sustainable development and improving the quality of life of Mykolaiv residents.
Improvement of the ecological situation
The project will contribute to the reduction of greenhouse gas emissions, which, in turn, will have a positive effect on the ecology of the region. Clean air and a healthy environment are the basis of community well-being, forming a healthy lifestyle and increasing the quality of life of residents.
Energy independence and stability
Reducing dependence on fossil energy sources will ensure the energy security of Mykolaiv. This will not only strengthen economic stability, but also give communities confidence in the future, as they will be able to use affordable and reliable energy.
Creation of jobs
The project will open up new opportunities for employment, which will help reduce unemployment and improve the financial situation of families. This, in turn, will contribute to social well-being and the development of local enterprises, stimulating economic growth in the region.
NEW CONSTRUCTION OF THREE SOLAR POWER PLANTS WITH A CAPACITY OF 9.9 MW, OKP "Mykolaivoblteploenergo"
INCREASING ENERGY INDEPENDENCE AND SECURITY BY REDUCING DEPENDENCE ON FOSSIL FUELS AND REDUCING EMISSIONS OF GREENHOUSE GASES AND OTHER HARMFUL SUBSTANCES INTO THE ATMOSPHERE
The construction of three solar power plants with a capacity of 9.9 MW by OKP "Mykolaivoblteploenergo" is an important step in the direction of sustainable development of our region. This initiative has a significant social impact, because its implementation will change the lives of Mykolaiv residents, laying new foundations for energy security and environmental awareness.
Increasing energy independence
The development of solar power plants will help reduce the city's dependence on fossil fuels. This will not only ensure a stable electricity supply, but also increase the stability of the economy, protecting the community from external risks and fluctuations in the energy market.
Environmental benefits
The project is focused on reducing emissions of greenhouse gases and harmful substances into the atmosphere. The use of solar energy will help to improve the ecological situation in the region, which will positively affect the health of residents. Clean air and preserving the natural environment are important contributions for future generations.
Stimulating the economy
The construction of solar power plants will create new jobs and open opportunities for the development of local enterprises. This will contribute to the growth of the region's economy and improve the financial situation of families, giving them new prospects.
Purchase of photovoltaic generating unit of modular type for water intake "Vilshanka" KP "Cherkasyvodokanal"
The purpose of the project
provision of round-the-clock water supply and drainage for residents of the regional center,
uninterrupted supply of electrical energy to the facilities of KP "Cherkasyvodokanal", for the provision of centralized water supply services,
reducing the effects of climate change,
reduction of carbon emissions,
reducing the cost of centralized water supply services,
reduction of operating costs of centralized water supply services.
The project envisages installation and commissioning of a solar panel system with a control unit on the territory of the Vilshanka water intake with a capacity of 1 MW
Social significance
providing 269,000 residents of the city of Cherkasy with round-the-clock uninterrupted centralized water supply and drainage,
provision of 200 residents of the village. Sokirna uninterrupted supply of electrical energy.
Solar station
The goal of the project in the long term is to reduce energy intensity indicators and reduce the cost of paying for energy carriers, increase energy independence and increase the share of renewable energy sources in the municipal sector.
The implementation of the project should contribute to the formation of a special attitude and support by the authorities and the population of the city's energy strategy aimed at energy independence, low energy intensity and the implementation of green energy projects.
Construction of a wind turbine on the territory of the Dnipro water treatment plant
● providing 24-hour water supply and drainage for residents of the regional center,
● uninterrupted supply of electrical energy to the facilities of KP "Cherkasyvodokanal", for the provision of centralized water supply services,
● reducing the effects of climate change,
● a reduction in the level of carbon emissions,
● a reduction in the cost of centralized water supply services,
● reduction of operating costs of centralized water supply services.
The project envisages installation and commissioning of a wind turbine with a capacity of 1 MW
Social significance
● providing 269,000 residents of the city of Cherkasy with round-the-clock uninterrupted centralized water supply and drainage,
● provision of 200 residents of the village. Sokirna uninterrupted supply of electrical energy.
Installation of a cogeneration gas piston unit at a water treatment plant
Provision of electrical and thermal energy to the facilities of the Dnipro water treatment plant, including during blackouts and destruction of the energy supply system due to Russian aggression.
The project envisages the installation and start-up and commissioning of the installation for the generation of electrical energy and heating of the production premises of the Dnipro water treatment plant.
Social significance: 269,000 city residents will be provided with centralized water supply, including in the absence of electricity (blackouts). In addition, tariffs for centralized water supply services are being reduced in price.
Construction of a solar power plant at a pumping station
Provision of uninterrupted water supply to city residents, including during power outages (blackouts) and destruction of the power system as a result of Russian aggression.
The project envisages the installation and commissioning of a system of solar panels on the roofs of production facilities (pure water tanks), with a capacity of 300 kW.
Social significance: 269,000 residents of the city will be provided with centralized water supply, including, in the absence of electricity (blackouts), cheaper tariffs for centralized water supply services.
Construction of a solar power plant at a water treatment plant
Provision of uninterrupted water supply to city residents, including during power outages with corresponding savings in costs for the purchase of electricity.
The project envisages the purchase and commissioning of a solar panel system.
Social significance: 269,000 residents of the city will be provided with centralized water supply, including in the absence of electricity (blackouts) with the lowest costs. And as a result, a decrease in the level of tariffs.
CONSTRUCTION OF DISTRIBUTED GENERATION FACILITIES IN CHERNIHIV (AT OTKE BOILER HOUSES)
The total electricity generated by the four cogeneration units is 2,677 kW, and the total electricity consumption of the boiler houses is about 850 kW.
Thus, by installing 4 such units, the company will be able to fully meet its own electricity needs and will additionally be able to redirect about 1800 kW to the general grid.
As a result, this will allow creating alternative heat supply facilities for about 45% of consumers (about 28,000 subscribers, 12 schools, 13 kindergartens and 3 hospitals) of the total number of subscribers of OTKE JSC in Chernihiv and will significantly increase the reliability of electricity supply in case of sudden power outages of existing boiler houses from the city's power grids.
REPLACEMENT OF A STEAM TURBINE WITH A 60MW TG-1 GENERATOR AT TEPLOCOMUNENERGO MUNICIPAL ENTERPRISE
OF THE CHERNIHIV CITY COUNCIL
(CHERNIHIV THERMAL POWER PLANT)
On 24.03.2022, during the synchronisation of turbine generator No. 1 with the power grid, another massive shelling and bombardment of the adjacent territory of the plant took place, which led to damage to turbine generator No. 1.
Since the main source of electricity connected to the power grids of CHERNIHIVOBLENERGO JSC is Chernihiv CHPP, which generates 92% of the region's electricity, the restoration of the G-1 turbogenerator significantly increases the reliability, manoeuvrability, partial redundancy of not only the Chernihiv CHPP station, but also the entire Chernihiv power node with the allocated power from the United Energy System of Ukraine. In the mode of operation, the separated Chernihiv power node will have enough power to supply the main critical infrastructure of not only Chernihiv, but also Nizhyn, Pryluky and the own needs of the main substations of the Central Power System with higher voltage, which will allow synchronisation back to the United Power System of Ukraine.
RECONSTRUCTION OF THE CHEMICAL WATER TREATMENT PLANT OF THE TEPLOCOMUNENERGO MUNICIPAL ENTERPRISE OF THE CHERNIHIV CITY COUNCIL
- provide combined heat and power plant with high-quality desalinated and softened water in accordance with the rules of technical operation;
- increase the capacity of the water softening plant from 130t/h to 200t/h;
- save reagent consumption;
- automate processes at the water treatment plant.
The reconstruction of the chemical water treatment plant at Chernihivska CHPP will improve the automation of the water treatment process and allow to move away from the use of large volumes of chemically hazardous substances and reduce the cost of treated water while improving its quality.
REPLACEMENT OF THE EXCITATION SYSTEM WITH A G-2 KP OF THE MUNICIPAL ENTERPRISE
OF THE CHERNIHIV CITY COUNCIL
Chernihivska combined heat and power plant has a turbine generator station number 2 (TG-2) equipped with a semiconductor-based excitation system of the TVG-1000/460UHL4 type.
Under the operating conditions caused by the aggression of the Russian Federation, this equipment was subjected to additional loads and does not meet the standards of regulatory documents during the daytime.
Therefore, it needs to be replaced and upgraded with modern ones:
- excitation system, which is based on a microprocessor;
- relay protection and automation based on microprocessor terminals;
- magnetic field damping machine, 1BB and 2BB input machines for new high-speed automatic transfer switches;
- 10 kV G-2 oil circuit breaker for vacuum circuit breaker.
In the mode of operation, the stand-alone Chernihiv power unit will be able to supply the main critical infrastructure of not only Chernihiv, but also Nizhyn, Pryluky and the main substations of the Central Power System with higher voltage.
Construction of highly manoeuvrable generation based on a complex of gas piston generators with a total capacity of 50 MW
This complex will allow us to cover morning and evening peak loads in the power grid within its capacity at a high price position in the balancing market. The entire complex is capable of rapid load changes within 10-15 minutes.
At the same time, the waste heat boiler makes it possible to generate additional heat energy to provide our customers with hot water in summer and heat in winter.
The service area of the municipal enterprise Teplocomunenergo of the Chernihiv City Council (Chernihiv CHPP) includes 586 residential buildings, 24 pre-schools, 15 secondary schools, 11 educational institutions, 17 medical facilities and 1,184 legal entities in Chernihiv, which is more than 40% of the city's housing stock and social facilities. In other words, about 70,000 residents of Chernihiv depend on the operation of Chernihiv combined heat and power plant.
DEVELOPMENT AND IMPLEMENTATION OF THE SCADA PRODUCTION AUTOMATION SYSTEM
➢ A level of automation that meets international requirements
➢International investment attractiveness, participation in international grants and programmes,
access to the global insurance market
➢ Automated control in normal, transient and emergency modes of operation
➢ Diagnostics at all levels
➢ Reduction of the human factor
➢ Automation of repair planning
➢ Reduced start-up and downtime
➢ Convenient situation analysis and modelling
➢ Possibility of remote control
CONSTRUCTION OF A SOLAR POWER PLANT ON THE ROOFS OF BUILDINGS ON THE TERRITORY OF THE MUNICIPAL ENTERPRISE CHERNIHIVVODOKANAL
This project envisages the construction of 88.29 kW of rooftop autonomous solar power plants (SPP) using photovoltaic modules.
This SPP is designed to supply electricity for the Chernihivvodokanal's own needs to ensure uninterrupted power supply at the critical infrastructure facility during power outages.
Construction of a solar power plant in Sumy for the needs of Municipal Enterprise of the Sumy City Council Electroautotrans
This project aims to build a 6.5 MW solar power plant in Sumy to meet the needs of the Municipal enterprise Electroautotrans, which provides public transport services. This will allow the company to almost completely cover its electricity needs, saving about UAH 35 million annually and reducing greenhouse gas emissions by 97%.
The project will last for one year, with a payback period of approximately 7.67 years.
Biogas plant - an innovative alternative solution
Attracting innovative technologies for the introduction of alternative energy sources - promoting energy security and energy independence - reducing CO2 emissions into the atmosphere - efficient waste management to reduce negative environmental impact.
12MW solar power plant at the Central Aeration Station of Kryvbasvodokanal Utility Company
Increasing the sustainability of wastewater and water treatment systems with further and uninterrupted supply of drinking water to citizens and businesses in the region; improving the environment by reducing CO2 emissions.
Solar power plant of 0.8 MW at the Central Aeration Station of Kryvbasvodokanal Utility Company
Increasing the sustainability of wastewater and water treatment systems with further and uninterrupted supply of drinking water to citizens and businesses in the region; improving the environment by reducing CO2 emissions.
Kryvyi Rih Innovative Business Incubator (KRIBI)
Purpose: Implementation in the city of Kryvyi Rih of a modern innovative model of the circular economy, focused on the development of human capital and environmentally safe use of industrial waste.
The Kryvyi Rih Innovative Business Incubator (KRIBI) will become a platform for the development of innovative enterprises, research projects and training, which will contribute to the discovery of the scientific and technological potential of the region. The main idea of the project is the integration of the latest circular economy technologies, thanks to which industrial waste will be transformed into resources for new production processes, thereby reducing the environmental burden on the region and increasing the economic sustainability of the city.
SHELTER PARK
One of the projects in which we see potential in current conditions involves a concept that combines various socially significant functions and corresponding spaces in a compact and safe structure, namely:
● administrative and office premises
● education
● medical and social institutions
● retail trade and services
● production and storage
● urban infrastructure
● parking zones
● leisure and culture, etc.
These spaces are housed in a partially sunken multi-storey building under a reinforced multi-layered protective roof, which will also be an exploited green area - an extension of the public landscape park in the very center of the city.
The designed combination of a sheltered building hidden underground with a public green recreation area allowed the developed design concept to be named accordingly.
Safe access is another feature of the project — to ensure maximum safety of access to the complex, a direct underground connection with the corridors of the nearby metro station "Naukova" is planned.
Mykolaiv industrial park
The purpose of the creation of the Mykolaiv industrial park is to ensure the sustainable economic development of the Mykolaiv city community by creating favorable conditions for attracting foreign investment into the city's economy, developing the modern production and market infrastructure of post-war Mykolaiv, ensuring the "green" and "blue" transformation of the economy, and improving the investment and innovation image cities, competitiveness of the territory.
This should contribute to the creation of new jobs, ensure the employment of the able-bodied population of the city of Mykolaiv and the region, increase revenues to the city budget and the State Budget of Ukraine, which will lead to an increase in the quality of life of the population.
Industrial Park "POLTAVA"
"Industrial park "Poltava" is a modern, innovative, production and industrial complex with a developed engineering and transport infrastructure, administrative and warehouse premises on the territory of the Poltava urban territorial community.
According to the developed and approved Concept of the Industrial Park "Poltava", the purpose of the creation of the industrial park is to ensure economic development and increase the infrastructural saturation of the territory of the community, create new jobs, and manufacture competitive products on the territory of the Poltava urban territorial community.
The private enterprise will specialize in the production of technological equipment and medium mechanical engineering, the production of building materials and mixtures, the processing of minerals and the production of fertilizers, the processing of agricultural raw materials and fruit and berry products, scientific research production, logistics, etc.
About 3,000 jobs are planned to be created as part of the industrial park.
RECONSTRUCTION OF THE CENTRAL PARK OF CULTURE AND RECREATION
The Central Park of Culture and Recreation in Chernihiv is located in a green area, close to the Desna River and the stadium. The park is a favourite destination for families as it offers entertainment for all tastes. However, a lot of the equipment is outdated and needs to be updated, as it is becoming more and more dangerous to operate every year.
A city park plays an important role in the city, as it is one of the places to spend weekends and an opportunity to relax in nature. The park can provide rides for children and adults, bike paths, walking paths, zip-lines, extreme recreation and much more.
CLEANING UP THE STRYZHEN RIVER AND DEVELOPING MODERN INFRASTRUCTURE AROUND THE RIVER
The Stryzhen River is one of Chernihiv's main waterways and flows through the city. Unfortunately, today it is heavily polluted and on the verge of an environmental disaster.
The project involves saving the city's ecology and providing infrastructure for residents around the river.
Arrangement of engineering networks of the Sumy Industrial Park
‘Arrangement of engineering networks of the Sumy Industrial Park’ - creation of appropriate conditions for the participants of the industrial park to carry out economic activities, improvement of the investment attractiveness of the Sumy Industrial Park, which in turn will contribute to the economic development and competitiveness of the Sumy territorial community, intensification of investment activity and in the future will create new jobs and, accordingly, reduce unemployment, develop modern production facilities based on innovative technologies.
Kryvbas Industrial Park
The main goal of the Kryvbas Industrial Park is to form a balanced economy of the city through the introduction of effective mechanisms to meet the demand of investors (participants) for sites prepared for the placement of innovative facilities, industry, logistics and related services, ensuring economic development, import substitution and increasing the competitiveness of the territory, developing modern production and market infrastructure, small and medium-sized businesses, creating new jobs for city residents and internally displaced persons.