Illustration

CHERNIHIV CITY TERRITORIAL COMMUNITY

Code of CATUTT UA 74100390010054825

participant of the exhibition - conference REBUILD UKRAINE 2024

PROJECTS TO BE PRESENTED
AT REBUILD UKRAINE 2024

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CONSTRUCTION OF A NEW SCHOOL FOR 1080 PUPILS

As a result of the hostilities in Chernihiv, 70% of educational institutions were damaged, including 2 schools that were completely destroyed and cannot be restored. These schools were located in the same district of the city - Podusivka. With the construction of the new school, we want to replace the two previous existing ones. This will also solve the problem for children and their parents with daily transfers to other schools in other parts of the city, as there are no other schools in the area.

Оціночна вартість: 36,6 млн €

    Design and estimate documentation of the project: None
    Nature of the reconstruction: Full (rebuilding from scratch)
    Type of project ownership: Municipal
  • Educational facilities

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

RENOVATION OF MUNICIPAL HOSPITAL NO. 2 USING ENERGY-SAVING TECHNOLOGIES

Chernihiv City Hospital No. 2 sees an average of 500,000 patients and is the largest hospital in the city, which has been significantly affected by the hostilities. Modernisation will reduce the consumption of fuel and energy resources, ensure compliance with sanitary and hygienic conditions, minimise the anthropogenic factor and improve the thermal insulation of buildings.

ESTIMATED COST: 3 264 000 $

    Design and estimate documentation of the project: Already have it
    Nature of the reconstruction: Partial
    Type of project ownership: Municipal
  • Health care facilities

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

REBUILDING THE DESTROYED LOKOMOTIV STADIUM

The Lokomotiv stadium is home to the Desna specialised children's and youth football school of the Olympic reserve, which currently has 400 pupils aged 7 to 18. As a result of shelling and bombardment, Chernihiv's training facilities were damaged and rendered unusable for educational purposes.
The project envisages the construction of two gyms, a football field and a stand for 1500 spectators. The project has an important social mission, as it will enable children to play various sports, such as football, basketball, tennis, volleyball, athletics, dancing, gymnastics and many others. This will help solve the problems of adolescence and engage children in physical education and development.

ESTIMATED COST: 5 170 000 $

    Design and estimate documentation of the project: Already have it
    Nature of the reconstruction: Partial + new construction
    Type of project ownership: Municipal
  • Objects of social infrastructure: sport

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CONSTRUCTION OF DISTRIBUTED GENERATION FACILITIES IN CHERNIHIV (AT OTKE BOILER HOUSES)

The total electricity generated by the four cogeneration units is 2,677 kW, and the total electricity consumption of the boiler houses is about 850 kW.
Thus, by installing 4 such units, the company will be able to fully meet its own electricity needs and will additionally be able to redirect about 1800 kW to the general grid.
As a result, this will allow creating alternative heat supply facilities for about 45% of consumers (about 28,000 subscribers, 12 schools, 13 kindergartens and 3 hospitals) of the total number of subscribers of OTKE JSC in Chernihiv and will significantly increase the reliability of electricity supply in case of sudden power outages of existing boiler houses from the city's power grids.

ESTIMATED COST: $1.5 MILLION

    Design and estimate documentation of the project: Already have it
    Nature of the reconstruction: New construction
    ФType of project ownership: Private
  • Energy supply facilities

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

REPLACEMENT OF A STEAM TURBINE WITH A 60MW TG-1 GENERATOR AT TEPLOCOMUNENERGO MUNICIPAL ENTERPRISE
OF THE CHERNIHIV CITY COUNCIL
(CHERNIHIV THERMAL POWER PLANT)

On 24.03.2022, during the synchronisation of turbine generator No. 1 with the power grid, another massive shelling and bombardment of the adjacent territory of the plant took place, which led to damage to turbine generator No. 1.
Since the main source of electricity connected to the power grids of CHERNIHIVOBLENERGO JSC is Chernihiv CHPP, which generates 92% of the region's electricity, the restoration of the G-1 turbogenerator significantly increases the reliability, manoeuvrability, partial redundancy of not only the Chernihiv CHPP station, but also the entire Chernihiv power node with the allocated power from the United Energy System of Ukraine. In the mode of operation, the separated Chernihiv power node will have enough power to supply the main critical infrastructure of not only Chernihiv, but also Nizhyn, Pryluky and the own needs of the main substations of the Central Power System with higher voltage, which will allow synchronisation back to the United Power System of Ukraine.

ESTIMATED COST: $14 MILLION

    Design and estimate documentation of the project: None
    Nature of the reconstruction: Partial
    Type of project ownership: Municipal
  • Energy supply facilities

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

RECONSTRUCTION OF THE CHEMICAL WATER TREATMENT PLANT OF THE TEPLOCOMUNENERGO MUNICIPAL ENTERPRISE OF THE CHERNIHIV CITY COUNCIL

- provide combined heat and power plant with high-quality desalinated and softened water in accordance with the rules of technical operation;
- increase the capacity of the water softening plant from 130t/h to 200t/h;
- save reagent consumption;
- automate processes at the water treatment plant.
The reconstruction of the chemical water treatment plant at Chernihivska CHPP will improve the automation of the water treatment process and allow to move away from the use of large volumes of chemically hazardous substances and reduce the cost of treated water while improving its quality.

ESTIMATED COST: $3.5 MILLION

    Design and estimate documentation of the project: None
    Nature of the reconstruction: Partial
    Type of project ownership: Municipal
  • Energy supply facilities

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

REPLACEMENT OF THE EXCITATION SYSTEM WITH A G-2 KP OF THE MUNICIPAL ENTERPRISE
OF THE CHERNIHIV CITY COUNCIL

Chernihivska combined heat and power plant has a turbine generator station number 2 (TG-2) equipped with a semiconductor-based excitation system of the TVG-1000/460UHL4 type.
Under the operating conditions caused by the aggression of the Russian Federation, this equipment was subjected to additional loads and does not meet the standards of regulatory documents during the daytime.
Therefore, it needs to be replaced and upgraded with modern ones:
- excitation system, which is based on a microprocessor;
- relay protection and automation based on microprocessor terminals;
- magnetic field damping machine, 1BB and 2BB input machines for new high-speed automatic transfer switches;
- 10 kV G-2 oil circuit breaker for vacuum circuit breaker.
In the mode of operation, the stand-alone Chernihiv power unit will be able to supply the main critical infrastructure of not only Chernihiv, but also Nizhyn, Pryluky and the main substations of the Central Power System with higher voltage.

ESTIMATED VALUE: $782,000

    Design and estimate documentation of the project: Already have it
    Nature of the reconstruction: Modernisation of components and parts
    Type of project ownership: Municipal
  • Energy supply facilities

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

Construction of highly manoeuvrable generation based on a complex of gas piston generators with a total capacity of 50 MW

This complex will allow us to cover morning and evening peak loads in the power grid within its capacity at a high price position in the balancing market. The entire complex is capable of rapid load changes within 10-15 minutes.
At the same time, the waste heat boiler makes it possible to generate additional heat energy to provide our customers with hot water in summer and heat in winter.
The service area of the municipal enterprise Teplocomunenergo of the Chernihiv City Council (Chernihiv CHPP) includes 586 residential buildings, 24 pre-schools, 15 secondary schools, 11 educational institutions, 17 medical facilities and 1,184 legal entities in Chernihiv, which is more than 40% of the city's housing stock and social facilities. In other words, about 70,000 residents of Chernihiv depend on the operation of Chernihiv combined heat and power plant.

ESTIMATED COST: $50 MILLION

    Design and estimate documentation of the project: Already have it
    Nature of the reconstruction: New construction
    Type of project ownership: Municipal
  • Energy supply facilities

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

DEVELOPMENT AND IMPLEMENTATION OF THE SCADA PRODUCTION AUTOMATION SYSTEM

➢ A level of automation that meets international requirements
➢International investment attractiveness, participation in international grants and programmes,
access to the global insurance market
➢ Automated control in normal, transient and emergency modes of operation
➢ Diagnostics at all levels
➢ Reduction of the human factor
➢ Automation of repair planning
➢ Reduced start-up and downtime
➢ Convenient situation analysis and modelling
➢ Possibility of remote control

ESTIMATED COST: $3.6 MILLION

    Design and estimate documentation of the project: Already have it
    Nature of the reconstruction: Design from scratch
    Type of project ownership: Municipal
  • Energy supply facilities

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

RECONSTRUCTION OF THE CENTRAL PARK OF CULTURE AND RECREATION

The Central Park of Culture and Recreation in Chernihiv is located in a green area, close to the Desna River and the stadium. The park is a favourite destination for families as it offers entertainment for all tastes. However, a lot of the equipment is outdated and needs to be updated, as it is becoming more and more dangerous to operate every year.
A city park plays an important role in the city, as it is one of the places to spend weekends and an opportunity to relax in nature. The park can provide rides for children and adults, bike paths, walking paths, zip-lines, extreme recreation and much more.

ESTIMATED COST: $70 MILLION

    Design and estimate documentation of the project: None
    Nature of the reconstruction: Modernization and partial reconstruction
    Type of project ownership: Municipal
  • Artboard 30

    Objects of recreational infrastructure / city parks

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

CLEANING UP THE STRYZHEN RIVER AND DEVELOPING MODERN INFRASTRUCTURE AROUND THE RIVER

The Stryzhen River is one of Chernihiv's main waterways and flows through the city. Unfortunately, today it is heavily polluted and on the verge of an environmental disaster.
The project involves saving the city's ecology and providing infrastructure for residents around the river.

Оціночна вартість: 70 млн $

    Design and estimate documentation of the project: None
    Nature of the reconstruction: Cleaning + construction
    Type of project ownership: Municipal
  • Artboard 30

    Objects of recreational infrastructure

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CONSTRUCTION OF A SOLAR POWER PLANT ON THE ROOFS OF BUILDINGS ON THE TERRITORY OF THE MUNICIPAL ENTERPRISE CHERNIHIVVODOKANAL

This project envisages the construction of 88.29 kW of rooftop autonomous solar power plants (SPP) using photovoltaic modules.
This SPP is designed to supply electricity for the Chernihivvodokanal's own needs to ensure uninterrupted power supply at the critical infrastructure facility during power outages.

ESTIMATED VALUE: $261,000

    Design and estimate documentation of the project: None
    Nature of the reconstruction: Construction from scratch
    Type of project ownership: Municipal
  • Energy supply facilities

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

Reconstruction of the Podusivka water pumping station at Chernihivvodokanal

The water pumping station No. 2 ‘Podusivka’ was heavily damaged as a result of the Russian military actions. Prior to the full-scale invasion, WPS No. 2 supplied 34% of the total water consumption in Chernihiv, with a maximum capacity of 30,000 m3 per day.

This project involves two phases: the first will see the reconstruction of the water pumping station, and the second will see the construction of a water treatment plant. The reconstruction of WTP No. 2 will use modern energy-efficient technologies, including the construction of a solar power plant and the use of heat pumps. In addition, the use of the latest technologies and the construction of a water treatment plant will allow for the removal of excess iron and manganese.

ESTIMATED VALUE: $261,000

    Design and estimate documentation of the project: None
    Nature of the reconstruction: Construction from scratch
    Type of project ownership: Municipal
  • Energy supply facilities

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

NEW CONSTRUCTION OF A CIVIL DEFENCE SHELTER FOR A SECONDARY SCHOOL IN CHERNIHIV

Expanding the network of protective structures and bringing existing shelters up to standard to ensure the safety of students, teachers and staff.

Оціночна вартість: 261 000 $

    ПDesign and estimate documentation of the project: None
    Nature of the reconstruction: Construction from scratch
    Type of project ownership: Municipal
  • Educational facilities

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CHERNIHIV WASTEWATER TREATMENT PLANT

The wastewater treatment plant was designed and built more than 60 years ago. As a result, it uses inefficient, outdated equipment that cannot provide acceptable quality of wastewater treatment from nitrogen and phosphorus compounds, as the chemical composition of the wastewater has changed significantly since the plant was designed.

ESTIMATED COST: €35.566 MILLION

    Design and estimate documentation of the project: None
    Nature of the reconstruction: Partial
    Type of project ownership: Municipal
  • Water supply and drainage

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

REHABILITATION CENTER

The main areas of the projected rehabilitation centre will be physical and mental rehabilitation of both veterans of the Armed Forces of Ukraine and all citizens affected by russian aggression. The facility is planned to be built in the city in a green area, among the forest, which will facilitate faster recovery. In addition, there is a well-developed city infrastructure and a short distance to the capital, Kyiv.

ПКД не розроблено

    Design and estimate documentation of the project: None
    Nature of the reconstruction: Construction from scratch
    Type of project ownership: Municipal
  • Health care facilities

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

RESTORATION AND MODERNISATION OF THE TRANSPORT NETWORK

The hostilities in the city destroyed about 5 km of the city's overhead power lines, which need to be rebuilt. A large amount of public transport was also damaged, including trolleybuses, which are the most popular in the city.
This project is expected to:
- overhaul of traction substations and buildings;
- purchase of maintenance equipment;
- replacement of worn-out trolleybus overhead line supports;
- reconstruction and arrangement of the washing and cleaning complex;
- implementation of an automatic fire extinguishing system and fire alarm systems;
- purchase of trolleybus rolling stock and emergency equipment.

ПКД не розроблено

    Design and estimate documentation of the project: Already have it
    Nature of the reconstruction: Partial reconstruction + modernization
    Type of project ownership: Municipal
  • Objects of transport infrastructure

PRIORITIES OF INTERNATIONAL COOPERATION

Illustration
    Restoration of the Chernihiv community after significant destruction due to Russian armed aggression, namely the reconstruction of housing, critical and social infrastructure facilities, and the transport network
    Economic recovery of the community
    Укладення партнерських угод з іноземними муніципалітетами, пошук та розвиток бізнес-партнерств
    Attracting investments, finding partners for the implementation of joint international projects.

GEORGAPHICAL FEATURES

Illustration
  • TOTAL AREA - 7860 HA
    CHERNIHIV REGION

    Community composition: Chernihiv city

● proximity to Kyiv city and to the international airports Boryspil and Kyiv
● proximity to the international road E-95 Europe-Asia
● 2 main railway stations: Chernihiv station, Chernihiv-Pivnichny station
● Motorways of republican and regional significance: Odesa-Kyiv, Chernihiv-Novhorod Siverskyi, Chernihiv-Senkivka
● Shipping on the rivers: Novhorod-Siverskyi-Chernihiv

NATURAL RESOURCES 

The city is a compact planning structure, formed on the right bank of the Desna River.The special value of the urban environment is the presence of a significant number of historical and cultural monuments, unique architectural ensembles that are inextricably linked to the surrounding landscape, which gives the city its uniqueness and originality.

Award "Most Innovative Solutions for Companies"

Pine and oak forests, hunting and fishing grounds, bischofite, oil and gas deposits, quartz sand, gravel, clay, kaolin and peat deposits.

Award "Best Service Provider"

Around 50% of the city's territory is covered by architectural monument protection zones approved by the Chernihiv Regional Executive Committee.

Award "Comfortable and Modern Office Design"

Water resources: Desna River, Stryzhen River, Bilous River, 6 lakes, 8 ponds, groundwater, artesian deep water of high quality.

INVESTMENT ATTRACTIVENESS

The city is characterised by a high level of attractiveness for investment (according to Credit rating 2021-2022)
Chernihiv has great potential for investment in various sectors of the economy:

Among the main resources:
● Natural potential: the city is rich in forest plantations, which will facilitate the implementation of environmental projects
● industrial resource: developed light and food industries, automotive industry, wood, plastic and metal production
● historical and cultural heritage: Chernihiv is one of the oldest cities in Eastern Europe
● logistical proximity to the capital of Ukraine - Kyiv (150 km)

Components that make up a favourable investment climate:
● obtaining construction permits within 50 days
● fast land plot registration
● fast connection to water supply and sewerage networks of Chernihivvodokanal

282 747 COMMUNITY RESIDENTSAS OF 01.01.2022)

As of August 2024, 58 local programs in various fields of activity are operating in the city. Among them:

    Programme of social and economic development for 2024
    Strategy of sustainable development of Chernihiv region for the period until 2027
    The concept of the development of the city of Chernihiv "Chernihiv is a sustainable city!"
    The Plan for the Reconstruction and Development of the Chernihiv City Territorial Community is currently at the approval stage
    Project of the Plan for the Restoration and Development of the Chernihiv Urban Territorial Community

STRATEGIC GOALS OF THE COMMUNITY

  • DEVELOPMENT OF HUMAN POTENTIAL

  • COMFORTABLE AND SAFE LIVING CONDITIONS

  • INCREASING OF COMPETITIVENESS OF THE REGIONAL ECONOMICS

  • ACCELERATED INNOVATIVE DEVELOPMENT OF THE PRIORITIES SPHERES OF ECONOMIC ACTIVITY

  • EFFECTIVE MULTI-LEVEL GOVERNANCE AND MANAGEMENT OF TERRITORIAL DEVELOPMENT

NUMBER OF SOCIAL INFRASTRUCTURE FACILITIES IN THE TERRITORY OF THE COMMUNITY

Education88

Culture9

Sport9

Medicine53

Administrative buildings10

IMPLEMENTATION OF STRATEGIC PROJECTS

MODULAR TOWN FOR INTERNALLY DISPLACED PERSONS

Partners / participants / donors: Ukrainian Red Cross Society in cooperation with Chernihiv City Council.

Objective:
Provision of temporary housing for internally displaced persons.

What has been done:
Construction of a modular town, which includes 7 two-storey buildings with 112 apartments, surrounding infrastructure, transport interchange and landscaping.

RECONSTRUCTION OF THE ARTESIAN WELL OF THE PUMPING STATION

Partners / participants / donors: Save the children.

Objective:
Restoration of an artesian well destroyed by a direct hit.

What has been done:
Reconstruction of the artesian well No. 3 of the pumping station of the Yalivshchyna water supply system No. 1 with the construction of a new ground pavilion and installation of modern equipment.

RECONSTRUCTION OF A WATER SUPPLY SYSTEM DAMAGED AS A RESULT OF MILITARY OPERATIONS OF RUSSIA

Partners / participants / donors: Within the framework of the project «Support for the Rapid Economic Recovery of Ukrainian Municipalities», implemented by the United Nations Development Programme in Ukraine with the support of the international cooperation project ReACT4UA, funded by the German Government and implemented by the German federal company Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.
Objective:
Restoration of an artesian well destroyed by a direct hit.
What has been done:
Reconstruction of the artesian well No. 3 of the pumping station of the Yalivshchyna water supply system No. 1 with the construction of a new ground pavilion and installation of modern equipment.

MODULAR TOWN FOR INTERNALLY DISPLACED PERSONS

Partners / participants / donors: German Development Cooperation (GIZ).

Objective:
Construction of a modular hospital to support the existing hospital departments due to the increase in the number of patients resulting from the need to provide medical services to people wounded during the hostilities, as well as those affected by military attacks on civilian objects and due to the large number of internally displaced persons in the Chernihiv community.

What has been done:
Construction of a modular consultative and diagnostic department that can serve up to 200 patients a day. The room is fully autonomous as it has solar panels and a generator. Modern equipment for research and examination was provided

RECONSTRUCTION OF PIPELINES
TEPLOCOMUNENERGO MUNICIPAL ENTERPRISE

Partners / participants / donors: Nordic Environment Finance Cooperation (NEFCO).

Objective:
Replacement of the thermal insulation of a 6.2 km long above-ground pipeline and reconstruction of the existing heating network with an increase in diameter with a total length of 1.2 km to ensure heat supply to the residents of Chernihiv.

What has been done:
The project is at the stage of implementation, the allocation of a grant has been agreed, tender procedures are ongoing.

DEVELOPMENT OF HEAT SUPPLY SCHEME
OF THE CITY OF CHERNIHIV

Partners / participants / donors: Tetra Tech ES, Inc. Is the implementer of the Energy Security Project funded by the United States Agency for International Development (USAID).

Objective:
Improving the environmental situation by creating zones of reduced environmental impact of the district heating system, optimising the heat carrier transportation system with reference to heat generation sources.

What has been done:
The project is currently underway.

RECONSTRUCTION AND RENOVATION OF SCHOOL INFRASTRUCTURE

Partners / participants / donors: ACTED.

Objective:
Restoring access to school education by eliminating the consequences of Russian shelling, implementing measures to improve the energy efficiency of school buildings, increasing accessibility to buildings, and arranging shelters.

What has been done:
The project is under implementation. Reconstruction and renovation of school infrastructure, as well as provision of material equipment for the safe resumption of schooling in Chernihiv.

RESTORATION OF SHELTERS AND EDUCATIONAL SPACES

Partners / participants / donors: UNICEF.
Objective:
Restore access to pre-school education by renovating learning spaces such as shelters, classrooms and learning areas in kindergartens.

What has been done:
The project is currently underway.

RECONSTRUCTION OF THE DAMAGED SECONDARY SCHOOL NO. 13 IN CHERNIHIV

Partners / participants / donors: Swiss-Ukrainian project DECIDE.

Objective:
Restoring access to a school affected by Russian shelling on the territory of Ukraine through major repairs and renovation of the catering unit.

What has been done:
The project is currently underway.

RECONSTRUCTION OF A GYMNASIUM AT THE SECONDARY SCHOOL NO. 20 IN CHERNIHIV

Partners / participants / donors: SavED in cooperation with the Open Society Foundation Bratislava (Slovakia) and with financial support from Taiwan.
Objective:
Restoration of access to education, in particular to the physical development of children, through the reconstruction of the gymnasium in the secondary school No. 20, which was damaged during the russian shelling.

What has been done:
The gym was reconstructed.

INDUSTRY AND INVESTMENTS

The largest industrial output in the city is produced by the processing industry. The city has developed warehousing facilities that provide storage of products and services to the material production sectors:

Production of food products

Illustration

Abinbev Efes Ukraine, PJSC

Production of food products

Illustration

Roshen Exclusive, LLC

Production of food products

Illustration

Nasha bulochka, LLC

Production of plastic products

Illustration

PLAST BOX

Production of plastic products

Illustration

PET TECHNOLOGIES, LLC

Production of cardan shafts products

Illustration

UKRCARD, LLC

Production of motor vehicles

Illustration

Chernihiv Car Factory, LLC

Production of motor vehicles

Illustration

TAN, LLC

Production of motor vehicles

Illustration

Chernihiv Mechanical Plant, PJSC

Production of workwear

Illustration

Siverteks, LLC

Sewing factory

Illustration

Chernihiv Sewing Factory, PJSC

Sewing factory

Illustration

Tekstyl Contact, LLC

Production of food products

Illustration

Chernihiv Bread Factory No2, LLC

POWERFUL TOURISM POTENTIAL

With aim of maximum protection and popularization of cultural and architectural heritage of Chernihiv, it is necessary to have support of European Union, in particular UNESCO the World organization.
This is a certain guarantor of preservation, protection and control over the preservation of the cultural face of the city with the 1300-year history.
For today Chernihiv was presented in the preliminary list of the Worls Heritage of UNESCO.

  • 1100

    YEARS HAVE PASSED SINCE THE FIRST WRITTEN MENTION


    Over the centuries, the city was first the capital of the large Chernihiv princedom, then the centre of a voivodeship within the Polish-Lithuanian Commonwealth, a Cossack regiment of the Hetmanate, a province within the russian empire, and a regional centre since Ukraine's independence.

  • 5

    PRESERVED MONUMENTS OF THE PRE-MONGOL PERIOD


    These include the Spasskyi Cathedral, the Borys and Hlib Cathedral, the Assumption Church, the Antonii Caves, and the Black Grave. In total, the city has 23 churches, as well as a number of monuments and memorials.

THE MOST POPULAR DIRECTIONS: the territory of Dytynets, Boldyny Hills and Chernihiv's Podil, Antonii Caves, and the M. Kotsiubynskyi Literary Museum. Certified guides provide sightseeing support in the city. The cultural heritage of Chernihiv is an integral part of the world's cultural heritage.

The list of cultural heritage sites includes 445 monuments:
● archaeological monuments – 272, among them 233 are of national significance
● historical monuments – 96, among them 3 are of national significance;
● architectural monuments - 67, among them 28 are of national importance;
● landmarks of monumental art – 9;
● landmarks of park art - 1

DESTRUCTIONS

According to the conclusions of specialists of the Kyiv School of Economics, as of May 10, 2022, Chernihiv was one of the three cities after Mariupol and Kharkiv that suffered the greatest damage as a result of attacks by the Russian army. In general, in the city of Chernihiv, the estimated amount of losses due to the loss, destruction and damage of property is about 4.2 billion $

HAS BEEN DESTROYED

    2 schools, 1 vocational school
    5 healthcare facilities, children's dental clinic
    summer theatre
    2 libraries
    3 from 5 pump water supply stations
    2 sewage pumping stations
    12 buildings of workrooms and workshops of utility companies
    59 unites of specialised machinery
    55 km of trolleybus contact network

HAS BEEN DAMAGED

    875 multi-apartment residential buildings
    25 schools
    37 kindergartens
    4 vocational schools
    4 pumping stations
    municipal water supply and sewerage networks
    street lighting networks
    production and storage facilities of utility companies
    6 trolleybuses
    50% of bus stops, etc.
Illustration

CHERNIHIV CITY TERRITORIAL COMMUNITY NEEDS YOUR HELP AND SUPPORT IN RECOVERY

LOMAKO OLEKSANDR

Secretary of the Chernihiv City Council

7, Mahistratska Str., Chernihiv, 14000, Ukraine
Е-mail: au.vog.adar-viginrehc%40tevosrog; au.vog.adar-viginrehc%40retni