PROJECTS TO BE PRESENTED
AT REBUILD UKRAINE 2024

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

New water intake for the city of Mykolaiv. MKP Mykolaivvodokanal

An alternative source of raw water. Security of the city's water supply system.
This project will not only increase the reliability of water supply, but also strengthen the security of water resources, ensuring their resistance to possible environmental challenges. Thanks to the new water intake, residents of Mykolaiv will be able to receive high-quality water without interruptions, which is critically important for health and quality of life.
The social significance of this project goes beyond the simple provision of water. This is an investment in the future of the city, which will be able to develop without worrying about water resources. It will create new jobs, activate the local economy and contribute to the improvement of the environmental situation in the region.

Estimated value: $120.0 million

    Design and estimate documentation of the project: None
    Character of rebuilding: Full (rebuilding from 0)
    Form of ownership of the project: Communal
  • Water supply and drainage

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

Restoration of the October Reservoir. MKP Mykolaivvodokanal

Thanks to the additional purification of raw water, city residents will have access to a higher quality resource, which will positively affect the health of the community. The project will affect all spheres — from everyday life to the development of entrepreneurship, because water quality is critically important for many industries.
This project will also contribute to the creation of new jobs, which is of great social importance in the current economic situation.
Restoration of the October Reservoir will be an important step on the way to sustainable development, emphasizing the importance of preserving natural resources for future generations.

Estimated value: $58.4 million

    Design and estimate documentation of the project: None
    Character of rebuilding: Full (rebuilding from 0)
    Form of ownership of the project: Communal
  • Water supply and drainage

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

New water treatment station. MKP Mykolaivvodokanal

Social impact on residents of Mykolaiv:
1. Improvement of health
2. Economic stability
3. Creation of jobs
4. Improving the quality of life
Access to quality water will improve the general standard of living of residents. A sense of security and reliability in the matter of water supply will create favorable conditions for the development of entrepreneurship, in particular in the areas of food and trade, where clean water is critically important.

Estimated value: $126.0 million

    Design and estimate documentation of the project: None
    Character of rebuilding: Full (rebuilding from 0)
    Form of ownership of the project: Communal
  • Water supply and drainage

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

New construction of a preschool educational institution

The construction of a new preschool educational institution is not just an architectural initiative, but an important social event that opens new horizons for the development of our community.
Creating a comfortable space for 270 children.
This project is designed to create a safe and comfortable environment, including for children with special needs. The involvement of experienced teachers and the implementation of innovative teaching methods will contribute to the comprehensive development of children, forming their creative potential and social skills.

Estimated value: $2 million

    Design and estimate documentation of the project: None
    Type of reconstruction: Overhaul (thermal modernization)
    Form of ownership of the project: Communal
  • Objects of social infrastructure (education, culture and sports)

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CAPITAL REPAIR OF THE BUILDING OF THE MYKOLAIVSK SECONDARY SCHOOL #51

Capital renovation will allow to create comfortable, modern and safe conditions for students to study. New classrooms equipped with modern technologies will help teachers to implement innovative teaching methods, and students to develop their talents and abilities.
This project is a step towards ensuring that every child feels comfortable and safe in the learning environment, so that the knowledge and skills acquired at school become a reliable foundation for their successful future.

Оцінна вартість: 263 523 €

    Design and estimate documentation of the project: None
    Type of reconstruction: Overhaul (thermal modernization)
    Form of ownership of the project: Communal
  • Objects of social infrastructure (education, culture and sports)

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

NEW CONSTRUCTION OF THREE 9.9 MW SOLAR POWER PLANTS
OKP "Mykolaivoblteploenergo"

Increasing energy independence and security by reducing dependence on fossil fuels and reducing emissions of greenhouse gases and other harmful substances into the atmosphere.

Increasing energy independence
The development of solar power plants will help reduce the city's dependence on fossil fuels. This will not only ensure a stable electricity supply, but also increase the stability of the economy, protecting the community from external risks and fluctuations in the energy market.

Estimated value: €8.01 million

    Design and estimate documentation of the project: None
    Nature of reconstruction: New construction
    Form of ownership of the project: Communal
  • Energy supply facilities

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

NEW BUILDING OF A 12 MW WIND POWER STATION OF OKP "MYKOLAIVOBLTEPLOENERGO"

The main goal of the project is to ensure a stable and ecologically clean electricity supply of OKP "MYKOLAIVOBLTEPLOENERGO". The project is aimed at reducing dependence on fossil energy sources, reducing greenhouse gas emissions and promoting sustainable development of the region.

Estimated value: €8.01 million

    Design and estimate documentation of the project: None
    Nature of reconstruction: New construction
    Form of ownership of the project: Communal
  • Energy supply facilities

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CREATION OF THE II LEVEL MEDICAL CARE PERINATAL CENTER WITH A CONCENTRATION OF OBSTETRICAL-GYNECOLOGICAL AND NEONATOLOGY CARE ON THE BASE OF MATERNITY HOME No. 3

This initiative will be an important step in improving the health of women and newborns, forming a new standard of medical care in our city and region.
The main goal of the project is to create an innovative perinatal center that will provide a full cycle of comprehensive perinatal care. Thanks to the implementation of modern technologies and medical practices, the center will be able to effectively respond to the needs of patients, offering high-quality services in the field of obstetrics and neonatology.

Estimated value: €1.6 million

    Design and estimate documentation of the project: None
    Nature of reconstruction: New construction
    Form of ownership of the project: Communal
  • Objects of social infrastructure (health care)

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

NEW BUILDING OF THE REHABILITATION CENTER OF THE AQUATIC RECREATION COMPLEX WITH A SUMMER GROUND NEAR CITY HOSPITAL #4

This initiative will not only improve the conditions for treatment and rehabilitation of patients, but will also be an important step towards ensuring comprehensive medical and psychological rehabilitation of patients.

The main goal of the project is the implementation of modern rehabilitation methods that combine medical, psychological and social aspects. This will allow patients to receive not only physical, but also psychological support, which is critically important for full recovery. The creation of such a complex will become the basis for high-quality medical care in the region.

Estimated value: €8.0 million

    Design and estimate documentation of the project: None
    Nature of reconstruction: New construction
    Form of ownership of the project: Communal
  • Objects of social infrastructure (health care)

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

NEW BUILDING OF THE TREATMENT AND DIAGNOSTIC COMPLEX (CLUSTER HOSPITAL) IN MYKOLAiV

Construction of a new powerful medical facility that will concentrate all medical care for the adult population in one place. Implementation of the latest technologies in construction planning, establishment of patient routes to minimize the spread of infections, provision of reserve capacity in case of a large volume of applications. Further improvement of the availability of services for patients, provision of complex medical and preventive measures, rational use of medical technologies and medicines, improvement of service efficiency.

Estimated value: €84.6 million

    Design and estimate documentation of the project: None
    Nature of reconstruction: New construction
    Form of ownership of the project: Communal
  • Objects of social infrastructure (health care)

    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

NEW BUILDING OF THE CHILDREN'S DIAGNOSTIC CENTER WITH A BOMB STORAGE AND THE TRANSITION TO THE STATIONARY BUILDING

The construction of a children's diagnostic center with a bomb shelter and the transition to a stationary building in Mykolaiv is an important project that has a significant social impact on the community. This initiative responds to the medical needs of children and their families, especially in the context of modern challenges facing the country.
1. Ensuring the safety of children
2. Access to quality medical care
3. Comprehensive approach to children's health
4. Psychological support
5. Engagement of qualified specialists

Estimated value: €10.4 million

    Design and estimate documentation of the project: None
    Nature of reconstruction: New construction
    Form of ownership of the project: Communal
  • Objects of social infrastructure (health care)

    THE PROJECT HAS AN INVESTMENT ATTRACTIVENESS

Mykolaiv industrial park

The purpose of creating the Mykolaiv industrial park is to ensure the sustainable economic development of the Mykolaiv city community by creating favorable conditions for attracting foreign investments to the city's economy, developing modern industrial and market infrastructure of post-war Mykolaiv. Ensuring the "green" and "blue" transformation of the economy and improving the investment and innovative image of the city, the competitiveness of the territory.

Estimated value: €877.45 million

    Design and estimate documentation of the project: None
    Nature of reconstruction: New construction
    Form of ownership of the project: Communal
  • Industrial park

PRIORITIES of international cooperation

Mykolaiv, as a strategic hub in southern Ukraine, has strong potential for international cooperation. The key priorities include:

    revival of machinery and shipbuilding industries;
    restoration of former enterprises, modernization of existing facilities, and creation of new ones;
    modernization of housing and communal services;
    improvement of water supply and sewage systems;
    implementation of energy-saving technologies and alternative energy sources;
    adoption of innovative technologies in industrial enterprises;
    development of transport infrastructure (construction of road interchanges, bridges, street expansions);
    ecological security;
    socially significant investment projects;
    tourism development.

Geographical FeatureS

Illustration
  • Total area - 25,980 ha. Mykolaiv region. 

    Community composition: Mykolaiv city.

● Distance to Kyiv - 490 km, to Odesa - 120 km ● 60 km from the Black Sea, at the confluence of the Bug estuary ● A logistics hub of southern Ukraine: the city hosts three international transport corridors, three sea ports, one river port, and several private terminals: - SE "Mykolaiv Sea Commercial Port" - SE "Specialized Sea Port Olvia" - LLC "Sea Specialized Port Nika-Tera" - "Mykolaiv River Port" ASC "Ukrrechflot"

Natural Resources 

Illustration

WATER RESOURCES, RIVERS:

The city has the longest coastline in Ukraine (137 km) along with numerous coastal areas. Major rivers: Ingul, Southern Bug, Dnipro-Bug Estuary.

Illustration

Green Areas:

Total green area - 760 ha, including 230 ha of deciduous species, with an average age of 30-35 years.

Illustration

Mineral Resources:

Building stone, granite in various colors, construction sand, cement, and clay-tile raw materials.

Investment Attractiveness

Investor Conditions:

    Tax benefits: Investors can take advantage of various tax benefits under government business support programs, which include lower rates of income tax, VAT and other taxes.
    Special economic zones: Mykolaiv offers the opportunity to invest in special economic zones, where simplified business conditions and preferential taxation apply.
    Infrastructural support: Mykolaiv offers the opportunity to invest in special economic zones with simplified business conditions and preferential taxation.
    Partnership with the state: Mykolaiv City Council is ready to support investors at all stages — from idea to project implementation, providing support in obtaining permits and licenses.
  • Logistics and transport infrastructure

    Mykolaiv is an important transport hub located at the crossroads of international corridors. The presence of sea and river ports, as well as a well-developed network of roads and railways creates convenient conditions for the transportation of goods.

  • Natural resources

    Наявність водних ресурсів та близькість до Чорного моря відкривають можливості для аквакультури та риболовлі.

  • Labor potential

    Mykolaiv has a skilled workforce, particularly in the field of shipbuilding, mechanical engineering and other industrial sectors.

  • Environmental conditions

    The city has favorable environmental conditions, which makes it attractive for enterprises working in the fields of renewable energy and environmental technologies.

469,545 residents of the community

As of February 1, 2022

community development programs

    The development strategy of Mykolaiv city territorial community for the period until 2027 and the Plan of measures for its implementation
    The program of economic and social development of the city of Mykolaiv for 2024-2026

STRATEGIC GOALS OF THE COMMUNITY:

  • A safe and sustainable community

    ● Physical security of a person
    ● Safe roads
    ● Environmental safety
    ● Information security
    ● Energy security

  • Comfortable community

    ● Quality municipal services
    ● Provision of housing
    ● Healthy living for all
    ● Cohesion and cultural development
    ● Quality education

  • Competitive community

    ● Center of innovation and new industries
    ● Center for business education
    ● Competitive business
    ● City of power
    ● Creative youth
    ● Development of the field of hospitality

  • Partnership community

    ● Open government
    ● Participation
    ● Multisectoral partnership

the number of social infrastructure facilities on the territory of the community

Education162

Culture61

Sports education682

Medicine58

Administrative buildings347

implementation of strategic projects

  • Illustration

    Denmark has become a reliable partner of Mykolaiv, which shows solidarity with Ukraine and has a special partnership with Mykolaiv through multifaceted and long-term support provided on a bilateral basis. Denmark's areas of activity include humanitarian and emergency support, financial support, accountability, reconstruction and the fight against corruption.

The city of Mykolaiv cooperates with the following organizations in the framework of providing technical assistance:

    International Committee of the Red Cross in Ukraine
    NEFCO
    IRI
    UNDP
    Swedish Non-Governmental Folke Bernadotte Academy
    Congress of local and regional authorities of the Council of Europe
    PAUSI Ukrainian-Polish Cooperation Foundation
    United Nations Children's Fund (UNICEF)
    The International Charitable Foundation "Ukrainian Public Health Foundation" with the support of the United Nations Population Fund (UNFPA) in Ukraine
    Federation of Canadian Municipalities (PROMIS)
    EU initiative M4EG
    United Nations Economic Commission for Europe
    USAID
    DRC
    UNDP
    UNOPS

Urban Infrastructure Development Project-2

Partners / participants / donors: International Bank for Reconstruction and Development, International Bank for Reconstruction and Development (IBRD)

What was done:
OKP "Mykolaivoblteploenergo":
The amount of the project is USD 2.057 million
Purchased:
- 2 pumps with frequency converters;
- 1 frequency converter;
- 4 gas boilers (3 units with a capacity of 10 mW, 1 unit with a capacity of 5 mW)
The product was received in full.

KP MMR "Mykolaivcommuntrans":
The amount of the project is USD 4.306 million.
- 20 special vehicles for waste transportation;
- 6 sweeping machines.
The product was received in full.

Project "Urban Public Transport of Ukraine"

Partners / participants / donors: European Investment Bank
The amount of the project is 4,500 million euros" Recipient - KP MMR "Mykolaivpastrans" (Credit).

Goal:
Providing the city with comfortable public transport.

What was done:
44 low-floor trolleybuses were received.

Project "DemoUkrainaDH in the city of Mykolaiv"

total investment cost - 960 thousand euros
- long-term loan - 500,000 euros
- grant - 300,000 euros
- own funds of the Mykolaiv City Council - 160,000 euros.
The recipient is the CU MMR "Energy Efficiency Center of the City of Mykolaiv".

Partners / participants / donors: NEFCO


The goal: to reduce heat consumption by almost 6,000 MWh per year and a corresponding reduction in carbon dioxide, CO2 emissions by almost 2,500 tons per year, given the reduction in gas and coal consumption, which in turn will result from the reduction expenses during the delivery of the coolant, as well as as a result of the transition to the use of biofuel instead of natural gas.

Non-revenue water: reconstruction of the water supply system

Partners / participants / donors: Northern Environmental Finance Corporation (NEFKO)
Danish Sustainable Infrastructure Financing Fund (DSIF) and the Danish Ministry of Foreign Affairs

What was done:
The project envisages the replacement of water supply networks in the Ship district of the city, the reconstruction of pumping stations, the installation of flow meters at the entrances to high-rise buildings.
A technical task is being prepared for a tender for designing and carrying out works.
More than 70,000 residents of the Ship district of the city will feel the improvement of the water supply.

Development of the water supply and drainage system

Partners / participants / donors: European Investment Bank
The amount of the project is EUR 31.08 million. Credit funds amount to EUR 15.04 million. Recipient - MCP "Mykolaivvodokanal".

What was done:
Ensuring the reconstruction of the building of the grates of sewage treatment facilities, 3 gravity sewer collectors, improving the efficiency of pumping stations of the 2nd lift, sewage treatment facilities.

RLF - Project of emergency support of water supply in the city of Mykolaiv

Partners / participants / donors: European Bank for Reconstruction and Development (hereinafter - EBRD)

The project consists of the following main components:
- reconstruction and modernization of the water supply pumping station of the 1st elevation;
- construction of a new microfiltration complex at the Dnipro-Mykolaiv water intake;
- installation of new rotating nets on NSV-0 of the Dnipro - Mykolaiv water intake;
- reconstruction of the city's water supply networks.

Total estimated estimated cost and currency of the Project: 33,000,000

industry and investment

The city's leading industries are mechanical engineering, food industry, and supply of electricity, gas, steam, and air conditioning. In 2022, the city's enterprises sold industrial products worth UAH 12.6 billion, or 17.3% of the total regional volume. The impact of negative factors on the performance of the main enterprises of the industrial complex of the city of Mykolaiv and the amount of tax revenues and fees to the community budget in 2022 and 2023 was significant. Since the beginning of the Russian military aggression, some enterprises have suspended production or have not been working at full capacity. In 2023, there was a certain adaptation of business to wartime conditions.

Gas turbine construction

Illustration

"Zorya" - "Mashproekt"

Agriculture

Illustration

JV "Nibulon" LLC

Production of textiles

Illustration

VTF "Velam" LLC

Dairying

Illustration

Lactalis-Mykolaiv PJSC

Beer production

Illustration

AB ІnBеv Efes 

Agriculture

Illustration

 BUNGE UKRAINE 

Illustration

Agro-industrial complex

Until February 24, 2022, Mykolaiv held a leading position in the export of plant products. During the full-scale invasion of the Russian Federation on the territory of Ukraine, the port infrastructure suffered significant damage. The city's ports were not included in the "grain corridor". The largest enterprises of the community:

Tourist potential

Mykolaiv has a fairly high potential in the field of tourism. There are 347 monuments of history and culture in Mykolaiv: monuments of garden and park art – 9; houses and buildings of cultural heritage - 338, theaters - 3. Popular locations and places for family and children's recreation before military operations: Pier 8, modernized Cathedral Square, parks, squares, children's town "Kazka".

  • ARCHAEOLOGICAL EXCAVATIONS "WILD GARDEN FORT"

    The ancient Cimmerian city of Troy, one of the oldest observatories in Eastern Europe, founded in 1821.

  • The oldest yacht club of Ukraine

    Founded in 1888.

  • Shukhov Tower

    The water tower, designed by engineer Volodymyr Shukhov, was installed and used in the city water supply system for the first time in the world.

  • Underground Mykolaiv

    Underground Mykolaiv has many underground passages and mines, from which the construction of the city of Mykolaiv began, unique drawbridges, etc.

  • the best zoo in Ukraine

    The collection consists of about 452 species, more than 220 of which are listed in the Red Book; 90 species among Ukrainian zoos are presented only here.

destruction

DAMAGED OBJECTS:

    Cultural institutions: 24 objects (10.9 million euros)
    Healthcare facilities: 17 facilities (222.6 million euros)
    Educational institutions: 88 facilities (45.3 million euros)
    Sports facilities: 15 facilities
    Residential sector: 2044 objects.
Illustration

THE COMMUNITY OF MYKOLAIV INVITES PARTNERSHIP IN THE RESTORATION AND DEVELOPMENT OF THE CITY

Oleksandr Fedorovych Sienkevych

Mykolayiv city mayor

St. Admiralska, 20, MykolaivE-mail: au.vog.adarkm%40lecnak, au.vog.adarkm%40oknehciluhs.t