Pokrovsk SETTLEMENT TERRITORIAL COMMUNITY

Code of Codifier of administrative-territorial units and territories of territorial communities / CATUTTC: UA12140250000015858

participant of the REBUILD UKRAINE 2023 exhibition and conference

ADDRESS OF THE HEAD OF THE COMMUNITY SPAZHEVA SVITALA TO THE PARTICIPANTS OF REBUILD UKRAINE 2023

PROJECTS WILL BE PRESENTED AT REBUILD UKRAINE 2023

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

POKROVSKY LEISURE CENTRE

Project objectives: creation of a modern cultural services centre on the basis of the Pokrovske Leisure Centre, a municipal cultural institution.
The main goal of the project - carrying out a set of works to modernise the building and the adjacent territory of the institution in accordance with the requirements of the time (energy efficiency - accessibility - safety - barrier-free).
Project invisages: construction and installation works using energy-saving technologies
• repair and re-equipment of the stage and auditorium for 630 seats;
• arrangement of the shelter;
• ensuring unimpeded access to the facility for people with disabilities;
• creation of areas for comfortable leisure activities;
• arrangement of a park area on the territory adjacent to the establishment.

ESTIMATED COST: 5 500 000 €

  • Social infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

RECONSTRUCTION OF THE WATER SUPPLY GRID

The project envisages the reconstruction of 9 km of the central water supply system in Pokrovske with the connection of subscribers to the reconstruction site and the installation of a third lift pumping station with a drinking water tank.
The project will improve the quality of centralised water supply services and provide quality drinking water to the population of Pokrovske (12,536 people, including 3,047 internally displaced persons).

ESTIMATED COST: 1 300 000 $

  • Utility infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CONSTRUCTION OF WASTEWATER TREATMENT FACILITIES

In order to improve the environmental situation in the community and introduce modern wastewater treatment technologies, this project is planned to build modern wastewater treatment facilities in Pokrovske that will meet current sanitary requirements.
The implementation of this project will provide an opportunity to improve the quality of wastewater services for almost 22,600 residents of the community, including 3,047 IDPs.

ESTIMATED COST: 1 250 000 $

  • Utility infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

PROVISION OF HOUSING FOR INTERNALLY DISPLACED PERSONS

The project aims to increase the level of housing provision for internally displaced persons in need of better living conditions by creating a fund of housing for temporary residence.
The project envisages the reconstruction of a non-residential building of a non-operational pre-school educational institution with an area of 1134 sq m. As a result of the refurbishment and re-purposing of the premises, the project envisages the construction of 14 apartments for at least 10 IDP families.

ESTIMATED COST: 900 000 $

  • Utility infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

RECONSTRUCTION AND MODERNISATION OF THE SPORTS SCHOOL BUILDING

Project invisages creation of comfortable conditions for physical education classes and go in for sports of all Pokrivska Community citizens.
May 2023 school building has been damaged due to rocket attack and was entered into the State Register of Damaged and Destroyed Property.
The project envisages:
production of design and estimate documentation
carrying out construction and installation works using energy-saving technologies;
reconstruction and re-equipment of swimming pools and showers, the first and second floor lobby, and the ventilation system;
installation of a modular boiler house;
arrangement of the shelter;
modernisation of water supply and sewage system;
modernisation of the power supply system.

ESTIMATED COST: 3 500 000 $

  • Social infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

INSTALLATION OF A ROOFTOP SOLAR POWER PLANT

Pokrovske Primary Healthcare Centre enterprise provides healthcare services to the population of three territorial communities: a settlement and two villages, and is maintained on the basis of inter-municipal cooperation.
The outpatient clinic services are used by 22,500 people, including 3,000 internally displaced persons. During the period of martial law, monthly patient care increased by 16% to an average of 4,928 people in need of medical observation and timely medical services.
Taking into account the instability of the centralised power grid and the possibility of blackouts, it is planned to install a 20 kW rooftop solar network solar station on an area of 400 sq m to ensure the uninterrupted operation of the Pokrovska outpatient clinic's medical equipment and provide quality medical services to the population.

ESTIMATED COST: 20 000 $

  • Social infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

OVERHAUL OF THE SOCIAL SERVICE CENTRE

Project invesages creating modern, comfortable living conditions and care for the elderly in the inpatient care unit for permanent or temporary residence of the Pokrovsk Territorial Centre for Social Services (social services) and promoting the unit both in the communities of the region and beyond.
Overhaul of the roof, heating system, insulation of the building's facades with the replacement of window blocks and the ventilation system of the kitchen of the inpatient care unit for permanent or temporary residence of the Pokrovske Territorial Centre for Social Services (provision of social services).

ESTIMATED COST: 675 000 $

  • Social infrastructure facilities

PRIORITIES OF INTERNATIONAL COOPERATION

Illustration
    Creation of a competitive educational environment
    Implementation of energy efficient technologies in public utilities
    transition to new alternative energy sources
    quality water supply
    introduction of innovative technologies in the field of medicine

GEOGRAPHICAL FEATURES

Illustration
  • TOTAL AREA - 69698, 9 hectares
    DNIPROPETROVSK REGION

    Community composition: Urban-type settlement: Pokrovske
    Villages: Andriivka, Bratske, Vilne, Herasymivka, Pishchane, Nechaivka, Radisne, Ostapiuvka, Ostapivka, Khrystoforivka, Vyshneve, Verbove, Danylivka, Ehorivka, Pershotravneve, Novooleksandrivka, Kyrpychne, Pruvillia, Katerynivka, Drozdy, Zarichne, Kolomijtsi, Oleksiivka, Tykhe, Vovche, Orly, Mechetne, Kryvoboke, Kyrychkove, Dibrova, Mayak, Malynivka, Hapono-Mechetne, Solone, Oleksandrivka, Bohodarivka, Dobropasove, Pysantsi, Starokasianivske, Hai, Vidradne, Zelena Dolyna, Novoskeliuvate, Romanky, Vodiane, Skotuvate, Otrishky, Petrykiv, Levadne, Chornenkove.

● It is located at the crossroads of three regions: Dnipro, Zaporizhzhia and Donetsk● The distance to Dnipro is 127 km, Zaporizhzhia 95 km, Donetsk 136 km.● Pokrovske has a bus station and a railway station with a loading and unloading facility.

NATURAL RESOURCES AND LAND OF COMMUNITY

  • Noun_100px

    MINERAL DEPOSITS

    Granite, reserves - 1187 thousand cubic metres, Sand for silicate bricks - 1915 thousand cubic metres, Loam - 1255 thousand cubic metres

  • NATURE RESERVE FUND

    The lands of the nature reserve fund amount to 7,519.00 hectares, the lands of the forest fund - 1,022.00 hectares, forest belts and field roads - about 998.00 hectares, water fund - 205.5 hectares

OWNED LAND, hectares:

Illustration

INVSTMENT ATTRACTIVENESS

In order to attract investment in construction, land plots of 7.9619 and 2.5 hectares are envisaged for the construction of a concrete products line and an asphalt plant

    Significant human potential and skilled workforce
    Approved Development Strategy for 2017-2025
    Favourable geographical location and developed infrastructure
    Availability of free land plots and premises for investment projects
    Favourable natural and climatic conditions
    Tourism potential represented by a large number of tourist attractions and historical heritage sites
    Developed agro-industrial complex
    Significantly lower cost of renting 1 hectare of land compared to areas located near cities of regional significance
    Favourable business climate and comprehensive support from local authorities

In order to implement the rational use and protection of land, complete and objective information on the quantitative and qualitative state of land resources, a geoportal of the community has been created, which is constantly updated and supplemented.

OWNERSHIP OF COMMUNITY LAND, hectares:

Illustration

19683 COMMUNITY RESIDENTS

As of 01.01.2022The Pokrovske community is a modern steppe agropolis that creates opportunities for a comfortable and safe life for its residents through high-tech agriculture, the development of the processing industry and new technologies; a hospitable land that generously shares its wealth.

STRATEGIC OBJECTIVES OF COMMUNITY

  • An influential centre for the development of modern agricultural technologies, as well as the production of organic food and other products and services of rural origin, open to investment and international relations

  • A community with a modern, well-developed engineering infrastructure that provides residents with healthy living conditions in a healthy natural environment

  • A healthy, well-educated, cultural, spiritual, cohesive and active community feels safe and is able to influence the situation in the community

PROGRAMMES HAVE BEEN DEVELOPED AND APPROVED IN THE COMMUNITY:

    Development Strategy of the Pokrovske community for 2017-2025
    Socio-economic development programme for 2023
    Food security programme of the Pokrovske settlement territorial community for 2022-2023 with changes
    Programme of support for agricultural producers of the Pokrovske settlement council for 2023-2025
    Local economic development programme
    Investment passport of the community
    Economic profile of the community
    Order on implementation of the inter-municipal energy management system
    Sustainable Energy and Climate Action Plan
    Detailed plan of the territory

NUMBER OF SOCIAL INFRASTRUCTURE FACILITIES IN THE COMMUNITY

EDUCATION20

CULTURE31

SPORTS SCHOOL

MEDICINE2

monument1Created with Sketch.

ADMINISTRATIVE BUILDINGS7

IMPLEMENTATION OF RESTORATION PROJECTS

Illustration

IMPLEMENTATION OF ENERGY SAVING MEASURES IN TWO EDUCATIONAL INSTITUTIONS

Partners: USAID DOBRE «Decentralisation brings better results and efficiency»
Implementation of energy saving measures in educational institutions Pokrovske gymnasium №1 and Pokrovske gymnasium №2
What have been done: In July 2013, Pokrovske community received 107 metal-plastic windows and 6 doors to replace the damaged ones, installed in two educational institutions, under the USAID DOBRE Rapid Response Project.

Illustration

PROSTIRDIY

Partners: Evropa of Hoys programme country Germany
Goal: restoring the communication environment for internally displaced people, people with disabilities and families in difficult life circumstances.
What have been done: the window and door units of the Pokrovske Leisure Centre, a municipal cultural institution, damaged by a blast wave in March 2012, were replaced.

Illustration

CREATION OF A LOGISTICS CENTRE

Partners: U-lead with EuropeGoal: ensuring food security in the community, supporting small and medium-sized businesses.
What have been done: the premises with an area of 306 sq m were renovated and communications and infrastructure were prepared. Equipment for the logistics centre was purchased (refrigeration equipment, equipment for unloading products, materials for packaging).Since August 2023, the logistics centre has been operating as a centre for unloading and distributing humanitarian aid to IDPs and socially vulnerable groups.

DIRECTIONS FOR THE DEVELOPMENT OF THE LOCAL ECONOMY

Illustration
  • AGRICULTURE

    52 agricultural formations and about 540 land users.
    There are three agricultural cooperatives in the community:
    ● honey
    ● milk● vegetable Molocharske is the only demonstration farm in Ukraine.

DESTRUCTIONS

    Fichier 1false
    109 housing building
    Fichier 1false
    Education and sport: 1 secondary education institution
    1 preschool education institution
    1 out-of-school education institution (sports)
    Fichier 1false
    3 cultural institutions
    Fichier 1false
    1 administrative building of the settlements council
    Fichier 1false
    1 utility company
Illustration

POKROVSKE SETTLEMENT TERRITORIAL COMMUNITY NEEDS YOUR HELP AND SUPPORT IN RECOVERY