Reconstruction of Wastewater Treatment Facilities of Fastivvodokanal Municipal Utility Enterprise of Fastiv City Council

Reconstruction and technological upgrading of wastewater treatment facilities, including modernization of mechanical and biological treatment, aeration, sedimentation, and disinfection processes to ensure compliance with Ukrainian legislation and EU directives. Safe handling, treatment, and recycling of sewage sludge.

Estimated Budget: €15,833,420

    Project Initiator: Executive Committee of Fastiv City Council.

    Project Implementer: To be determined following the tender procurement process.

    Asset Holder: Municipal Enterprise of Fastiv City Council “Fastivvodokanal”.

    Project Partners: Fastiv City Council – initiator and coordinator of project implementation. Municipal Enterprise “Fastivvodokanal” of Fastiv City Council – operating company and asset holder of the wastewater treatment facilities. Nordic Environment Finance Corporation (NEFCO) – partner during the project preparation stage. In 2019, under the NEFCO NIP programme, a working group involving NEFCO representatives and an international expert developed a project for the reconstruction of the wastewater treatment facilities. In 2025, the project was updated to reflect changes in Ukrainian construction and environmental regulations.

  • Critical ifrastructure

Construction of an Underpass Beneath the Railway Tracks

Construction of a railway underpass to replace the level crossing near Bucha railway station, ensuring safe and uninterrupted movement of vehicles and pedestrians, reducing traffic congestion, improving mobility, enhancing environmental conditions, and supporting regional economic development.

Estimated Budget: €14 212 396

    Project Initiator, Implementer, and Asset Holder: Municipal Enterprise “Dobryi Hospodar” of Bucha City Council.

    Project Partners: Bucha City Council, Municipal Enterprise “Dobryi Hospodar”, contractors, and donors

  • Critical ifrastructure

Construction of Wastewater Treatment Facilities

Construction of local biological treatment facilities for domestic wastewater in the city of Bucha and a bioenergy complex to generate heat and electricity from biogas, aiming to reduce water pollution and improve the community’s energy efficiency.

Estimated Budget: € 70 000 000

    Project Initiator, Implementer, and Asset Holder: Municipal Enterprise “Buchaservice” of Bucha City Council, contractors.

    Project Partners: Korea Environmental Industry & Technology Institute (KEITI), South Korea

  • Critical ifrastructure

Construction of Bucha Multidisciplinary Hospital

Construction of a modern multidisciplinary hospital in the city of Bucha to provide residents of the community and the Bucha Hospital Cluster with high-quality, accessible specialized, inpatient, and emergency medical care, while improving the region’s healthcare infrastructure.

Estimated Budget: € 11 470 000

    Project Initiator, Implementer, and Asset Holder: Municipal Non-Profit Enterprise “Bucha Consultative and Diagnostic Center” of Bucha City Council.

    Project Partners: Bucha City Council

  • Social infrastructure

Construction of New Modular Housing Settlements to Provide Temporary Accommodation for Internally Displaced Persons in the Bucha Territorial Community

The project involves the establishment of two modular housing settlements comprising a total of 160 residential units (80 per settlement) in the city of Bucha on Kyievo-Myrotska Street (Component 1) and in the settlement of Babyntsi on Zavodska Street (Component 2). The settlements will provide temporary accommodation for 320 internally displaced persons (IDPs) and individuals who have lost their homes due to hostilities.

Estimated Budget: €4 100 000

    Project Initiator, Implementer, and Asset Holder: Bucha City Council.

    Project Partners: BIM Berliner Immobilienmanagement GmbH; European Commission's Directorate-General for European Civil Protection and Humanitarian Aid Operations (ECHO).

  • Social infrastructure

Major Renovation of the Ground Floor of the Administrative Building to Develop the Administrative Service Center (ASC)

Major renovation of the 541.2 m² ground floor of the administrative building to enhance the Administrative Service Center (ASC). The project includes creating an open-plan space with a reception area, waiting areas, front and back offices, a children's corner, and an electronic queue management system. The range of services will be expanded from 243 to 350.

Estimated Budget: €233 013

    Project Initiator and Asset Holder: Executive Committee of Boryspil City Council.

    Project Implementer: Capital Construction Department of Boryspil City Council.

    Funding: Local budget of the Boryspil Urban Territorial Community – 30% of the total project cost.

  • Social infrastructure

Major Renovation of the Kitchen and Dining Facilities at Boryspil Lyceum “OSNOVA”

Major renovation of the 304 m² kitchen and dining facilities at OSNOVA Lyceum, including layout redesign in accordance with HACCP standards, modernization of utility systems and ventilation, and installation of energy-efficient equipment to provide meals for 947 students.

estimated Budget: € 7 404 430

    Project Initiator: Department of Education and Science of Boryspil City Council.

    Project Implementer: Capital Construction Department of Boryspil City Council.

    Asset Holder: Boryspil Lyceum “OSNOVA” of Boryspil City Council, Kyiv Region.

    Funding: Local budget of the Boryspil Urban Territorial Community – 30% of the total project cost.

  • Social infrastructure

Major Renovation of the Kitchen Facilities at Boryspil Lyceum “Perspektyva”

Major renovation of the 304 m² kitchen and food service facilities at Perspektyva Lyceum, including redesign in accordance with HACCP standards, modernization of utility networks and ventilation systems, and installation of energy-efficient equipment to provide meals for 1,813 students.

estimated Budget: €383 866

    Project Initiator: Department of Education and Science of Boryspil City Council

    Project Implementer: Capital Construction Department of Boryspil City Council

    Asset Holder: Boryspil Perspektyva Lyceum named after Volodymyr Monomakh of Boryspil City Council, Kyiv Region

    Funding: Local budget of the Boryspil Urban Territorial Community — 30% of the total project cost.

  • Social infrastructure

New Construction of a Dual-Purpose Facility with the Protective Properties of an Anti-Radiation Shelter (ARS)

Construction of an underground dual-purpose facility (ARS) with a capacity of 955 people to ensure safe and uninterrupted education, providing protection for up to 48 hours. In peacetime, the facility will serve as a space for learning, external independent evaluation (ZNO/NMT), and various events.

estimated Budget: €72 559 140

    Project Initiator: Department of Education and Science of Boryspil City Council

    Project Implementer: Capital Construction Department of Boryspil City Council

    Asset Holder: Boryspil Lyceum named after Kostiantyn Mohylko of Boryspil City Council, Kyiv Region

    Funding: Local budget of the Boryspil Urban Territorial Community — 30% of the total project cost.

  • Social infrastructure

CONSTRUCTION AND IMPROVEMENT OF CHILDREN'S PLAYGROUNDS AND SPORTS GROUNDS NEAR OLESNYTSKE LAKE

Construction of a barrier-free public space near Olesnytske Lake, featuring children's playgrounds and sports grounds for family recreation, adaptive sports, and the "Active Parks – Healthy Locations of Ukraine" initiative.

estimated Budget: €1 360 358

    Project Initiator: Department of Education and Science of Boryspil City Council

    Project Implementer: Capital Construction Department of Boryspil City Council

    Asset Holder: Department of Youth and Sports of Boryspil City Council

    Funding: Local budget of the Boryspil Urban Territorial Community — 30% of the total project cost.

  • Social infrastructure

CONSTRUCTION OF CIVIL PROTECTION FACILITIES (SHELTERS) IN EDUCATIONAL INSTITUTIONS

Major renovation and construction of a shelter at an educational institution in the Obukhiv community, including modernization of utility systems and provision of barrier-free access to ensure a safe educational environment.

estimated Budget: €377 054 530

    Project Initiator: Department of Education of the Executive Committee of Obukhiv City Council

    Project Implementer: Department of Education of the Executive Committee of Obukhiv City Council

    Asset Holder: Department of Education of the Executive Committee of Obukhiv City Council

  • Social infrastructure

ENHANCING THE ENERGY RESILIENCE OF HEAT SUPPLY FOR SOCIAL INFRASTRUCTURE

The project will ensure a stable and energy-efficient heat supply for social infrastructure facilities in the Obukhiv community, reduce the risk of disruptions, and enhance the energy resilience of these facilities.

estimated Budget: €1 769 256

    Project Initiator: Municipal Enterprise "Obukhivraiteplomerezha"

    Project Implementer: Municipal Enterprise "Obukhivraiteplomerezha"

    Asset Holder: Municipal Enterprise "Obukhivraiteplomerezha"

  • Critical infrastructure

RECONSTRUCTION OF MAIN HEATING NETWORKS

The main heating network reconstruction programme includes a comprehensive set of measures to renovate and modernize existing heating pipelines, improving their reliability, energy efficiency, and safety.

estimated Budget: €986 142

    Project Initiator: Municipal Enterprise "Obukhivteplotransbud" of Obukhiv City Council

    Project Implementer: Municipal Enterprise "Obukhivteplotransbud" of Obukhiv City Council

    Asset Holder: Municipal Enterprise "Obukhivteplotransbud" of Obukhiv City Council

  • Critical infrastructure

RECONSTRUCTION OF THE V. MELNYK OBUKHIV MUNICIPAL COMPLEX

Reconstruction of the V. Melnyk Obukhiv Municipal Complex, including renovation of educational, sports, and medical facilities, improvements in energy efficiency and accessibility, and installation of modern equipment.

estimated Budget: €893 329

    Project Initiator: Municipal Institution "Sports for All" Physical Health Centre of Obukhiv City Council

    Project Implementer: Municipal Institution "Sports for All" Physical Health Centre of Obukhiv City Council

    Asset Holder: Municipal Institution "Sports for All" Physical Health Centre of Obukhiv City Council

  • Social infrastructure

RECONSTRUCTION OF THERAPEUTIC DEPARTMENT NO. 1 OF BORYSPIL HOSPITAL

Reconstruction of the therapeutic department of Boryspil Hospital into a 40-bed rehabilitation centre with a radiation shelter for 200 people, providing rehabilitation services for military personnel, internally displaced persons (IDPs), and civilians. The project includes inclusive facilities, 36 jobs, and two new free rehabilitation programmes.

estimated Budget: €108 155 950

    Project Initiator: Executive Committee of Boryspil City Council

    Project Implementer: Capital Construction Department of Boryspil City Council

    Asset Holder: Municipal Non-Profit Enterprise "Boryspil Multidisciplinary Intensive Care Hospital"

  • Social infrastructure

NEW CONSTRUCTION OF AN INTENSIVE CARE BUILDING

Construction of a 6,473.94 m² intensive care building at Boryspil Hospital, with 120 beds, including admission and diagnostic, neurological, and therapeutic departments, a hemodialysis unit, and a laboratory.

estimated Budget: €120 042 140

    Project Initiator: Executive Committee of Boryspil City Council

    Project Implementer: Capital Construction Department of Boryspil City Council

    Asset Holder: Municipal Non-Profit Enterprise "Boryspil Multidisciplinary Intensive Care Hospital"

    Funding: Local budget of the Boryspil Urban Territorial Community — 30% of the total project cost.

  • Social infrastructure

RECONSTRUCTION OF ZABIRIA DISTRICT HOSPITAL WITH AN OUTPATIENT CLINIC AND AN EXTENSION FOR AN ADDITIONAL DEPARTMENT

The project involves the construction of an additional building housing an outpatient clinic with family doctors' offices, a dental department, and an inpatient care unit for people requiring assistance from caregivers. A dual-purpose radiation shelter is planned in the basement.

estimated Budget: €1 200 000

    Project Initiator: Boiarka City Council

    Project Implementer: Capital Construction Department of Boiarka City Council

    Asset Holder: Municipal Non-Profit Enterprise "Centre for Primary Health Care"

    Funding: To be determined in accordance with the project's financing terms

  • Social infrastructure

CONSTRUCTION OF A ROAD TUNNEL NEAR TARASIVKA RAILWAY STATION

The project involves the construction of a road tunnel beneath the railway tracks near Tarasivka Station to ensure safe and uninterrupted vehicle traffic. Its implementation will reduce traffic congestion and accidents, shorten delays, and increase the capacity of the transport network.

estimated Budget: €6 700 000

    Project Initiator: Boiarka City Council

    Project Implementer: Capital Construction Department of Boiarka City Council

    Asset Holder: Not yet determined

    Funding: To be determined in accordance with the project's financing terms

  • Critical infrastructure

CONSTRUCTION OF A ROAD FROM THE T-10-12 KYIV–BOIARKA HIGHWAY TO THE O101317 TARASIVKA–KRUHLYK–KHOTIV ROAD

The project involves the construction of a new road connecting the T-10-12 Kyiv–Boiarka highway with the O101317 Tarasivka–Kruhlyk–Khotiv road via Boiarka and Tarasivka. Its implementation will reduce traffic congestion, improve road safety and capacity, shorten travel times, and contribute to the development of the area.

estimated Budget: €13 600 000

    Project Initiator: Boiarka City Council

    Project Implementer: Capital Construction Department of Boiarka City Council

    Asset Holder: Not yet determined

    Funding: To be determined in accordance with the project's financing terms.

  • Critical infrastructure

NEW CONSTRUCTION OF A GENERAL SECONDARY EDUCATION INSTITUTION WITH A CAPACITY OF 1,200 STUDENTS (INCLUDING DESIGN WORKS)

Creating conditions to ensure access to quality general secondary education for children in the city of Irpin through the construction of a modern educational institution with a capacity of 1,200 students.

estimated Budget: €18 000 000

    Project Initiator: Executive Committee of Irpin City Council

    Project Implementer: Contracting Organizations

    Asset Holder: Executive Committee of Irpin City Council

    Funding: To be determined in accordance with the project's financing terms.

  • Social Infrastructure

NEW CONSTRUCTION OF AN ANTI-RADIATION SHELTER ON THE PREMISES OF IRPIN ACADEMIC LYCEUM "MRIYA"

Creating conditions to ensure access to quality general secondary education for children in the city of Irpin through the construction of a modern educational institution with a capacity of 1,200 students.

estimated Budget: €2 100 000

    Project Initiator: Department of Education and Science of Irpin City Council, Bucha District, Kyiv Region

    Project Implementer: Department of Education and Science of Irpin City Council, Bucha District, Kyiv Region

    Asset Holder: Department of Education and Science of Irpin City Council, Bucha District, Kyiv Region

    Funding: To be determined in accordance with the project's financing terms

  • Social Infrastructure

RECONSTRUCTION WITH EXTENSIONS TO THE EDUCATIONAL AND SPORTS BUILDINGS OF IRPIN ACADEMIC LYCEUM "MRIYA"

The project involves the reconstruction and extension of the educational and sports buildings of the lyceum, which were partially damaged as a result of hostilities in the community in February–March 2022.

estimated Budget: €11 000 000

    Project Initiator: Department of Education and Science of Irpin City Council, Bucha District, Kyiv Region

    Project Implementer: Department of Education and Science of Irpin City Council, Bucha District, Kyiv Region

    Asset Holder: Department of Education and Science of Irpin City Council, Bucha District, Kyiv RegionІ

    Funding: To be determined in accordance with the project's financing terms

  • Social Infrastructure

REFASTIV — COMPREHENSIVE PROJECT FOR THE CONSTRUCTION OF A NEW RESIDENTIAL DISTRICT IN FASTIV

ReFastiv is a comprehensive project to develop a new residential district in Fastiv, comprising 47 apartment buildings along with social, public, and investment infrastructure. The first phase involves the construction of social housing on a 1.7341-hectare site, including a shelter and essential infrastructure.

estimated Budget: €176 200 000

    Project Initiator: Executive Committee of Fastiv City Council

    Project Implementer: Executive Committee of Fastiv City Council

    Asset Holder: Executive Committee of Fastiv City Council

    Funding: No confirmed funding sources are currently available. The majority of funding is expected to be attracted from external sources, as the local budget has limited financial capacity.

  • Social Infrastructure

Construction of a Civil Protection Shelter for Fastiv Lyceum No. 1

Construction of an underground civil protection shelter with a capacity of 430 people to ensure a safe educational environment, enable full-time in-person learning, and provide a dual-purpose space for development, sports, creativity, and extracurricular education.

estimated Budget: €2 000 000

    Project Initiator: Department of Education of the Executive Committee of Fastiv City Council

    Project Implementer: Department of Education of the Executive Committee of Fastiv City Council

    Asset Holder: Department of Education of the Executive Committee of Fastiv City Council

    Funding: The project is included in the community's Unified Project Portfolio. Fastiv City Council is prepared to provide the necessary co-financing. Currently, UAH 188,150.00 has been allocated in the 2026 city budget.

  • Social Infrastructure

Restoration of the Railway Station Complex

Restoration of the Fastiv railway station complex following its destruction in a Russian attack. The project includes the construction of a new railway station, reconstruction of the underground pedestrian passage and Station Square with a bus terminal, as well as the construction of a transport tunnel.


    Project Initiator: Fastiv City Council

    Project Implementer: To be determined depending on the project component

    Asset Holder: Fastiv City Council / JSC Ukrainian Railways (Ukrzaliznytsia), depending on the project component.


  • Critical Infrastructure

Reconstruction of Fastiv Gymnasium No. 10 Buildings with the Construction of a Shelter

Comprehensive reconstruction of Fastiv Gymnasium No. 10, damaged as a result of military aggression, including modernization of educational infrastructure and construction of a dual-purpose protective shelter. The project will create a safe, barrier-free, and modern learning environment for 600 students.

Estimated Budget: €9 568 380,0

    Project Initiator: Fastiv City Council

    Project Implementer: Department of Education of the Executive Committee of Fastiv City Council

    Asset Holder: Department of Education of the Executive Committee of Fastiv City Council

    Funding: The community is currently seeking funding. NEFCO has confirmed its willingness to participate in project financing, grant administration, and implementation in accordance with its own procedures, provided that grant funding covers at least 50% of the total project cost.

  • Social Infrastructure

Detailed information about the projects of the Kyiv Agglomeration, all its member communities, and the guest communities participating in ReBuild Ukraine can be found in the COMMUNITY PROJECT CATALOGUE.

Priorities of international cooperation

Illustration

    INTERNATIONAL PARTNERSHIPS — long-term cooperation with European municipalities and regions, integration into European networks and programmes, and exchange of experience.

    RECOVERY FINANCING — attracting grant funding, technical assistance and humanitarian aid to modernise critical and municipal infrastructure, improve energy efficiency and strengthen civil protection.

    INVESTMENT AND TECHNOLOGY — attracting investment and modern solutions, and developing industrial and logistics potential.

    JOINT INTERNATIONAL PROJECTS — environment, digitalisation, education, culture, youth and veterans’ policy.

    INSTITUTIONAL AND SOCIAL DEVELOPMENT — strengthening the capacity of communities and supporting internally displaced persons (IDPs) and socially vulnerable groups.

    INTERNATIONAL PROMOTION — presenting the investment potential of the Kyiv Agglomeration at the international level.

Geographical features

THE LARGEST AGGLOMERATION IN UKRAINE: Kyiv and 18 communities of Kyiv Region, united by close economic and transport links.

Illustration

Bila TserkvaCity Council

Illustration

BoryspilCity Council

Illustration

BoiarkaCity Council

Illustration

BrovaryCity Council

Illustration

BuchaCity Council

Illustration

VasylkivCity Council

Illustration

VyshneveCity Council

Illustration

HoraVillage Council

Illustration

Hostomel Settlement Council

Illustration

ZazymiaVillage Council

Illustration

ZolochivVillage Council

Illustration

IrpinCity Council

Illustration

KyivCity Council

Illustration

Kotsiubynske Settlement Council

Illustration

Nemishaieve Settlement Council

Illustration

ObukhivCity Council

Illustration

PrystolychnaVillage Council

Illustration

FastivCity Council

Illustration
  • Total area — 4,291.05 km²Kyiv Region


● Intersection of Ukraine’s key transport corridors with access to EU countries.
● International and national highways M-01, M-03, M-05, M-06, M-07, and H-01.
● Well-developed suburban, passenger and freight transport links; Fastiv is a key railway hub.
● Boryspil International Airport — potential for the restoration of international air services.
● Strong industrial, transport and logistics potential around the capital.
● Forests, water bodies and green areas for recreation and sustainable development.

Objectives of the community’s participation in the ReBuild Ukraine project

  • INTERNATIONAL COOPERATION

    development of long-term partnerships with European municipalities and agglomerations

  • PRIORITY PROJECTS

    presentation of recovery and development projects

  • AGGLOMERATION PRESENTATION

    presentation of the communities and their economic and investment potential

  • PARTNERSHIPS AND FUNDING

    identification of partners and resources for local and intermunicipal projects

  • INVESTMENT AND TECHNOLOGY

    attraction of investment, modern solutions and expert support

Illustration

Investment Attractiveness

The Kyiv Agglomeration is Ukraine’s largest economic and consumer hub, combining the potential of the capital with that of the communities of Kyiv Region

Illustration

STRATEGIC LOCATION

Key road and rail corridors, international transport links and Boryspil International Airport

Illustration

LARGE MARKET

High concentration of population, businesses, consumers and workforce

Illustration

STRONG ECONOMY

Well-developed industry, logistics, services, innovation sector and business infrastructure

Illustration

SCALE FOR INVESTMENT

Opportunities to implement large-scale local and intermunicipal projects involving multiple communities

ADVANTAGE OF THE AGGLOMERATION APPROACH

Cooperation between communities enables the development of large-scale infrastructure, transport, energy and economic projects that extend beyond the boundaries of a single community.

  • ONE REGION

  • 18 COMMUNITIES

  • JOINT PROJECTS

  • GREATER SCALE OF INVESTMENT

PRIORITY SECTORS FOR INVESTMENT

RECOVERY AND INFRASTRUCTURE

TRANSPORT AND LOGISTICS

ENERGY AND ENERGY EFFICIENCY

INDUSTRY AND INDUSTRIAL PARKS

WASTEMANAGEMENT

HOUSING AND MUNICIPAL INFRASTRUCTURE

DIGITAL AND INNOVATIVE SOLUTIONS

3,826,518 residents of the agglomeration

according to registry data as of 1 September 2026

STRATEGIC DEVELOPMENT PRIORITIES:

    STRATEGIC PLANNING: development of the agglomeration and intermunicipal cooperation.

    TRANSPORT AND MOBILITY: sustainable public transport and transport connectivity.

    INFRASTRUCTURE AND RECOVERY: modernisation of critical and municipal infrastructure and recovery of damaged areas.

    ENERGY RESILIENCE: energy efficiency and improved reliability of energy supply.

    ENVIRONMENT AND WASTE: modern waste management, environmental safety and preservation of natural areas.

    DIGITALISATION: digital solutions and data-driven governance.

    ECONOMIC DEVELOPMENT: attracting investment and creating jobs.

    INTERNATIONAL COOPERATION: partnerships and strengthening the institutional capacity of communities.

IMPLEMENTATION OF STRATEGIC PROJECTS

Metropolitan Mobility: Developing Intermunicipal Cooperation and Data-Driven Governance in the Kyiv Agglomeration

Partners / Participants / Donors: Association of Local Self-Government Bodies “Kyiv Agglomeration”, member communities of the Agglomeration, Council of Europe Office in Ukraine.
Objective:
To create a unified system for collecting and analysing transport data across the Kyiv Agglomeration and an intelligent dashboard to support joint management decisions.
Work undertaken: A unified transport database and dashboard are being developed, along with mobility studies, a Data Governance model and an intermunicipal coordination mechanism. Training for communities on working with data and using the dashboard is also planned.

SUBURBAN RAIL EXPRESS “FASTIV – KYIV – BROVARY”

Partners / Participants / Donors: Association of Local Self-Government Bodies “Kyiv Agglomeration”, member communities, JSC “Ukrainian Railways”, Kyiv Regional Military Administration, as well as World Bank experts and transport sector specialists.
Objective: To establish a fast, regular Fastiv–Kyiv–Brovary rail service and an integrated suburban transport network to improve accessibility, reduce travel times and provide an alternative to road transport.
Work undertaken: The express route concept and preliminary calculations have been developed. The project has been discussed with communities, JSC “Ukrainian Railways”, Kyiv Regional Military Administration, Kyiv City State Administration, the World Bank and sector experts. The transport model, rolling stock modernisation, intermunicipal coordination and financing, including through Public Service Obligations (PSO), are being defined. The project is being prepared for implementation and requires partnerships and funding.

DIRECTIONS FOR THE DEVELOPMENT
OF THE LOCAL ECONOMY

    LOGISTICS AND INFRASTRUCTURE: development of transport, logistics and engineering infrastructure.

    INVESTMENT AND INDUSTRY: attracting investment and developing industrial parks and sites.

    ENTREPRENEURSHIP AND EMPLOYMENT: supporting SMEs and creating new jobs.

    GREEN ECONOMY: implementation of energy-efficient and green technologies.

    DIGITALISATION: development of the digital economy and municipal services.

    TOURISM AND RECREATION: development of tourism, cultural and recreational potential.

    INTERMUNICIPAL COOPERATION: strengthening economic ties between the communities of the agglomeration.

“KYIV AGGLOMERATION” invites international partners to cooperate in support of the development and European integration of the Kyiv Agglomeration

Address: 2 Enerhetykiv St, Bucha, Kyiv Region, Ukraine
Phone: +380 50 914 57 93
E-mail:
moc.liamg%40aicaremolgaviyk

Illustration

Vitalii Klitschko

Chairman of the Association of Local Self-Government Bodies “Kyiv Agglomeration”

Illustration

Oksana Bondarets

Executive Director of the Association of Local Self-Government Bodies “Kyiv Agglomeration”