CHERNIHIV CITY TERRITORIAL COMMUNITY

Code of Codifier of administrative-territorial units and territories of territorial communities / CATUTTC: UA74100390000073425

participant of the REBUILD UKRAINE 2023 exhibition&conference

ADDRESS OF THE ACTING MAYOR OF COMMUNITY OLEKSANDR LOMAKO TO THE PARTICIPANTS OF REBUILD UKRAINE 2023

PROJECTS WILL BE PRESENTED AT REBUILD UKRAINE 2023

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

reconstruction of the water pumping station

As a result of russian military operations, the water pumping station No. 2 Podusivka of the Chernihivvodokanal utility company, which provides 34% of the city's total water consumption and had a maximum capacity of 30,000 m3/day, was severely damaged. This project involves the reconstruction of the water pumping station and the construction of a water treatment plant using modern energy-efficient technologies, the construction of a solar power plant and the use of heat pumps. In addition, the use of the latest technologies and the construction of the water treatment plant will allow for the removal of excess iron and manganese.

ESTIMATED COST: 36 600 000 €

  • Utility infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

SEWAGE TREATMENT PLANT OF CHERNIHIV

Sewage treatment plant was designed and built more than 60 years ago. As a result, it uses inefficient, outdated equipment that cannot provide acceptable quality of wastewater treatment from nitrogen and phosphorus compounds, as the chemical composition of the wastewater has changed significantly since the plant was designed.

ESTIMATED COST: 35 566 000 €

  • Utility infrastructure facilities

Illustration
    THE PROJECT HAS INVESTMENT ATTRACTIVENESS

RECONSTRUCTION AND MODERNISATION OF THE CHERNIHIV HEAT AND POWER PLANT WITH THE CONSTRUCTION OF A WASTE PROCESSING PLANT

As a result of enemy shelling, Chernihiv CHPP suffered significant damage. To ensure heat supply in the city, it is necessary to restore and modernise the heat-generating equipment. In addition, the project envisages the construction of a waste recycling plant (approximately 100,000 tonnes of waste per year).

ESTIMATED COST: 4 213 910 €

  • Utility infrastructure facilities

Illustration
    THE PROJECT HAS INVESTMENT ATTRACTIVENESS

REHABILITATION CENTRE

Due to the hostilities that have been taking place on the territory of Ukraine since 2014, there is a great need to establish rehabilitation centres for war veterans. The main focus of the projected rehabilitation centre will be physical and mental rehabilitation of both veterans of the Armed Forces of Ukraine and all citizens affected by the hostilities.
The facility is planned to be built in a green area in the city, among the forest, which will facilitate faster recovery. In addition, the location has a well-developed infrastructure and is within easy reach of the capital city of Kyiv.

ESTIMATED COST: 58 911 974, 06 €

  • Social infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

RESTORATION AND MODERNISATION OF THE TRANSPORT NETWORK

As a result of the hostilities in the city, about 5 km of the contact network was destroyed and a large number of public transport was damaged:
- overhaul of traction substations;
- purchase of equipment for the maintenance of trolleybuses and buses;
- replacement of worn-out trolleybus overhead line supports;
- overhaul of the building;
- reconstruction and arrangement of the washing and cleaning complex;
- implementation of an automatic fire extinguishing system and fire alarm systems;
- purchase of trolleybus rolling stock;
- purchase of emergency equipment.

ESTIMATED COST: 2 236 346, 73 €

  • Transport infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

CONSTRUCTION OF A NEW SCHOOL TO REPLACE TWO DESTROYED ONES

As a result of the hostilities in Chernihiv, 70% of educational institutions were damaged, including 2 schools that were completely destroyed and cannot be restored. These schools were located in the same district of the city - Podusivka. With the construction of the new school, we want to replace the two previous existing ones. This will also solve the problem for children and their parents with daily transfers to other schools in other parts of the city, as there are no other schools in the area.

Оціночна вартість: 2 525 804.87 €

  • Social infrastructure facilities

Illustration
    ПРОЄКТ МАЄ ІНВЕСТИЦІЙНУ ПРИВАБЛИВІСТЬ

RESTORATION OF THE DAMAGED CHERNIHIV CITY HOSPITAL NO. 2

Chernihiv City Hospital No. 2 sees an average of 500,000 patients and it is the largest hospital in the city, which has been significantly affected by the hostilities. As a result of the damage, a large number of works need to be carried out, which will reduce the consumption of fuel and energy resources, ensure compliance with sanitary and hygienic conditions, minimise the anthropogenic factor and improve the thermal insulation of buildings.

ESTIMATED COST: 3 264 000 $

  • Social infrastructure facilities

Illustration
    THE PROJECT HAS INVESTMENT ATTRACTIVENESS

REBUILDING THE DESTROYED LOKOMOTYV STADIUM

The Lokomotiv stadium is home to the Desna specialised children's and youth football school of the Olympic reserve, which currently has 400 pupils. As a result of the shelling, the training facility was damaged and rendered unusable. The project involves the construction of two gyms, a football pitch and a stand. The project has an important social mission: children will be able to practice various sports. This will help to solve the problems of adolescence and engage children in physical education and development.

ESTIMATED COST: 5 170 000$

  • Social infrastructure facilities

Illustration
    THE PROJECT HAS INVESTMENT ATTRACTIVENESS

RECONSTRUCTION OF THE CENTRAL PARK OF CULTURE AND RECREATION

The Central Park of Culture and Recreation in Chernihiv is located in a green area, close to the Desna River and the stadium. The park is a favourite destination for families as it offers entertainment for all tastes. However, a lot of the equipment is outdated and needs to be updated, as it is becoming more and more dangerous to operate every year. The city park plays a big role in the city, as it is one of the places to spend weekends and an opportunity to relax in nature. The park can provide rides for children and adults, bicycle paths, pedestrian paths, zip-lines, extreme recreation and much more.

ESTIMATED COST: 5 170 000$

  • Social infrastructure facilities

Illustration
    THE PROJECT HAS INVESTMENT ATTRACTIVENESS

CLEANING UP THE STRING RIVER AND DEVELOPING MODERN INFRASTRUCTURE

The Stryzhen River is one of Chernihiv's main waterways and flows through the city. Unfortunately, today it is heavily polluted and on the verge of an environmental disaster. The project aims to save the city's ecology and provide infrastructure for residents around the river.

ESTIMATED COST: 5 170 000$

  • Social infrastructure facilities

PRIORITIES OF INTERNATIONAL COOPERATION

Illustration
    Rebuilding of the community of Chernihiv city
    Establishing of partner relations with international organizations
    Conclusion of partnership agreements with European municipalities
    Attracting investment to the city

GEOGRAPHICAL FEATURES

Illustration
  • TOTAL AREA - 7860 HACHERNIHIV REGION

    Community composition: Chernihiv city

● proximity to Kyiv city and to the international airports Boryspil and Kyiv
● proximity to the international road E-95 Europe-Asia
● 2 main railway stations: Chernihiv station, Chernihiv-Pivnichny station
● Motorways of republican and regional significance: Odesa-Kyiv, Chernihiv-Novhorod Siverskyi, Chernihiv-Senkivka
● Shipping on the rivers: Novhorod-Siverskyi-Chernihiv

NATURAL RESOURCES 

The city is a compact planning structure, formed on the right bank of the Desna River.The special value of the urban environment is the presence of a significant number of historical and cultural monuments, unique architectural ensembles that are inextricably linked to the surrounding landscape, which gives the city its uniqueness and originality.

Award "Most Innovative Solutions for Companies"

Pine and oak forests, hunting and fishing grounds, bischofite, oil and gas deposits, quartz sand, gravel, clay, kaolin and peat deposits.

Award "Best Service Provider"

Around 50% of the city's territory is covered by architectural monument protection zones approved by the Chernihiv Regional Executive Committee.

Award "Comfortable and Modern Office Design"

Water resources: Desna River, Stryzhen River, Bilous River, 6 lakes, 8 ponds, groundwater, artesian deep water of high quality.

INVESTMENT ATTRACTIVENESS

The city is characterised by a high level of attractiveness for investment (according to Credit rating 2021-2022)
Chernihiv ranks 2nd in the Regional Doing Business 2020 ranking (Ghjdjlbnmcz Jascjv tatrnbdyjuj htuek.dfyyz BRDO Better Regulation Delivery Office)
Components that make up a favourable investment climate:● obtaining construction permits up to 50 days● fast registration of a land plot● fast connection to the water supply and sewerage networks of Chernihivvodokanal

275 970 COMMUNITY RESIDENTS

As of August 2023, the city has 68 local programmes in various fields of activity. Among them:

    Programme of social and economic development for 2023
    Programme of coverage of local government activities in Chernihiv for 2021-2023.
    Programme of urban development activities in Chernihiv for 2021-2023.
    Programme for the development of land relations in Chernihiv for 2021-2025.
    Programme of support for small and medium-sized enterprises in Chernihiv for 2021-2025.
    Sustainable Development Strategy of Chernihiv region for the period up to 2027
    Conception of development of Chernihiv city: «Chernihiv – is sustainable city!» in cooperation with Yakusha Studio architectural bureau. 

STRATEGIC GOALS OF THE COMMUNITY

  • DEVELOPMENT OF HUMAN POTENTIAL

  • COMFORTABLE AND SAFE LIVING CONDITIONS

  • INCREASING OF COMPETITIVENESS OF THE REGIONAL ECONOMICS

  • ACCELERATED INNOVATIVE DEVELOPMENT OF THE PRIORITIES SPHERES OF ECONOMIC ACTIVITY

  • EFFECTIVE MULTI-LEVEL GOVERNANCE AND MANAGEMENT OF TERRITORIAL DEVELOPMENT

IMPLEMENTATION OF STRATEGIC PROJECTS

Illustration

RECONSTRUCTION OF ARTESIAN BOREHOLE NO. 3 OF THE PUMPING STATION OF WATER SUPPLY SYSTEM NO. 1 YALIVSHCHYNA

One of the artesian boreholes, which was completely destroyed by a direct hit, was restored thanks to the help of the international organisation Save the Children.As a result of the reconstruction of artesian borehole No. 3 at the Yalivshchyna water supply pumping station No. 1, a new above-ground pavilion was built and modern equipment installed.

Illustration

MODULAR TOWN FOR INTERNALLY DISPLACED PERSONS

Many people have lost their homes as a result of russia's military aggression in Ukraine, so the project aimed to provide internally displaced persons with temporary housing.
The project was implemented with the participation of the Ukrainian Red Cross Society.

Illustration

ASSISTANCE IN RECOVERY OF TWO PRE-SCHOOL EDUCATION INSTITUTIONS No.4 and No.72

After a direct shell hit the building of kindergarten No. 72, a corner was destroyed and a fire broke out. At present, windows have been replaced, the roof has been restored and interior works are underway in both institutions. The amount of assistance totalled 628 000 USD.
The project is being implemented with the help of Finn Church Aid.

Illustration

REPAIRING DAMAGED WINDOWS IN TWO SCHOOLS IN CHERNIHIV, NO. 14 AND NO. 13

The total amount of assistance for these two schools was12 644 674.28 UAH. The organisation continues to provide assistance to 8 more schools (No. 6, No. 11, No. 16, No. 20, No. 24, No. 29, No. 31, No. 34) in the city – these are partial cosmetic repairs of damaged premises (gyms, corridors, classrooms, library, teacher's room). The project is being implemented with the help of Finn Church Aid.

Illustration

SUPPLY AND INSTALLATION OF A BLOCK-MODULAR BOILER COMPLEX

Partners: International Committee of the Red Cross, Foreign Investment Company Danfos LLC
Goal: to provide heat and hot water supply to 9 residential multi-storey buildings and almost five hundred subscribers (427 people).
What have been done: from May to August 2022, a block-modular boiler house with a gas metering unit, a gas reducer, and chimneys was delivered and installed.

INDUSTRY AND INVESTMENTS

The largest industrial output in the city is produced by the processing industry. The city has developed warehousing facilities that provide storage of products and services to the material production sectors:

Illustration

Abinbev Efes Ukraine, PJSC

Illustration

Roshen Exclusive, LLC

Illustration

Nasha bulochka, LLC

Illustration

PET TECHNOLOGIES, LLC

Illustration

Chernihiv Car Factory, LLC

Illustration

TAN, LLC

Illustration

Chernihiv Mechanical Plant, PJSC

Illustration

UKRCARD, LLC

Illustration

Chernihiv Sewing Factory, PJSC

Illustration

Siverteks, LLC

Illustration

Tekstyl Contact, LLC

Illustration

Chernihiv Bread Factory No2, LLC

POWERFUL TOURISM POTENTIAL

With aim of maximum protection and popularization of cultural and architectural heritage of Chernihiv, it is necessary to have support of European Union, in particular UNESCO the World organization. This is a certain guarantor of preservation, protection and control over the preservation of the cultural face of the city with the 1300-year history.For today Chernihiv was presented in the preliminary list of the Worls Heritage of UNESCO.