Illustration

Oleksandriya city territorial community

Code of CATUTTC: UA35080050010051027

participant of the exhibition - conference REBUILD UKRAINE 2025

Address of the Mayor of the Community serhii kuzmenko to the participants of REBUILD UKRAINE 2025

PROJECTS TO BE PRESENTED
AT REBUILD UKRAINE 2025

Illustration

Installation of facilities ensuring barrier-free access for persons with disabilities and other mobility-impaired groups to CNAP

The project involves the installation of a ramp to ensure free and safe access to the building for persons with disabilities and other mobility-impaired groups.

estimated budget: 145 000 €

     Project initiator, balance holder, and implementer: Oleksandriya City Council
    Financing: As needed
  • Social infrastructure

Illustration

Industrial Park “STAN-INVEST”

The Industrial Park “STAN-INVEST” was established for a period of 30 years and is included in the Register of Industrial Parks according to the Resolution of the Cabinet of Ministers of Ukraine dated August 26, 2025, No. 902-r. It is located in Oleksandriia, Kirovohrad Oblast, on a plot of 11.5903ha

estimated budget: 7 000 000 €

    Project initiator, balance holder, and implementer: Limited Liability Company “Industrial Park Stan-Invest”
    Oleksandriya City Council, LLC “Stan-Komplekt”, LLC “Vsi Inzhyniring”, JSC “Zavod Temp”
    Financing: As needed
  • Investment projects

Illustration

Major renovation of the main building of the Municipal Enterprise "Central City Hospital of Oleksandriya"

The project includes: window replacement; interior finishing; barrier-free access; replacement of internal electrical, heating, and water supply networks; installation of communication systems; arrangement of operating units for trauma and surgery departments; equipping with modern medical equipment

estimated budget: 4 200 000 €

    Project initiator: Oleksandriya City Council
    Implementer: Municipal Enterprise "Central City Hospital of Oleksandriya" or under grant conditions
    Balance holder: Municipal Enterprise "Central City Hospital of Oleksandriya"
    Financing: Co-financing possible under grant conditions
  • Social infrastructure

Illustration

Major renovation of the building of the Municipal Enterprise “Primary Health Care Center of Oleksandriia”

The project provides for: replacement of windows; interior finishing; accessibility improvements; replacement of internal electrical, heating, and water supply networks; installation of communication systems; arrangement of operating units in the traumatology and surgery departments; and equipping with modern medical equipment and furniture.

estimated budget: 2 500 000 €

    Project initiator: Oleksandriya City Council
    Implementer: Municipal Enterprise "Central City Hospital of Oleksandriya" or under grant conditions
    Balance holder: Municipal Enterprise "Central City Hospital of Oleksandriya"
    Financing: Co-financing possible under grant conditions
  • Social infrastructure

Illustration

Major renovation of the medical building of the Municipal Enterprise "Central City Hospital"

 The project provides for: replacement of the roof and windows; insulation of the façade; interior finishing; accessibility improvements; replacement of internal electrical, heating, and water supply networks; installation of communication systems; replacement of two elevators; renovation of the rehabilitation department; and equipping with modern medical equipment and furniture.

estimated budget: 1 500 000 €

    Project initiator: Oleksandriya City Council
    Implementer: Municipal Enterprise "Central City Hospital of Oleksandriya" or under grant conditions
    Balance holder: Municipal Enterprise "Central City Hospital of Oleksandriya"
    Financing: Co-financing possible under grant conditions
  • Social infrastructure

Illustration

Reconstruction of the Polyclinic Building of the Municipal Enterprise “Central City Hospital of Oleksandriya” into a Polyclinic with a Treatment Department

The project is seeking funding for the major renovation of the polyclinic and the renovation of the building façade, replacement of engineering networks, interior finishing of the premises in accordance with modern sanitary and construction standards, improvement of accessibility conditions for people with limited mobility, and upgrading of medical equipment

estimated budget: 4 300 000 €

    Project initiator: Oleksandriya City Council
    Implementer: Municipal Enterprise "Central City Hospital of Oleksandriya" or under grant conditions
    Balance holder: Municipal Enterprise "Central City Hospital of Oleksandriya"
    Financing: Co-financing possible under grant conditions
  • Social infrastructure

Illustration

 Reconstruction of the Polyclinic Building into a Polyclinic with Treatment Departments

The project provides for: replacement of the roof and windows; insulation of the façades; interior finishing; accessibility improvements; replacement of internal heating and water supply networks; installation of communication systems; arrangement of operating units in the urology and gynecology departments; and equipping with modern medical equipment and furniture.

estimated budget: 4 300 000 €

    Project initiator: Oleksandriya City Council
    Implementer: Municipal Enterprise "Central City Hospital of Oleksandriya" or under grant conditions
    Balance holder: Municipal Enterprise "Central City Hospital of Oleksandriya"
    Financing: Co-financing possible under grant conditions
  • Social infrastructure

Illustration

Reconstruction of the Property Complex of the Municipal Enterprise “Central City Hospital of Oleksandriya”

The hospital requires: renovation and modernization of buildings, including roofs, façades, windows and doors, flooring, heating and water supply systems, and modern communication systems; equipping with modern equipment and furniture; ensuring patient safety and comfort, as well as suitable working conditions for medical staff; and landscaping of the premises.

estimated budget: 35 600 000 €

    Project initiator: Oleksandriya City Council
    Implementer: Municipal Enterprise "Central City Hospital of Oleksandriya" or under grant conditions
    Balance holder: Municipal Enterprise "Central City Hospital of Oleksandriya"
    Financing: Co-financing possible under grant conditions
  • Social infrastructure

Illustration

 Reconstruction of the Maternity Ward with Subsequent Conversion into a Perinatal Center

The project provides for: replacement of the roof and windows; insulation of the façades; interior finishing; accessibility improvements; replacement of internal heating and water supply networks; installation of communication systems; ensuring safe and comfortable conditions for mothers and children; and equipping with modern medical equipment and furniture.

estimated budget: 4 300 000 €

    Project initiator: Oleksandriya City Council
    Implementer: Municipal Enterprise "Central City Hospital of Oleksandriya" or under grant conditions
    Balance holder: Municipal Enterprise "Central City Hospital of Oleksandriya"
    Financing: Co-financing possible under grant conditions
  • Social infrastructure

Illustration

Modernization of the Semi-Centralized Heating System

 The project provides for improving the operation of the centralized heating system and increasing its energy efficiency. As a result, the quality of heating services for end users will be enhanced.

estimated budget: 2 200 000 €

    Project initiator: Oleksandriya City Council
     Implementer and balance holder: Oleksandriya City Council
    Financing: As needed
  • Critical infrastructure

Illustration

Modernization of the Heating Supply System in the City of Oleksandriya

The heating network is 80% worn out and 15% in an emergency condition, requiring replacement. Between 2023 and 2025, there were nearly 100 pipeline bursts, leaving residential buildings, schools, hospitals, and other social infrastructure facilities without heat for extended periods

estimated budget: 520 000 000 €

    Project initiator: Oleksandriya City Council
    Implementer and Balance Holder: Municipal Enterprise “Teplokomunenergo”
    Financing: As needed
  • Critical infrastructure

Illustration

Modernization of the Heating Supply System through the Reconstruction of Boiler House No. 35 in Oleksandriya

The project aims to improve the operation of the centralized heating system and increase its energy efficiency. As a result, the quality of heating services will be enhanced. Implementation of the project will enable significant savings in fuel, electricity, water, and operational costs

estimated budget: 1 900 000 €

    Project initiator: Oleksandriya City Council
    Implementer and Balance Holder: Municipal Enterprise “Teplokomunenergo”
  • Critical infrastructure

Illustration

Purchase of Buses for the Municipal Enterprise “Oleksandriya Transport"

The project involves the renewal and expansion of the bus fleet of the Municipal Enterprise “Oleksandriya Transport” through the acquisition of modern, eco-friendly, and energy-efficient low-floor buses of medium and large capacity, designed for urban transportation

estimated budget: 500 000 €

    Project initiator: Oleksandriya City Council
    Implementer and Balance Holder: Municipal Enterprise “Oleksandriya Transport”
  • Social infrastructure

Detailed information about the projects of the Oleksandriya community, as well as all participating and guest communities of the ReBuild Ukraine project, can be found in the COMMUNITY PROJECTS CATALOG

Illustration

PRIORITIES of International Cooperation

Energy and Sustainable Development – Implementation of renewable energy, energy-efficient solutions, and climate-neutral technologies for social and municipal infrastructure.

Illustration

Medical and Social Infrastructure

Development of modern medical infrastructure, support for internally displaced persons (IDPs), and ensuring population access to quality medical and social services.

Illustration

Modern Infrastructure and Innovations

Creation of educational, cultural, and workspaces, digitalization of municipal services, and development of small and medium-sized businesses.

Illustration

International Partnership and Investment

Collaboration with European associations and international organizations to implement joint projects and attract funding.

 Geographical Features

Illustration
  • Total area – 26, 130 haKirovohrad region

     City of Oleksandriya, urban-type settlement Oleksandriiske, villages Zvenyhorodka, Marto-Ivanivka, Ivanivka, Oleksandro-Stepanivka, Holovkivske, Izmailivka, Pishchanyi Brid, Korolivka, Vydne, Haiok, Pustelnykove.

● Located in the central part of Ukraine, in the northeastern part of Kirovohrad Oblast, within Oleksandriia Raion.● Has a favorable geographical location — at the intersection of major transport routes in central Ukraine.● Key state highways pass through the city of Oleksandriia: H01 Kyiv – Znamianka (via Kremenchuk)● M12 (part of M04) Stryi – Znamianka (connecting Lviv, Vinnytsia, Kropyvnytskyi)● M04 Dnipro – Znamianka (further to Luhansk)● European route E50

 Goals of the Community’s Participation in the ReBuild Ukraine Project

  • Seeking and Establishing Partnerships

    with Foreign Municipalities, Funds, and Investors

  • Presentation of the Investment Potential

    and Key Advantages of the Territory

  • Attraction of Financial and Technical Resources

    for Community Development

  •  Implementation of Energy, Infrastructure, and Socio-Economic Projects


investment attractiveness

The Oleksandriya community is one of the largest and most economically developed territorial communities in Kirovohrad Region. Thanks to its favorable geographical location, developed infrastructure, and support from local authorities, the community is an attractive destination for investment across various economic sectors.

 Sectors for Investment


Agro-Processing and Food Industry

Establishment of modern facilities with added value for agricultural products

Construction Materials Manufacturing

Cement, Brick, Concrete, Wooden Structures

Mechanical Engineering and Metalworking

Modernization of Existing Enterprises and Launch of New Production Lines

Alternative Energy

Solar and Wind Power Plants, Bioenergy

Logistics and Transportation

Development of warehouses, terminals, and transport hubs thanks to convenient location along key highways and railways

Economic Potential

  • 1

    Industry

    95 large and medium-sized enterprises, with key sectors including mechanical engineering, metalworking, food industry, and construction materials.

  • 2

    Agricultural Sector

    Over 150,000 ha of arable land, producing grains, oilseeds, vegetables, and fruits.

  • 3

    Entrepreneurship and Small Business

    More than 1,500 companies and 3,200 individual entrepreneurs (FOPs) benefit from business incubators, consulting services, and grant programs.

  • 4

    Skilled Workforce

    The community has vocational schools, colleges, and higher education institutions that train specialists, offering internships and practical experience in cooperation with businesses.

  • 5

    Transparent Governance

    Simplified permitting system and availability of land plots for investors, along with consulting support and an investment passport for the community.

Illustration

 87,767 community residents

 As of 01.01.2022

COMMUNITY DEVELOPMENT PROGRAMS

    The Investment Activity, Recovery, and Resilience Program for 2025–2028 has been developed
    The Community Social and Economic Development Program is in place
    A Medium-Term Public Investment Plan for 2026–2028 has been prepared
    The Community Development Strategy for 2026–2036 and an action plan for its implementation are being developed (in a new edition)

 Implementation of Strategic Projects

4 Cogeneration Units for the Municipal Enterprise “Teplokomunenergo”

Partners / Participants / Donors: USAID under the Energy Security Project (ESP)

Project Goal:
Increase energy efficiency, reduce atmospheric emissions, and lower energy costs

Implementation:
4 cogeneration units have been installed

Reconstruction of the Anesthesiology Department with Intensive Care Beds and Major Roof Renovation of the Cluster Hospital

Partners / Participants / Donors: International Organization for Migration (IOM), HREF Project – Community Recovery and Resilience

Project Goal:
Preserve the institution’s infrastructure, improve conditions for critically ill patients, enhance energy efficiency and inclusivity, modernize equipment, and ensure safe conditions for staff and patients throughout the inpatient department

Implementation:
Currently underway

Industrial Park “STAN INVEST”

Partners / Participants / Donors: LLC Industrial Park “STAN INVEST”
Project Goal: Facilitate the attraction of domestic and foreign investments, create favorable conditions for the development of industrial production, small and medium-sized businesses, provide new jobs, and modernize the economy
Implementation: Registered in the Register of Industrial (Industrial) Parks of Ukraine

 Directions for Local Economic Development

Illustration
    Industry and Processing
    Agro-Industrial Complex and Agriculture
    Industrial Park
    Support for Local and Relocated Businesses
Illustration

The Oleksandriya community invites international partners to collaborate for development and European integration

serhii kuzmenko

Mayor of the City Council

Contacts:Hanna Chasnyk, Head of the Investment and Innovation Department, City Council Economic ManagementPhone: +38 050 987 03 29Email: moc.liamg%40atyna.kynsahc28000, Kirovohrad Region, Oleksandriya Territorial Community, Oleksandriya, 59 Sobornyi Avenue